Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

RAMKY LUMINA

by Royaume Estates Private Limited · 729 homes · 7.25 acres · 6 towers · Bengaluru South

Upcoming Under construction, due Dec 2028, after an extension. 51% built with 43% of the time used. 43% of homes booked.

Location report

At a glance

Is it on schedule?Deadline extended
51% built

Due 31 Dec 2028. 43% of the time from RERA approval to the deadline has passed.

Built51%
Time used43%
How much is sold?416 left
43% booked

313 of 729 homes, as the builder reported for Q2 2026-27.

How crowded is it?More crowded
101 homes per acre

Similar projects within 3 km: 75 per acre. 80% of the land is left open.

Any complaints?See the list
1 complaint

Complaints to RERA about this project. 11 more about the builder's other projects.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?Too early to tell
No deliveries yet

None of its 2 RERA projects in Bengaluru Urban has reached its deadline yet.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started28 Dec 2016
  2. First promised30 Sep 2023

    The date the builder gave at registration.

  3. Approved by RERA4 Mar 2025
  4. Today24 Oct 2026

    43% of the time to the deadline has passed.

  5. If it slips like a typical project2 Oct 2029

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2640%
Q4 2025-2644%
Q1 2026-2748%
Q2 2026-2751%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

Tower A90%
Tower B60%
Tower C80%
Tower D12%
Tower E15%
Tower F50%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

313 booked416 leftQ2 2026-27

Still available: 49 × 1BHK, 52 × 2BHK, 315 × 3BHK.

Booked, by type

1BHK34 of 83
2BHK106 of 158
3BHK173 of 488

Booked, each quarter

Q3 2025-26298 of 729
Q4 2025-26271 of 729
Q1 2026-27289 of 729
Q2 2026-27313 of 729

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3BHK
898 sq ft
83 m² carpet · sizes 890–1,030 sq ft (174 at this size)
36 m² land share · 8 m² balcony/terrace · 1 parking space
488 homes · 67% of the project
2BHK
688 sq ft
64 m² carpet · sizes 688–827 sq ft (141 at this size)
28 m² land share · 8 m² balcony/terrace · 1 parking space
158 homes · 22% of the project
1BHK
406 sq ft
38 m² carpet · sizes 391–668 sq ft (54 at this size)
17 m² land share · 5 m² balcony/terrace · 0 parking spaces
83 homes · 11% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Tower A14 floors
Tower B14 floors
Tower C14 floors
Tower D14 floors
Tower E14 floors
Tower F14 floors

Tower A: 138 homes, 1 basement · Tower B: 113 homes, 1 basement · Tower C: 118 homes, 1 basement · Tower D: 120 homes, 2 basements · Tower E: 120 homes, 2 basements · Tower F: 120 homes, 2 basements

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project101
Typical within 3 km (63)75
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project80%
Typical within 3 km (63)64%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
7.25 acres

29,339 m²

Ground covered by buildings
20% of the land

5,900 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 2 RERA projects of Royaume Estates Private Limited on the map

Complaints to RERA about its other projects

The company

Registered as
Royaume Estates Private Limited
Type
Company
Company number
U45400KA2014PTC074588

CIN or LLPIN, from the Registrar of Companies.

PAN
AAGCR9184B

The land is owned together with others (a joint development), including Royaume Estates Private Ltd R.

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land
₹65.0 cr
Construction
₹340.9 cr
Total project cost
₹405.9 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹11.0 cr₹0.0 lakh
Q4 2025-26₹4.0 lakh₹0.0 lakh
Q1 2026-27₹5.5 cr₹2.8 cr
Q2 2026-27₹23.1 cr₹0.0 lakh

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station0.91 kmReliable
  • Nearest railway station6.27 kmReliable
  • Bus stops within 500 m0Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km5Caveat
  • Nearest lake / water body (≥2 ha)0.57 kmCaveat

Hospitals

  • Nearest hospital0.39 kmCaveat

Schools

  • Schools in pincode 560100 (UDISE+ census)75Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km6Caveat
  • Median pupil-teacher ratio, schools within 1 km22 :1Caveat
  • Schools with library + playground + ICT lab (1 km)5Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionparappana AgraharaReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • Groundwater depth at nearest CGWB well1 m below groundCaveat
  • In an IISc groundwater-critical ward (2025 outlook)noCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)3.75 kmReliable
  • Nearest sewage treatment plant1.84 kmCaveat
  • Industrial zones within 1 km8Caveat
  • Nearest airfield runway (any, incl. military)9.2 kmCaveat
  • Nearest commercial-airport runway35.84 kmReliable
  • Distance to runway approach-path proxy34.71 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)1Caveat

ReliableFrom our location report at the builder-entered pin (12.86631, 77.66592), 2026-10-24. Each figure's source and caveat are in the full report.