RAIN BOW OAKS

by RAINVAS INFRAA · 94 homes · 1.00 acres · 2 towers · Bengaluru South

Delivered late Completed: the builder filed for completion on 16 Apr 2022, 157 days after the date it first promised.

Location report

At a glance

Was it on time?Delivered late
Completed late

The builder filed for completion on 16 Apr 2022, 157 days after the date it first promised.

How much is sold?Unknown
Not reported

The builder has not filed bookings on RERA.

How crowded is it?More crowded
94 homes per acre

Similar projects within 3 km: 74 per acre. 50% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?Unknown
Not stated

The RERA page doesn't say.

What is the builder's record?2 due so far
0% on time

Of its 3 RERA projects in Bengaluru Urban: 0 delivered on time, 2 late (after the date first promised), 1 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

Was it delivered on time?

  1. Work started10 May 2019
  2. Approved by RERA6 Jul 2019
  3. First promised10 Nov 2021

    The date the builder gave at registration.

  4. Completion filed16 Apr 2022

    The builder told RERA the project is complete. Ask for the occupancy certificate before moving in.

No quarterly construction update is filed on this project's RERA page.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

What's being built?

2
622 sq ft
58 m² carpet · sizes 546–944 sq ft (21 at this size)
41 m² land share · 28 m² balcony/terrace · 1 parking space
50 homes · 53% of the project
3
686 sq ft
64 m² carpet · sizes 663–922 sq ft (33 at this size)
46 m² land share · 31 m² balcony/terrace · 1 parking space
44 homes · 47% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

A5 floors
B5 floors

A: 42 homes · B: 52 homes

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project94
Typical within 3 km (52)74
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project50%
Typical within 3 km (53)56%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
1.00 acres

4,046 m²

Ground covered by buildings
50% of the land

2,017 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 3 RERA projects of RAINVAS INFRAA on the map

The company

Registered as
RAINVAS INFRAA
Type
Partnership Firm
PAN
AAYFR4966J

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land
₹17.0 cr
Construction
₹21.1 cr
Total project cost
₹38.1 cr

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station2.74 kmReliable
  • Nearest railway station9.94 kmReliable
  • Bus stops within 500 m0Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km2Caveat
  • Nearest lake / water body (≥2 ha)0.91 kmCaveat

Hospitals

  • Nearest hospital1.28 kmCaveat

Schools

  • Schools in pincode 560068 (UDISE+ census)144Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionBegur PSReliable

Air quality

  • PM2.5, recent 24 h avg (nearest CPCB station)18 µg/m³Caveat

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • Groundwater depth at nearest CGWB well1 m below groundCaveat
  • In an IISc groundwater-critical ward (2025 outlook)noCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)3.44 kmReliable
  • Nearest sewage treatment plant2 kmCaveat
  • Industrial zones within 1 km0Caveat
  • Nearest airfield runway (any, incl. military)9.67 kmCaveat
  • Nearest commercial-airport runway36.45 kmReliable
  • Distance to runway approach-path proxy34.33 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)0Caveat

ReliableFrom our location report at the builder-entered pin (12.86631, 77.62433), 2026-10-24. Each figure's source and caveat are in the full report.