Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

RAJ ETTERNIA E BLOCK (BUILDING 4)

by SNN Properties LLP · 150 homes · 1.84 acres · 1 tower · Anekal

Past due, no completion filed Past its deadline of 30 Apr 2026, and no completion is filed on RERA. Some finished projects never file, so ask the builder for the occupancy certificate.

Location report

At a glance

Is it on schedule?Past due
Past its deadline

The deadline was 30 Apr 2026, and no completion is filed.

How much is sold?1 left
99% booked

144 of 145 homes, as the builder reported for Q4 2025-26.

How crowded is it?More crowded
82 homes per acre

Similar projects within 3 km: 68 per acre. 83% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project. 1 more about the builder's other projects.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?2 due so far
0% on time

Of its 3 RERA projects in Bengaluru Urban: 0 delivered on time, 1 late (after the date first promised), 1 past due with no completion filed, 1 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Approved by RERA29 Apr 2022
  2. Work started1 May 2022
  3. Deadline30 Apr 2026

    Passed with no completion filed.

How much is built, each quarter

Q3 2025-2672%
Q4 2025-2679%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

144 booked1 leftQ4 2025-26

Still available: 1 × 2 BHK.

Booked, by type

1 BHK14 of 14
2 BHK33 of 34
2.5 BHK21 of 21
3 BHK57 of 57
4 BHK19 of 19

Booked, each quarter

Q3 2025-26144 of 145
Q4 2025-26144 of 145

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3 BHK
947 sq ft
88 m² carpet
40 m² land share · 28 m² balcony/terrace · 1 parking space
57 homes · 39% of the project
2 BHK
718 sq ft
67 m² carpet
31 m² land share · 22 m² balcony/terrace · 1 parking space
34 homes · 23% of the project
2.5 BHK
851 sq ft
79 m² carpet
36 m² land share · 26 m² balcony/terrace · 1 parking space
21 homes · 14% of the project
4 BHK
1,657 sq ft
154 m² carpet
70 m² land share · 50 m² balcony/terrace · 1 parking space
19 homes · 13% of the project
1 BHK
381 sq ft
35 m² carpet
17 m² land share · 12 m² balcony/terrace · 1 parking space
14 homes · 10% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Building 418 floors

Building 4: 145 homes, 1 basement

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project82
Typical within 3 km (94)68
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project83%
Typical within 3 km (94)62%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
1.84 acres

7,439 m²

Ground covered by buildings
17% of the land

1,243 m²

Floor-area ratio
2.25

Floors built per unit of land: 2.25 m² of floors for each m² of land.

Parking
1.07 per home

130 covered, 31 open

Built-up area, all floors
2,40,788 sq ft

22,370 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 3 RERA projects of SNN Properties LLP on the map

Complaints to RERA about its other projects

The company

Registered as
SNN Properties LLP
Type
Partnership Firm
PAN
ACCFS2149A
GSTIN
29ACCFS2149A1ZE
Website
www.snnrajcorp.com

Its other registrations on RERA Karnataka

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹17.9 crBuilding and development ₹97.5 crTotal ₹115.4 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹4.2 cr₹4.6 cr
Q4 2025-26₹376.8 cr₹406.5 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station2.58 kmReliable
  • Nearest railway station4.66 kmReliable
  • Bus stops within 500 m0Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km1Caveat
  • Parks within 1 km8Caveat
  • Nearest lake / water body (≥2 ha)0.55 kmCaveat

Hospitals

  • Nearest hospital1.51 kmCaveat

Schools

  • Schools in pincode 560102 (UDISE+ census)38Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km3Caveat
  • Schools with library + playground + ICT lab (1 km)3Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionparappana AgraharaReliable

Air quality

  • PM2.5, recent 24 h avg (nearest CPCB station)18 µg/m³Caveat

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km1Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • Groundwater depth at nearest CGWB well1 m below groundCaveat
  • In an IISc groundwater-critical ward (2025 outlook)noCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)2.02 kmReliable
  • Nearest sewage treatment plant0.83 kmCaveat
  • Industrial zones within 1 km0Caveat
  • Nearest airfield runway (any, incl. military)6.55 kmCaveat
  • Nearest commercial-airport runway33.18 kmReliable
  • Distance to runway approach-path proxy32.07 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)0Caveat

ReliableFrom our location report at the builder-entered pin (12.89040, 77.66653), 2026-10-24. Each figure's source and caveat are in the full report.