Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

RAJA FOUR SQUARES

by RAJA HOUSING LTD · 39 homes · 0.49 acres · 1 tower · Bengaluru South

Delivered late Completed: the builder filed for completion on 1 Apr 2026, 1,156 days after the date it first promised.

Location report

At a glance

Was it on time?Delivered late
Completed late

The builder filed for completion on 1 Apr 2026, 1,156 days after the date it first promised.

How much is sold?Unknown
Not reported

The builder has not filed bookings on RERA.

How crowded is it?More crowded
80 homes per acre

Similar projects within 3 km: 52 per acre. 59% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project. 43 more about the builder's other projects.

Any legal cases?Unknown
Not stated

The RERA page doesn't say.

What is the builder's record?5 due so far
20% on time

Of its 7 RERA projects in Bengaluru Urban: 1 delivered on time, 2 late (after the date first promised), 2 past due with no completion filed, 2 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

Was it delivered on time?

  1. Work started18 Jan 2020
  2. Approved by RERA27 Aug 2020
  3. First promised31 Jan 2023

    The date the builder gave at registration.

  4. Completion filed1 Apr 2026

    The builder told RERA the project is complete. Ask for the occupancy certificate before moving in.

No quarterly construction update is filed on this project's RERA page.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

What's being built?

2BHK
705 sq ft
66 m² carpet · sizes 695–842 sq ft (4 at this size)
616 m² land share · 1 parking space
23 homes · 59% of the project
1BHK
425 sq ft
40 m² carpet · sizes 425–463 sq ft (4 at this size)
367 m² land share · 1 parking space
12 homes · 31% of the project
3BHK
947 sq ft
88 m² carpet
755 m² land share · 1 parking space
4 homes · 10% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Raja Four Squares4 floors

Raja Four Squares: 39 homes

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project80
Typical within 3 km (21)52
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project59%
Typical within 3 km (21)62%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
0.49 acres

1,978 m²

Ground covered by buildings
41% of the land

812 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 7 RERA projects of RAJA HOUSING LIMITED on the map

Complaints to RERA about its other projects

The company

Registered as
RAJA HOUSING LTD
Type
Company
PAN
AAACR9798M

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land
₹2.4 cr
Construction
₹10.5 cr
Total project cost
₹12.9 cr

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station2.97 kmReliable
  • Nearest railway station5.73 kmReliable
  • Bus stops within 500 m8Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km4Caveat
  • Parks within 1 km8Caveat
  • Nearest lake / water body (≥2 ha)2.07 kmCaveat

Hospitals

  • Nearest hospital0.45 kmCaveat

Schools

  • Schools in pincode 560030 (UDISE+ census)23Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km22Caveat
  • Median pupil-teacher ratio, schools within 1 km27.6 :1Caveat
  • Schools with library + playground + ICT lab (1 km)8Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionAdugodi PSReliable

Air quality

  • PM2.5, recent 24 h avg (nearest CPCB station)33 µg/m³Caveat

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km1Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • Groundwater depth at nearest CGWB well10 m below groundCaveat
  • In an IISc groundwater-critical ward (2025 outlook)noCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km1Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)6.69 kmReliable
  • Nearest sewage treatment plant1.47 kmCaveat
  • Industrial zones within 1 km4Caveat
  • Nearest airfield runway (any, incl. military)4.75 kmCaveat
  • Nearest commercial-airport runway28.55 kmReliable
  • Distance to runway approach-path proxy25.8 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)2Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)4Caveat

ReliableFrom our location report at the builder-entered pin (12.94337, 77.61066), 2026-10-24. Each figure's source and caveat are in the full report.