Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

RIVIERA GLADE

by Goyal Hariyana Infrastructures · 112 homes · 9.48 acres · 18 towers · Yelahanka

Upcoming Under construction, due Dec 2030. 25% built with 13% of the time used. 28% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
25% built

Due 31 Dec 2030. 13% of the time from RERA approval to the deadline has passed.

Built25%
Time used13%
How much is sold?81 left
28% booked

31 of 112 homes, as the builder reported for Q2 2026-27.

How crowded is it?Less crowded
12 homes per acre

Similar projects within 3 km: 27 per acre. 58% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?1 due so far
0% on time

Of its 2 RERA projects in Bengaluru Urban: 0 delivered on time, 1 late (after the date first promised), 1 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started1 Mar 2026
  2. Approved by RERA4 Mar 2026
  3. Today24 Oct 2026

    13% of the time to the deadline has passed.

  4. If it slips like a typical project2 Oct 2031

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q4 2025-2610%
Q1 2026-2717%
Q2 2026-2725%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

Block A15%
Block B15%
Block C15%
Block D15%
Block E10%
Block F10%
Block G10%
Block H10%
Block J10%
Block K10%
Block L5%
Block M5%
Block N5%
Block P5%
Block Q5%
Block R5%
Block S5%
Block T5%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

31 booked81 leftQ2 2026-27

Still available: 81 × 4 BHK.

Booked, by type

4 BHK31 of 112

Booked, each quarter

Q4 2025-269 of 112
Q1 2026-2725 of 112
Q2 2026-2731 of 112

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

4 BHK
  • 2,532 sq ft51 homes235.2 m²
  • 2,559 sq ft49 homes237.7 m²
  • 2,305 sq ft6 homes214.1 m²
  • 2,381 sq ft6 homes221.2 m²
Typically 260 m² land share · 30 m² balcony/terrace · 2 parking spaces
112 homes · 100% of the project

Carpet areas from the builder's flat-by-flat list on RERA, each size as listed with how many homes have it. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Block A2 floors
Block B2 floors
Block C2 floors
Block D1 floor
Block E1 floor
Block F2 floors
Block G2 floors
Block H2 floors
Block J2 floors
Block K2 floors
Block L2 floors
Block M2 floors
Block N2 floors
Block P2 floors
Block Q2 floors
Block R2 floors
Block S2 floors
Block T2 floors

Block A: 13 homes, 10 m tall · Block B: 6 homes, 10 m tall · Block C: 6 homes, 10 m tall · Block D: 6 homes, 7 m tall · Block E: 6 homes, 7 m tall · Block F: 6 homes, 10 m tall · Block G: 4 homes, 10 m tall · Block H: 4 homes, 10 m tall · Block J: 4 homes, 10 m tall · Block K: 4 homes, 10 m tall · Block L: 5 homes, 10 m tall · Block M: 5 homes, 10 m tall · Block N: 14 homes, 10 m tall · Block P: 6 homes, 10 m tall · Block Q: 7 homes, 10 m tall · Block R: 6 homes, 10 m tall · Block S: 6 homes, 10 m tall · Block T: 4 homes, 10 m tall

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project12
Typical within 3 km (10)27
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project58%
Typical within 3 km (10)76%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
9.48 acres

38,344 m²

Ground covered by buildings
42% of the land

16,095 m²

Floor-area ratio
0.71

Floors built per unit of land: 0.71 m² of floors for each m² of land.

Parking
2.21 per home

0 covered, 247 open

Built-up area, all floors
3,58,707 sq ft

33,325 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 2 RERA projects of GOYAL HARIYANA INFRASTRUCTURES on the map

The company

Registered as
Goyal Hariyana Infrastructures
Type
Partnership Firm
PAN
AAOFG9690C
GSTIN
29AAOFG9690C2ZT

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹16.4 crBuilding and development ₹218.8 crTotal ₹235.2 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q4 2025-26₹4.3 cr₹5.3 cr
Q1 2026-27₹8.6 cr₹7.7 cr
Q2 2026-27₹14.8 cr₹10.3 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station15.73 kmReliable
  • Nearest railway station4.61 kmReliable
  • Bus stops within 500 m0Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km1Caveat
  • Nearest lake / water body (≥2 ha)0.74 kmCaveat

Hospitals

  • Nearest hospital0.91 kmCaveat

Schools

  • Schools in pincode 562157 (UDISE+ census)56Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km3Caveat
  • Schools with library + playground + ICT lab (1 km)1Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionChikkajala PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km14Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)7.04 kmReliable
  • Nearest sewage treatment plant3.82 kmCaveat
  • Industrial zones within 1 km1Caveat
  • Nearest airfield runway (any, incl. military)2.35 kmCaveat
  • Nearest commercial-airport runway9.98 kmReliable
  • Distance to runway approach-path proxy2.53 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)1Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)0Caveat

ReliableFrom our location report at the builder-entered pin (13.15711, 77.60415), 2026-10-24. Each figure's source and caveat are in the full report.