by SNN ABODE LLP · 64 homes · 5.31 acres · 13 towers · Bengaluru South

Delivered late Completed: the builder filed for completion on 6 Aug 2026, 6 days after the date it first promised.

Location report

At a glance

Was it on time?Delivered late
Completed late

The builder filed for completion on 6 Aug 2026, 6 days after the date it first promised.

How much is sold?25 left
61% booked

39 of 64 homes, as the builder reported for Q1 2026-27.

How crowded is it?Less crowded
12 homes per acre

Similar projects within 3 km: 75 per acre. 56% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?1 due so far
0% on time

Of its 2 RERA projects in Bengaluru Urban: 0 delivered on time, 1 late (after the date first promised), 1 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

Was it delivered on time?

  1. Work started1 Aug 2022
  2. Approved by RERA1 Oct 2022
  3. Completion filed6 Aug 2026

    The builder told RERA the project is complete. Ask for the occupancy certificate before moving in.

How much is built, each quarter

Q3 2025-2692%
Q4 2025-2698%
Q1 2026-27100%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q1 2026-27

Block 1100%
Block 2100%
Block 3100%
Block 4100%
Block 5100%
Block 6100%
Block 7100%
Block 8100%
Block 9100%
Block 10100%
Block 11100%
Block 12100%
Block 13100%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

39 booked25 leftQ1 2026-27

Still available: 25 × 4 BHK.

Booked, by type

4 BHK39 of 64

Booked, each quarter

Q3 2025-2639 of 64
Q4 2025-2639 of 64
Q1 2026-2739 of 64

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

4 BHK
2,800 sq ft
260 m² carpet
329 m² land share · 41 m² balcony/terrace · 1 parking space
64 homes · 100% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Block 12 floors
Block 22 floors
Block 32 floors
Block 42 floors
Block 52 floors
Block 62 floors
Block 72 floors
Block 82 floors
Block 92 floors
Block 102 floors
Block 112 floors
Block 122 floors
Block 132 floors

Block 1: 5 homes, 10 m tall · Block 2: 5 homes, 10 m tall · Block 3: 5 homes, 10 m tall · Block 4: 5 homes, 10 m tall · Block 5: 5 homes, 10 m tall · Block 6: 5 homes, 10 m tall · Block 7: 5 homes, 10 m tall · Block 8: 5 homes, 10 m tall · Block 9: 5 homes, 10 m tall · Block 10: 5 homes, 10 m tall · Block 11: 5 homes, 10 m tall · Block 12: 7 homes, 10 m tall · Block 13: 2 homes, 10 m tall

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project12
Typical within 3 km (56)75
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project56%
Typical within 3 km (57)53%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
5.31 acres

21,499 m²

Ground covered by buildings
44% of the land

9,363 m²

Floor-area ratio
1.25

Floors built per unit of land: 1.25 m² of floors for each m² of land.

Parking
1.47 per home

94 covered, 0 open

Built-up area, all floors
2,13,911 sq ft

19,873 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 2 RERA projects of SNN ABODE LLP on the map

The company

Registered as
SNN ABODE LLP
Type
Partnership Firm
Company number
AAA-2381

CIN or LLPIN, from the Registrar of Companies.

PAN
ABUFS9662B
GSTIN
29ABUFS9662B1ZG

Its other registrations on RERA Karnataka

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹58.8 crBuilding and development ₹112.0 crTotal ₹170.8 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹4.0 cr₹4.0 cr
Q4 2025-26₹4.8 cr₹4.1 cr
Q1 2026-27₹3.3 cr₹4.0 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station5.71 kmReliable
  • Nearest railway station12.73 kmReliable
  • Bus stops within 500 m0Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km7Caveat
  • Nearest lake / water body (≥2 ha)0.48 kmCaveat

Hospitals

  • Nearest hospital1 kmCaveat

Schools

  • Schools in pincode 560076 (UDISE+ census)85Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km8Caveat
  • Median pupil-teacher ratio, schools within 1 km21.1 :1Caveat
  • Schools with library + playground + ICT lab (1 km)7Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionHulimavu PSReliable

Air quality

  • PM2.5, recent 24 h avg (nearest CPCB station)26 µg/m³Caveat

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • Groundwater depth at nearest CGWB well10.8 m below groundCaveat
  • In an IISc groundwater-critical ward (2025 outlook)noCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km2Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)3.24 kmReliable
  • Nearest sewage treatment plant1.47 kmCaveat
  • Industrial zones within 1 km2Caveat
  • Nearest airfield runway (any, incl. military)12.11 kmCaveat
  • Nearest commercial-airport runway38.5 kmReliable
  • Distance to runway approach-path proxy35.87 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)1Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)1Caveat

ReliableFrom our location report at the builder-entered pin (12.85257, 77.60079), 2026-10-24. Each figure's source and caveat are in the full report.