ROYAL ENCLAVE

by MEGA BUILDERS · 60 homes · 0.67 acres · 1 tower · Bengaluru South

Upcoming Under construction, due Mar 2027. 90% built with 85% of the time used. 73% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
90% built

Due 31 Mar 2027. 85% of the time from RERA approval to the deadline has passed.

Built90%
Time used85%
How much is sold?16 left
73% booked

44 of 60 homes, as the builder reported for Q2 2026-27.

How crowded is it?About the same
89 homes per acre

Similar projects within 3 km: 90 per acre. 49% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?No other record
Only this project

It is the only RERA project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started15 Feb 2024
  2. Approved by RERA18 May 2024
  3. Today24 Oct 2026

    85% of the time to the deadline has passed.

  4. If it slips like a typical project31 Dec 2027

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2676%
Q4 2025-2683%
Q1 2026-2786%
Q2 2026-2790%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

44 booked16 leftQ2 2026-27

Still available: 10 × 2 BHK, 6 × 3 BHK.

Booked, by type

2 BHK20 of 30
3 BHK24 of 30

Booked, each quarter

Q3 2025-2617 of 60
Q4 2025-2628 of 60
Q1 2026-2737 of 60
Q2 2026-2744 of 60

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3 BHK
  • 1,068 sq ft5 homes99.2 m²
  • 1,077 sq ft5 homes100.1 m²
  • 1,082 sq ft5 homes100.5 m²
  • 1,105 sq ft5 homes102.7 m²
  • and 10 homes in other sizes
Typically 52 m² land share · 11 m² balcony/terrace · 1 parking space
30 homes · 50% of the project
2 BHK
  • 751 sq ft5 homes69.8 m²
  • 760 sq ft5 homes70.6 m²
  • 761 sq ft5 homes70.7 m²
  • 917 sq ft5 homes85.2 m²
  • and 10 homes in other sizes
Typically 36 m² land share · 7 m² balcony/terrace · 1 parking space
30 homes · 50% of the project

Carpet areas from the builder's flat-by-flat list on RERA, each size as listed with how many homes have it. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Royal Enclave6 floors

Royal Enclave: 60 homes, 15 m tall, 1 basement

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project89
Typical within 3 km (15)90
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project49%
Typical within 3 km (15)36%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
0.67 acres

2,729 m²

Ground covered by buildings
51% of the land

1,398 m²

Floor-area ratio
2.50

Floors built per unit of land: 2.50 m² of floors for each m² of land.

Parking
2.20 per home

66 covered, 0 open

Built-up area, all floors
96,929 sq ft

9,005 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

This is the only project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

The company

Registered as
MEGA BUILDERS
Type
Partnership Firm
PAN
AASFM0674Q
GSTIN
29AASFM0674Q1Z9

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹21.8 crBuilding and development ₹34.3 crTotal ₹56.2 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹3.7 cr₹3.7 cr
Q4 2025-26₹5.7 cr₹5.7 cr
Q1 2026-27₹5.4 cr₹5.4 cr
Q2 2026-27₹11.0 cr₹11.0 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station0.42 kmReliable
  • Nearest railway station2.66 kmReliable
  • Bus stops within 500 m4Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km10Caveat
  • Nearest lake / water body (≥2 ha)1.93 kmCaveat

Hospitals

  • Nearest hospital0.5 kmCaveat

Schools

  • Schools in pincode 560058 (UDISE+ census)101Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km7Caveat
  • Median pupil-teacher ratio, schools within 1 km28.8 :1Caveat
  • Schools with library + playground + ICT lab (1 km)3Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionPeenya PSReliable

Air quality

  • PM2.5, recent 24 h avg (nearest CPCB station)31 µg/m³Caveat

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km1Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • In an IISc groundwater-critical ward (2025 outlook)noCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)9.67 kmReliable
  • Nearest sewage treatment plant0.35 kmCaveat
  • Industrial zones within 1 km12Caveat
  • Nearest airfield runway (any, incl. military)8.66 kmCaveat
  • Nearest commercial-airport runway24.54 kmReliable
  • Distance to runway approach-path proxy18.4 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)3Caveat

ReliableFrom our location report at the builder-entered pin (13.03410, 77.52866), 2026-10-24. Each figure's source and caveat are in the full report.