RERA project · Residential/Group Housing
Samanvitha Siena Terra
by SAMANVITHA PROJECTS · 16 homes · 0.26 acres · 1 tower · Bengaluru South
Upcoming Under construction, due Apr 2029. 56% built with 12% of the time used. 0% of homes booked.
At a glance
Due 14 Apr 2029. 12% of the time from RERA approval to the deadline has passed.
0 of 16 homes, as the builder reported for Q2 2026-27.
Similar projects within 3 km: 67 per acre. 44% of the land is left open.
Complaints to RERA about this project.
No litigation on the land or the project, as the builder declares it to RERA.
It is the only RERA project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.
These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.
When will it be ready?
- Work started15 Apr 2026
- Approved by RERA20 Jun 2026
- Today24 Oct 2026
12% of the time to the deadline has passed.
- Deadline14 Apr 2029
The date it must be complete by.
- If it slips like a typical project14 Jan 2030
35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.
How much is built, each quarter
Built, as the builder reports itTime used by then
When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.
CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.
How much is sold?
Still available: 16 × 3 BHK.
Booked, by type
Booked, each quarter
Booked means sold or reserved, as the builder reports it. It says nothing about prices.
CaveatFrom the builder's quarterly updates to RERA Karnataka.
What's being built?
Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.
Towers
Samanvitha projects: 16 homes, 15 m tall
Amenities
- Electricity 15 m²
- CCTV Surveillance 15 m²
- Gym 35 m²
- Power Backup 15 m²
- Water and Sanitation 45 m²
CaveatAs registered by the builder on RERA Karnataka.
How crowded is it?
Homes per acre
Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.
Land left open
The share of the land not built on, which includes roads.
- Land
- 0.26 acres
- Ground covered by buildings
- 56% of the land
- Floor-area ratio
- 2.25
- Parking
- 2.75 per home
- Built-up area, all floors
- 31,226 sq ft
1,065 m²
592 m²
Floors built per unit of land: 2.25 m² of floors for each m² of land.
22 covered, 0 open
2,901 m²
CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.
Who is building it?
This is the only project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.
The company
- Registered as
- SAMANVITHA PROJECTS
- Type
- Partnership Firm
- PAN
- AEQFS4573N
- GSTIN
- 29AEQFS4573N1ZX
CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.
Paperwork and legal
- Registered with RERAPRM/KA/RERA/1251/310/PR/200626/008730 · Approved
- Building plan approvedBBMP - Bruhat Bengaluru Mahanagara Palike · GBA/BMH/DDTP/0121/25-26 · 20 Mar 2026
- Litigation on the landNone declared
- Litigation on the projectNone declared in the Q2 2026-27 update
- Water sourceBWSSB
Complaints to RERA about this project
None on RERA Karnataka.
Documents
98 files on the RERA page: Approved plan ↗.
CaveatAs filed on RERA Karnataka. Complaints are listed without the names of the people who filed them.
Project cost
Money from buyers, each quarter
| Quarter | Collected from buyers | Withdrawn from the project account |
|---|---|---|
| Q1 2026-27 | ₹0.0 lakh | ₹0.0 lakh |
| Q2 2026-27 | ₹1.1 cr | ₹44.1 lakh |
Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.
CaveatCost as certified by the builder's chartered accountant at registration.
What's around it?
Open the full location report on the map
Metro, rail, bus, airport
- Nearest operational metro station3.93 kmReliable
- Nearest railway station4.18 kmReliable
- Bus stops within 500 m0Caveat
Parks, shops, daily needs
- Supermarkets within 1 km5Caveat
- Parks within 1 km11Caveat
- Nearest lake / water body (≥2 ha)0.49 kmCaveat
Hospitals
- Nearest hospital0.49 kmCaveat
Schools
- Schools in pincode 560102 (UDISE+ census)38Caveat
- Private (classes 1–10 or 1–12), government and central schools within 1 km1Caveat
- Schools with library + playground + ICT lab (1 km)1Caveat
Police and crime
- Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
- Police station jurisdictionBellanduru PSReliable
Air quality
- PM2.5, recent 24 h avg (nearest CPCB station)18 µg/m³Caveat
Flood and waterlogging
- BBMP-listed flood / low-lying spots within 1 km0Caveat
Water availability
- Groundwater stage (CGWB block assessment)Over ExploitedCaveat
- In an IISc groundwater-critical ward (2025 outlook)noCaveat
Power reliability
- Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
- Un/partially-electrified layouts within 1 km0Caveat
Landfills, sewage plants, industry, aircraft
- Nearest named landfill / dump site (≥2 ha)2.73 kmReliable
- Nearest sewage treatment plant1.17 kmCaveat
- Industrial zones within 1 km0Caveat
- Nearest airfield runway (any, incl. military)4.18 kmCaveat
- Nearest commercial-airport runway30.79 kmReliable
- Distance to runway approach-path proxy29.71 kmCaveat
Upcoming infrastructure
- Under-construction projects within 3 km (verified)1Reliable
- Earlier-stage projects within 3 km (sanctioned/tendered/observed)2Caveat
ReliableFrom our location report at the builder-entered pin (12.91201, 77.66762), 2026-10-24. Each figure's source and caveat are in the full report.