Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

SAI CRYSTAL

by SLV BUILDERS · 19 homes · 0.23 acres · 1 tower · Bengaluru East

Past due, no completion filed Past its deadline of 30 Oct 2024, and no completion is filed on RERA. Some finished projects never file, so ask the builder for the occupancy certificate.

Location report

At a glance

Is it on schedule?Past due
Past its deadline

The deadline was 30 Oct 2024, and no completion is filed.

How much is sold?Unknown
Not reported

The builder has not filed bookings on RERA.

How crowded is it?More crowded
81 homes per acre

Similar projects within 3 km: 70 per acre. 46% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?2 due so far
0% on time

Of its 2 RERA projects in Bengaluru Urban: 0 delivered on time, 1 late (after the date first promised), 1 past due with no completion filed.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started1 Sep 2023
  2. Approved by RERA7 Dec 2023
  3. Deadline30 Oct 2024

    Passed with no completion filed.

No quarterly construction update is filed on this project's RERA page.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

What's being built?

3 BHK
890 sq ft
83 m² carpet · sizes 890–950 sq ft (4 at this size)
54 m² land share · 11 m² balcony/terrace · 1 parking space
11 homes · 58% of the project
2 BHK
755 sq ft
70 m² carpet · sizes 755–772 sq ft (4 at this size)
44 m² land share · 10 m² balcony/terrace · 1 parking space
8 homes · 42% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Sai Crystal3 floors

Sai Crystal: 19 homes, 11 m tall, 1 basement

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project81
Typical within 3 km (85)70
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project46%
Typical within 3 km (85)69%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
0.23 acres

951 m²

Ground covered by buildings
54% of the land

509 m²

Floor-area ratio
1.72

Floors built per unit of land: 1.72 m² of floors for each m² of land.

Parking
1.16 per home

22 covered, 0 open

Built-up area, all floors
28,923 sq ft

2,687 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 2 RERA projects of SLV BUILDERS on the map

The company

Registered as
SLV BUILDERS
Type
Partnership Firm
PAN
ACVFS3255L
GSTIN
29ACVFS3255L1Z7

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹5.6 crBuilding and development ₹5.9 crTotal ₹11.5 cr

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station6.82 kmReliable
  • Nearest railway station1.7 kmReliable
  • Bus stops within 500 m0Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km1Caveat
  • Parks within 1 km8Caveat
  • Nearest lake / water body (≥2 ha)0.56 kmCaveat

Hospitals

  • Nearest hospital1.54 kmCaveat

Schools

  • Schools in pincode 560035 (UDISE+ census)45Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km5Caveat
  • Median pupil-teacher ratio, schools within 1 km23 :1Caveat
  • Schools with library + playground + ICT lab (1 km)4Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionMarathahalli PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • Groundwater depth at nearest CGWB well4.5 m below groundCaveat
  • In an IISc groundwater-critical ward (2025 outlook)noCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)5.71 kmReliable
  • Nearest sewage treatment plant1.41 kmCaveat
  • Industrial zones within 1 km1Caveat
  • Nearest airfield runway (any, incl. military)3.79 kmCaveat
  • Nearest commercial-airport runway29.91 kmReliable
  • Distance to runway approach-path proxy29.29 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)1Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)5Caveat

ReliableFrom our location report at the builder-entered pin (12.91908, 77.69564), 2026-10-24. Each figure's source and caveat are in the full report.