Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

RAMKY FORTUNA

by Ithaca Estates Private Limited · 1,739 homes · 19.67 acres · 19 towers · Bengaluru East

Upcoming Under construction, due Dec 2030. 38% built with 21% of the time used. 48% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
38% built

Due 31 Dec 2030. 21% of the time from RERA approval to the deadline has passed.

Built38%
Time used21%
How much is sold?898 left
48% booked

841 of 1,739 homes, as the builder reported for Q2 2026-27.

How crowded is it?About the same
88 homes per acre

Similar projects within 3 km: 82 per acre. 85% of the land is left open.

Any complaints?See the list
1 complaint

Complaints to RERA about this project. 144 more about the builder's other projects.

Any legal cases?Litigation
Declared

The builder declares litigation on the land or the project.

What is the builder's record?Too early to tell
No deliveries yet

None of its 2 RERA projects in Bengaluru Urban has reached its deadline yet.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started25 Aug 2014
  2. Approved by RERA15 Sep 2025
  3. Today24 Oct 2026

    21% of the time to the deadline has passed.

  4. If it slips like a typical project2 Oct 2031

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2632%
Q4 2025-2634%
Q1 2026-2736%
Q2 2026-2738%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

Tower 166%
Tower 266%
Tower 386%
Tower 485%
Tower 579%
Tower 676%
Tower 755%
Tower 852%
Tower 948%
Tower 1043%
Tower 1145%
Tower 12 (Phase II)2%
Tower 13 (Phase II)2%
Tower 14 (Phase II)2%
Tower 15 (Phase II)2%
Tower 16 (Phase II)2%
Tower 17 (Phase II)2%
Tower 18 (Phase II)2%
Tower 19 (Phase II)2%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

841 booked898 leftQ2 2026-27

Still available: 481 × 2BHK, 208 × 3BHK, 116 × 1BHK, 88 × 2.5BHK, 4 × 4BHK, 1 × 3BHK + 4T.

Booked, by type

2BHK495 of 976
3BHK127 of 335
1BHK95 of 211
2.5BHK123 of 211
4BHK0 of 4
3BHK + 4T1 of 2

Booked, each quarter

Q3 2025-26998 of 1,739
Q4 2025-26708 of 1,739
Q1 2026-27735 of 1,739
Q2 2026-27841 of 1,739

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

2BHK
722 sq ft
67 m² carpet · sizes 688–722 sq ft (550 at this size)
30 m² land share · 7 m² balcony/terrace · 1 parking space
976 homes · 56% of the project
3BHK
1,071 sq ft
100 m² carpet · sizes 1,003–1,396 sq ft (158 at this size)
45 m² land share · 9 m² balcony/terrace · 1 parking space
335 homes · 19% of the project
1BHK
390 sq ft
36 m² carpet · sizes 367–390 sq ft (174 at this size)
17 m² land share · 6 m² balcony/terrace · 1 parking space
211 homes · 12% of the project
2.5BHK
814 sq ft
76 m² carpet
35 m² land share · 11 m² balcony/terrace · 1 parking space
211 homes · 12% of the project
4BHK
2,157 sq ft
200 m² carpet · sizes 1,695–2,157 sq ft (2 at this size)
82 m² land share · 13 m² balcony/terrace · 1 parking space
4 homes · 0% of the project
3BHK + 4T
1,343 sq ft
125 m² carpet
54 m² land share · 9 m² balcony/terrace · 1 parking space
2 homes · 0% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Tower 119 floors
Tower 219 floors
Tower 319 floors
Tower 419 floors
Tower 519 floors
Tower 619 floors
Tower 719 floors
Tower 819 floors
Tower 919 floors
Tower 1019 floors
Tower 1119 floors
Tower 12 (Phase II)14 floors
Tower 13 (Phase II)14 floors
Tower 14 (Phase II)14 floors
Tower 15 (Phase II)14 floors
Tower 16 (Phase II)14 floors
Tower 17 (Phase II)13 floors
Tower 18 (Phase II)13 floors
Tower 19 (Phase II)13 floors

Tower 1: 113 homes, 2 basements · Tower 2: 113 homes, 2 basements · Tower 3: 113 homes, 2 basements · Tower 4: 75 homes, 2 basements · Tower 5: 113 homes, 2 basements · Tower 6: 113 homes, 2 basements · Tower 7: 75 homes, 2 basements · Tower 8: 75 homes, 2 basements · Tower 9: 113 homes, 2 basements · Tower 10: 113 homes, 2 basements · Tower 11: 113 homes, 2 basements · Tower 12 (Phase II): 89 homes, 2 basements · Tower 13 (Phase II): 89 homes, 2 basements · Tower 14 (Phase II): 89 homes, 2 basements · Tower 15 (Phase II): 89 homes, 2 basements · Tower 16 (Phase II): 89 homes, 2 basements · Tower 17 (Phase II): 55 homes, 2 basements · Tower 18 (Phase II): 55 homes, 2 basements · Tower 19 (Phase II): 55 homes, 2 basements

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project88
Typical within 3 km (44)82
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project85%
Typical within 3 km (45)51%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
19.67 acres

79,621 m²

Ground covered by buildings
15% of the land

12,051 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 2 RERA projects of Ithaca Estates Private Limited on the map

Complaints to RERA about its other projects

The company

Registered as
Ithaca Estates Private Limited
Type
Company
Company number
U45205KA2013PTC067632

CIN or LLPIN, from the Registrar of Companies.

PAN
AADCI1447B

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land
₹12.7 cr
Construction
₹751.6 cr
Total project cost
₹764.3 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹0.0 lakh₹0.0 lakh
Q4 2025-26₹27.0 lakh₹0.0 lakh
Q1 2026-27₹1.7 cr₹1.8 cr
Q2 2026-27₹12.3 cr₹9.4 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station1.7 kmReliable
  • Nearest railway station1.7 kmReliable
  • Bus stops within 500 m3Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km5Caveat
  • Parks within 1 km3Caveat
  • Nearest lake / water body (≥2 ha)0.58 kmCaveat

Hospitals

  • Nearest hospital0.55 kmCaveat

Schools

  • Schools in pincode 560016 (UDISE+ census)83Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km16Caveat
  • Median pupil-teacher ratio, schools within 1 km27.2 :1Caveat
  • Schools with library + playground + ICT lab (1 km)11Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionK.R. Puram PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km7Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • In an IISc groundwater-critical ward (2025 outlook)yesCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)9.02 kmReliable
  • Nearest sewage treatment plant0.82 kmCaveat
  • Industrial zones within 1 km2Caveat
  • Nearest airfield runway (any, incl. military)7.04 kmCaveat
  • Nearest commercial-airport runway19.33 kmReliable
  • Distance to runway approach-path proxy18.56 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)2Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)3Caveat

ReliableFrom our location report at the builder-entered pin (13.01506, 77.68051), 2026-10-24. Each figure's source and caveat are in the full report.