Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

RAGAM MEADOWS

by M R VENTURES · 140 homes · 2.10 acres · 2 towers · Bengaluru South

Upcoming Under construction, due Aug 2027. 40% built with 61% of the time used. 33% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
40% built

Due 31 Aug 2027. 61% of the time from RERA approval to the deadline has passed.

Built40%
Time used61%
How much is sold?94 left
33% booked

46 of 140 homes, as the builder reported for Q2 2026-27.

How crowded is it?Less crowded
67 homes per acre

Similar projects within 3 km: 78 per acre. 50% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?No other record
Only this project

It is the only RERA project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started3 Apr 2025
  2. Approved by RERA25 Jun 2025
  3. Today24 Oct 2026

    61% of the time to the deadline has passed.

  4. If it slips like a typical project1 Jun 2028

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-269%
Q4 2025-2616%
Q1 2026-2722%
Q2 2026-2740%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

A41%
B45%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

46 booked94 leftQ2 2026-27

Still available: 11 × 2 BHK, 83 × 3 BHK.

Booked, by type

2 BHK13 of 24
3 BHK33 of 116

Booked, each quarter

Q3 2025-268 of 140
Q4 2025-2615 of 140
Q1 2026-2723 of 140
Q2 2026-2746 of 140

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3 BHK
  • 916 sq ft36 homes85.1 m²
  • 917 sq ft12 homes85.2 m²
  • 920 sq ft12 homes85.5 m²
  • 933 sq ft12 homes86.7 m²
  • and 44 homes in other sizes
Typically 62 m² land share · 19 m² balcony/terrace · 1 parking space
116 homes · 83% of the project
2 BHK
  • 727 sq ft12 homes67.5 m²
  • 739 sq ft12 homes68.7 m²
Typically 50 m² land share · 16 m² balcony/terrace · 1 parking space
24 homes · 17% of the project

Carpet areas from the builder's flat-by-flat list on RERA, each size as listed with how many homes have it. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

A5 floors
B5 floors

A: 100 homes, 15 m tall · B: 40 homes, 15 m tall

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project67
Typical within 3 km (38)78
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project50%
Typical within 3 km (38)55%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
2.10 acres

8,498 m²

Ground covered by buildings
50% of the land

4,248 m²

Floor-area ratio
14,863.00

Floors built per unit of land: 14,863.00 m² of floors for each m² of land.

Parking
1.15 per home

161 covered, 0 open

Built-up area, all floors
2,09,939 sq ft

19,504 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

This is the only project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

The company

Registered as
M R VENTURES
Type
Partnership Firm
PAN
ABYFM3085G
GSTIN
29ABYFM3085G1ZJ

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹12.3 crBuilding and development ₹65.1 crTotal ₹78.6 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹80.3 lakh₹80.3 lakh
Q4 2025-26₹1.7 cr₹1.2 cr
Q1 2026-27₹5.3 cr₹5.3 cr
Q2 2026-27₹8.6 cr₹8.6 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station2.96 kmReliable
  • Nearest railway station9.6 kmReliable
  • Bus stops within 500 m0Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km0Caveat
  • Nearest lake / water body (≥2 ha)0.13 kmCaveat

Hospitals

  • Nearest hospital1.4 kmCaveat

Schools

  • Schools in pincode 560068 (UDISE+ census)144Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionElectronic City PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • Groundwater depth at nearest CGWB well1 m below groundCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km2Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)2.02 kmReliable
  • Nearest sewage treatment plant1.93 kmCaveat
  • Industrial zones within 1 km0Caveat
  • Nearest airfield runway (any, incl. military)10.88 kmCaveat
  • Nearest commercial-airport runway37.76 kmReliable
  • Distance to runway approach-path proxy35.85 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)0Caveat

ReliableFrom our location report at the builder-entered pin (12.85279, 77.63222), 2026-10-24. Each figure's source and caveat are in the full report.