Sanjeevini residency II Extension

by MB Infra and Developers · 21 plots · 1.31 acres · Bengaluru South

Delivered on time Completed: the builder filed for completion on 20 Mar 2024, by the date it promised.

Location report

At a glance

Was it on time?Delivered on time
Completed

The builder filed for completion on 20 Mar 2024, by the date it promised.

How much is sold?Unknown
Not reported

The builder has not filed bookings on RERA.

How crowded is it?About the same
16 plots per acre

Similar projects within 3 km: 17 per acre. 45% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?3 due so far
67% on time

Of its 3 RERA projects in Bengaluru Urban: 2 delivered on time, 1 late (after the date first promised).

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

Was it delivered on time?

  1. Work started15 Mar 2023
  2. Approved by RERA2 Sep 2023
  3. Completion filed20 Mar 2024

    The builder told RERA the project is complete. Ask for the occupancy certificate before moving in.

No quarterly construction update is filed on this project's RERA page.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

What's being built?

This project's RERA page has no flat-by-flat list, so these are the builder's summary figures, exactly as filed. Builders often give the area of all plots of a size together there: a figure marked "in all" covers every one of them, not one plot.

9.14 x 9.14m
2,691 sq ft in all
250.0 m² area for all 3 plots together, as filed
3 plots · 14% of the project
9.14 x 12.19m
4,801 sq ft in all
446.0 m² area for all 4 plots together, as filed
4 plots · 19% of the project
Odd Sites
—
Not filed
14 plots · 67% of the project

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Plots per acre

This project16
Typical within 3 km (10)17
Typical in the city (593)16

Fewer plots on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project45%
Typical within 3 km (13)46%
Typical in the city (730)46%

The share of the land not built on, which includes roads.

Land
1.31 acres

5,311 m²

Plot area (the sites)
55% of the land

2,918 m²

Roads
2,393 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active plotted development projects with a land area on RERA; the comparison is ours.

Who is building it?

All 3 RERA projects of MB Infra and Developers on the map

The company

Registered as
MB Infra and Developers
Type
Partnership Firm
PAN
ABAFM6217C
GSTIN
29ABAFM6217C1ZJ

Its other registrations on RERA Karnataka

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹4.5 crBuilding and development ₹58.2 lakhTotal ₹5.1 cr

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station10.42 kmReliable
  • Nearest railway station7.63 kmReliable
  • Bus stops within 500 m1Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km0Caveat
  • Nearest lake / water body (≥2 ha)3.63 kmCaveat

Hospitals

  • Nearest hospital5.03 kmCaveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionTavarekere PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km1Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)25.53 kmReliable
  • Nearest sewage treatment plant8.46 kmCaveat
  • Industrial zones within 1 km2Caveat
  • Nearest airfield runway (any, incl. military)31.91 kmCaveat
  • Nearest commercial-airport runway48.06 kmReliable
  • Distance to runway approach-path proxy41.44 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)0Caveat

ReliableFrom our location report at the builder-entered pin (12.89385, 77.36533), 2026-10-24. Each figure's source and caveat are in the full report.