Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

SAMPOOJITHA HEIGHTS

by SAMPOOJITHA DEVELOPERS · 100 homes · 1.37 acres · 1 tower · Bengaluru East

Upcoming Under construction, due Dec 2029. 30% built with 11% of the time used. 11% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
30% built

Due 31 Dec 2029. 11% of the time from RERA approval to the deadline has passed.

Built30%
Time used11%
How much is sold?89 left
11% booked

11 of 100 homes, as the builder reported for Q2 2026-27.

How crowded is it?About the same
73 homes per acre

Similar projects within 3 km: 80 per acre. 50% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?No other record
Only this project

It is the only RERA project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started10 Dec 2025
  2. Approved by RERA27 May 2026
  3. Today24 Oct 2026

    11% of the time to the deadline has passed.

  4. If it slips like a typical project2 Oct 2030

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q1 2026-2723%
Q2 2026-2730%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

11 booked89 leftQ2 2026-27

Still available: 50 × 2 BHK, 39 × 3 BHK.

Booked, by type

2 BHK6 of 56
3 BHK5 of 44

Booked, each quarter

Q1 2026-270 of 100
Q2 2026-2711 of 100

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

2 BHK
  • 780 sq ft12 homes72.5 m²
  • 794 sq ft12 homes73.8 m²
  • 750 sq ft8 homes69.7 m²
  • 761 sq ft8 homes70.7 m²
  • and 16 homes in other sizes
Typically 48 m² land share · 22 m² balcony/terrace · 1 parking space
56 homes · 56% of the project
3 BHK
  • 1,040 sq ft24 homes96.6 m²
  • 976 sq ft4 homes90.7 m²
  • 1,031 sq ft4 homes95.8 m²
  • 1,070 sq ft4 homes99.4 m²
  • and 8 homes in other sizes
Typically 64 m² land share · 28 m² balcony/terrace · 1 parking space
44 homes · 44% of the project

Carpet areas from the builder's flat-by-flat list on RERA, each size as listed with how many homes have it. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Building 14 floors

Building 1: 100 homes, 15 m tall

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project73
Typical within 3 km (95)80
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project50%
Typical within 3 km (94)55%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
1.37 acres

5,564 m²

Ground covered by buildings
50% of the land

2,779 m²

Floor-area ratio
1.75

Floors built per unit of land: 1.75 m² of floors for each m² of land.

Parking
1.10 per home

110 covered, 0 open

Built-up area, all floors
1,56,012 sq ft

14,494 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

This is the only project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

The company

Registered as
SAMPOOJITHA DEVELOPERS
Type
Partnership Firm
PAN
AERFS5722G
GSTIN
29AERFS5722G1ZI

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹25.0 crBuilding and development ₹58.9 crTotal ₹83.9 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q1 2026-27₹0.0 lakh₹0.0 lakh
Q2 2026-27₹1.6 cr₹0.0 lakh

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station1.14 kmReliable
  • Nearest railway station1.36 kmReliable
  • Bus stops within 500 m0Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km4Caveat
  • Nearest lake / water body (≥2 ha)2.06 kmCaveat

Hospitals

  • Nearest hospital0.6 kmCaveat

Schools

  • Schools in pincode 560067 (UDISE+ census)57Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km6Caveat
  • Median pupil-teacher ratio, schools within 1 km24.6 :1Caveat
  • Schools with library + playground + ICT lab (1 km)1Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionKadugodi PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km2Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • In an IISc groundwater-critical ward (2025 outlook)yesCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km5Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)8.93 kmReliable
  • Nearest sewage treatment plant2.89 kmCaveat
  • Industrial zones within 1 km0Caveat
  • Nearest airfield runway (any, incl. military)6.19 kmCaveat
  • Nearest commercial-airport runway20.67 kmReliable
  • Distance to runway approach-path proxy19.47 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)2Caveat

ReliableFrom our location report at the builder-entered pin (13.00391, 77.75149), 2026-10-24. Each figure's source and caveat are in the full report.