Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

SAI GREENWOODS-PHASE2

by United Infrastructures · 217 homes · 5.70 acres · 2 towers · Bengaluru East

Upcoming Under construction, due Dec 2028. 55% built with 48% of the time used. 62% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
55% built

Due 31 Dec 2028. 48% of the time from RERA approval to the deadline has passed.

Built55%
Time used48%
How much is sold?82 left
62% booked

135 of 217 homes, as the builder reported for Q2 2026-27.

How crowded is it?Less crowded
38 homes per acre

Similar projects within 3 km: 80 per acre. 76% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?1 due so far
100% on time

Of its 3 RERA projects in Bengaluru Urban: 1 delivered on time, 2 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started1 Oct 2024
  2. Approved by RERA5 Oct 2024
  3. Today24 Oct 2026

    48% of the time to the deadline has passed.

  4. If it slips like a typical project2 Oct 2029

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2639%
Q4 2025-2648%
Q1 2026-2750%
Q2 2026-2755%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

Block A55%
Block B55%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

135 booked82 leftQ2 2026-27

Still available: 46 × 1 BHK, 12 × 2 BHK, 11 × 2.5 BHK, 13 × 4 BHK.

Booked, by type

1 BHK0 of 46
2 BHK16 of 28
2.5 BHK84 of 95
3 BHK20 of 20
4 BHK15 of 28

Booked, each quarter

Q3 2025-26103 of 217
Q4 2025-26120 of 217
Q1 2026-27121 of 217
Q2 2026-27135 of 217

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

2.5 BHK
989 sq ft
92 m² carpet · sizes 921–1,107 sq ft (46 at this size)
50 m² land share · 16 m² balcony/terrace · 1 parking space
95 homes · 44% of the project
1 BHK
495 sq ft
46 m² carpet · sizes 461–579 sq ft (16 at this size)
25 m² land share · 8 m² balcony/terrace · 1 parking space
46 homes · 21% of the project
2 BHK
800 sq ft
74 m² carpet
39 m² land share · 9 m² balcony/terrace · 1 parking space
28 homes · 13% of the project
4 BHK
1,394 sq ft
130 m² carpet
68 m² land share · 17 m² balcony/terrace · 1 parking space
28 homes · 13% of the project
3 BHK
1,107 sq ft
103 m² carpet
55 m² land share · 16 m² balcony/terrace · 1 parking space
20 homes · 9% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Block A14 floors
Block B14 floors

Block A: 109 homes, 45 m tall, 1 basement · Block B: 108 homes, 44 m tall, 1 basement

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project38
Typical within 3 km (108)80
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project76%
Typical within 3 km (107)54%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
5.70 acres

23,066 m²

Ground covered by buildings
24% of the land

5,570 m²

Floor-area ratio
2.25

Floors built per unit of land: 2.25 m² of floors for each m² of land.

Parking
2.67 per home

290 covered, 0 open

Built-up area, all floors
3,40,807 sq ft

31,662 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 3 RERA projects of United Infrastructures on the map

The company

Registered as
United Infrastructures
Type
Partnership Firm
PAN
AAGFU8252L
GSTIN
29AAGFU8252L1ZH

Its other registrations on RERA Karnataka

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹27.9 crBuilding and development ₹174.4 crTotal ₹202.3 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹17.6 cr₹16.5 cr
Q4 2025-26₹22.4 cr₹15.7 cr
Q1 2026-27₹10.7 cr₹9.2 cr
Q2 2026-27₹13.4 cr₹9.4 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station1.87 kmReliable
  • Nearest railway station2.18 kmReliable
  • Bus stops within 500 m0Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km0Caveat
  • Nearest lake / water body (≥2 ha)1.58 kmCaveat

Hospitals

  • Nearest hospital1.46 kmCaveat

Schools

  • Schools in pincode 560067 (UDISE+ census)57Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km4Caveat
  • Schools with library + playground + ICT lab (1 km)1Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionKadugodi PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • In an IISc groundwater-critical ward (2025 outlook)yesCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km3Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)8.74 kmReliable
  • Nearest sewage treatment plant2.01 kmCaveat
  • Industrial zones within 1 km1Caveat
  • Nearest airfield runway (any, incl. military)7.13 kmCaveat
  • Nearest commercial-airport runway20.59 kmReliable
  • Distance to runway approach-path proxy19.61 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)1Caveat

ReliableFrom our location report at the builder-entered pin (13.00380, 77.74280), 2026-10-24. Each figure's source and caveat are in the full report.