by Rohan Procon LLP · 163 homes · 2.65 acres · 5 towers · Bengaluru East

Delivered late Completed: the builder filed for completion on 17 Feb 2022, 232 days after the date it first promised.

Location report

At a glance

Was it on time?Delivered late
Completed late

The builder filed for completion on 17 Feb 2022, 232 days after the date it first promised.

How much is sold?Unknown
Not reported

The builder has not filed bookings on RERA.

How crowded is it?Less crowded
62 homes per acre

Similar projects within 3 km: 81 per acre. 83% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?Unknown
Not stated

The RERA page doesn't say.

What is the builder's record?12 due so far
75% on time

Of its 13 RERA projects in Bengaluru Urban: 9 delivered on time, 2 late (after the date first promised), 1 past due with no completion filed, 1 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

Was it delivered on time?

  1. Work started1 Dec 2017
  2. Approved by RERA23 Dec 2017
  3. First promised30 Jun 2021

    The date the builder gave at registration.

  4. Completion filed17 Feb 2022

    The builder told RERA the project is complete. Ask for the occupancy certificate before moving in.

No quarterly construction update is filed on this project's RERA page.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

What's being built?

3BHK
  • 1,250 sq ft26 homes116.1 m²
  • 1,147 sq ft20 homes106.6 m²
  • 1,146 sq ft8 homes106.5 m²
  • 1,144 sq ft6 homes106.3 m²
  • and 19 homes in other sizes
Typically 57 m² land share · 10 m² balcony/terrace · 1 parking space
79 homes · 49% of the project
2BHK
  • 959 sq ft9 homes89.1 m²
  • 962 sq ft9 homes89.4 m²
  • 882 sq ft8 homes81.9 m²
  • 876 sq ft4 homes81.4 m²
  • and 19 homes in other sizes
Typically 43 m² land share · 14 m² balcony/terrace · 1 parking space
49 homes · 31% of the project
4BHK
  • 1,665 sq ft9 homes154.7 m²
  • 1,679 sq ft7 homes156.0 m²
Typically 84 m² land share · 1 parking space
16 homes · 10% of the project
Studio
  • 207 sq ft4 homes19.2 m²
  • 222 sq ft4 homes20.6 m²
  • 245 sq ft4 homes22.8 m²
  • 259 sq ft3 homes24.1 m²
Typically 11 m² land share · 1 parking space
15 homes · 9% of the project
studio
  • 259 sq ft1 home24.1 m²
Typically 13 m² land share · 1 parking space
1 home · 1% of the project

Carpet areas from the builder's flat-by-flat list on RERA, each size as listed with how many homes have it. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Wing I10 floors
Wing J14 floors
Wing K11 floors
Wing L14 floors
Wing M10 floors

Wing I: 31 homes, 2 basements · Wing J: 47 homes, 2 basements · Wing K: 9 homes, 2 basements · Wing L: 41 homes, 2 basements · Wing M: 35 homes, 2 basements

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project62
Typical within 3 km (91)81
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project83%
Typical within 3 km (91)78%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
2.65 acres

10,732 m²

Ground covered by buildings
17% of the land

1,850 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 13 RERA projects of Rohan Builders on the map

The company

Registered as
Rohan Procon LLP
Type
Partnership Firm
PAN
AAPFR6653M

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land
₹29.0 cr
Construction
₹61.0 cr
Total project cost
₹90.0 cr

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station5.81 kmReliable
  • Nearest railway station2.37 kmReliable
  • Bus stops within 500 m0Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km3Caveat
  • Parks within 1 km15Caveat
  • Nearest lake / water body (≥2 ha)0.52 kmCaveat

Hospitals

  • Nearest hospital1.17 kmCaveat

Schools

  • Schools in pincode 560103 (UDISE+ census)22Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km7Caveat
  • Median pupil-teacher ratio, schools within 1 km28.6 :1Caveat
  • Schools with library + playground + ICT lab (1 km)3Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionBellanduru PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • Groundwater depth at nearest CGWB well4.5 m below groundCaveat
  • In an IISc groundwater-critical ward (2025 outlook)noCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)6.48 kmReliable
  • Nearest sewage treatment plant1.93 kmCaveat
  • Industrial zones within 1 km0Caveat
  • Nearest airfield runway (any, incl. military)3.07 kmCaveat
  • Nearest commercial-airport runway28.96 kmReliable
  • Distance to runway approach-path proxy28.39 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)1Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)6Caveat

ReliableFrom our location report at the builder-entered pin (12.92764, 77.69878), 2026-10-24. Each figure's source and caveat are in the full report.