RERA project · Residential/Group Housing

RUBBY CASTLE 1

by RUBBY ARC LLP · 32 homes · 0.47 acres · 1 tower · Bengaluru North

Upcoming Under construction, due Apr 2029. 80% built with 49% of the time used. 25% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
80% built

Due 30 Apr 2029. 49% of the time from RERA approval to the deadline has passed.

Built80%
Time used49%
How much is sold?24 left
25% booked

8 of 32 homes, as the builder reported for Q2 2026-27.

How crowded is it?Less crowded
68 homes per acre

Similar projects within 3 km: 82 per acre. 43% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?No other record
Only this project

It is the only RERA project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Approved by RERA21 May 2024
  2. Work started19 Jun 2024
  3. Today24 Oct 2026

    49% of the time to the deadline has passed.

  4. If it slips like a typical project30 Jan 2030

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2670%
Q4 2025-2675%
Q1 2026-2777%
Q2 2026-2780%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

8 booked24 leftQ2 2026-27

Still available: 4 × 2 BHK, 20 × 3 BHK.

Booked, by type

2 BHK2 of 6
3 BHK6 of 26

Booked, each quarter

Q3 2025-263 of 32
Q4 2025-265 of 32
Q1 2026-275 of 32
Q2 2026-278 of 32

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3 BHK
1,197 sq ft
111 m² carpet · sizes 1,143–1,562 sq ft (3 at this size)
62 m² land share · 15 m² balcony/terrace · 1 parking space
26 homes · 81% of the project
2 BHK
868 sq ft
81 m² carpet · sizes 868–1,014 sq ft (3 at this size)
42 m² land share · 10 m² balcony/terrace · 1 parking space
6 homes · 19% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Tower A3 floors

Tower A: 32 homes, 12 m tall, 1 basement

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project68
Typical within 3 km (29)82
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project43%
Typical within 3 km (30)53%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
0.47 acres

1,900 m²

Ground covered by buildings
57% of the land

1,086 m²

Floor-area ratio
1.02

Floors built per unit of land: 1.02 m² of floors for each m² of land.

Parking
1.19 per home

38 covered, 0 open

Built-up area, all floors
67,608 sq ft

6,281 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

This is the only project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

The company

Registered as
RUBBY ARC LLP
Type
Partnership Firm
Company number
ACA-3705

CIN or LLPIN, from the Registrar of Companies.

PAN
ABGFR7598K
GSTIN
29ABGFR7598K1Z5

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹15.8 crBuilding and development ₹15.7 crTotal ₹31.5 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹3.0 cr₹96.9 lakh
Q4 2025-26₹72.5 lakh₹1.3 cr
Q1 2026-27₹1.2 cr₹83.0 lakh
Q2 2026-27₹2.0 cr₹1.7 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station5.65 kmReliable
  • Nearest railway station4.59 kmReliable
  • Bus stops within 500 m3Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km1Caveat
  • Parks within 1 km5Caveat
  • Nearest lake / water body (≥2 ha)0.94 kmCaveat

Hospitals

  • Nearest hospital0.1 kmCaveat

Schools

  • Schools in pincode 560097 (UDISE+ census)74Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km11Caveat
  • Median pupil-teacher ratio, schools within 1 km15.8 :1Caveat
  • Schools with library + playground + ICT lab (1 km)6Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionVidhyaranyapura PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • In an IISc groundwater-critical ward (2025 outlook)noCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km19Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)4.35 kmReliable
  • Nearest sewage treatment plant1.41 kmCaveat
  • Industrial zones within 1 km2Caveat
  • Nearest airfield runway (any, incl. military)5.21 kmCaveat
  • Nearest commercial-airport runway19.42 kmReliable
  • Distance to runway approach-path proxy12.77 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)0Caveat

ReliableFrom our location report at the builder-entered pin (13.08232, 77.54828), 2026-10-24. Each figure's source and caveat are in the full report.