Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

ROACH CICADA

by RBD SHELTERS LLP · 124 homes · 3.15 acres · 2 towers · Bengaluru East

Upcoming Under construction, due Aug 2030. 21% built with 19% of the time used. 6% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
21% built

Due 5 Aug 2030. 19% of the time from RERA approval to the deadline has passed.

Built21%
Time used19%
How much is sold?116 left
6% booked

8 of 124 homes, as the builder reported for Q2 2026-27.

How crowded is it?Less crowded
39 homes per acre

Similar projects within 3 km: 68 per acre. 80% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?2 due so far
0% on time

Of its 3 RERA projects in Bengaluru Urban: 0 delivered on time, 2 late (after the date first promised), 1 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started1 Oct 2025
  2. Approved by RERA5 Dec 2025
  3. Today24 Oct 2026

    19% of the time to the deadline has passed.

  4. If it slips like a typical project7 May 2031

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-261%
Q4 2025-264%
Q1 2026-2716%
Q2 2026-2721%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

Tower A & B10%
Tower C10%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

8 booked116 leftQ2 2026-27

Still available: 3 × 2.5 BHK, 55 × 3 BHK, 38 × 3.5 BHK, 20 × 4.5 BHK.

Booked, by type

2.5 BHK1 of 4
3 BHK3 of 58
3.5 BHK2 of 40
4.5 BHK2 of 22

Booked, each quarter

Q3 2025-260 of 124
Q4 2025-261 of 124
Q1 2026-274 of 124
Q2 2026-278 of 124

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3 BHK
1,246 sq ft
116 m² carpet · sizes 1,212–1,259 sq ft (19 at this size)
76 m² land share · 25 m² balcony/terrace · 1 parking space
58 homes · 47% of the project
3.5 BHK
1,331 sq ft
124 m² carpet · sizes 1,060–1,334 sq ft (19 at this size)
83 m² land share · 27 m² balcony/terrace · 1 parking space
40 homes · 32% of the project
4.5 BHK
1,685 sq ft
156 m² carpet · sizes 1,259–1,689 sq ft (11 at this size)
100 m² land share · 26 m² balcony/terrace · 1 parking space
22 homes · 18% of the project
2.5 BHK
1,060 sq ft
98 m² carpet · sizes 1,060–1,334 sq ft (1 at this size)
66 m² land share · 24 m² balcony/terrace · 1 parking space
4 homes · 3% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Tower A & B10 floors
Tower C10 floors

Tower A & B: 80 homes, 35 m tall, 2 basements · Tower C: 44 homes, 35 m tall

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project39
Typical within 3 km (113)68
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project80%
Typical within 3 km (113)64%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
3.15 acres

12,747 m²

Ground covered by buildings
20% of the land

2,580 m²

Floor-area ratio
2.25

Floors built per unit of land: 2.25 m² of floors for each m² of land.

Parking
2.33 per home

289 covered, 0 open

Built-up area, all floors
4,19,717 sq ft

38,993 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 3 RERA projects of RBD SHELTERS LLP on the map

The company

Registered as
RBD SHELTERS LLP
Type
Partnership Firm
Company number
AAB-6572

CIN or LLPIN, from the Registrar of Companies.

PAN
AAPFR9036C
GSTIN
29AAPFR9036C1ZU

Its other registrations on RERA Karnataka

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹77.0 crBuilding and development ₹123.0 crTotal ₹200.0 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹0.0 lakh₹0.0 lakh
Q4 2025-26₹5.0 lakh₹0.0 lakh
Q1 2026-27₹1.0 cr₹0.0 lakh
Q2 2026-27₹3.4 cr₹0.0 lakh

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station5.04 kmReliable
  • Nearest railway station2.29 kmReliable
  • Bus stops within 500 m4Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km1Caveat
  • Parks within 1 km2Caveat
  • Nearest lake / water body (≥2 ha)0.81 kmCaveat

Hospitals

  • Nearest hospital0.99 kmCaveat

Schools

  • Schools in pincode 560035 (UDISE+ census)45Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km7Caveat
  • Median pupil-teacher ratio, schools within 1 km27.5 :1Caveat
  • Schools with library + playground + ICT lab (1 km)5Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionBellanduru PSReliable

Air quality

  • PM2.5, recent 24 h avg (nearest CPCB station)18 µg/m³Caveat

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)4.04 kmReliable
  • Nearest sewage treatment plant0.69 kmCaveat
  • Industrial zones within 1 km1Caveat
  • Nearest airfield runway (any, incl. military)5.28 kmCaveat
  • Nearest commercial-airport runway31.62 kmReliable
  • Distance to runway approach-path proxy30.85 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)1Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)3Caveat

ReliableFrom our location report at the builder-entered pin (12.90366, 77.68506), 2026-10-24. Each figure's source and caveat are in the full report.