Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

Pursuit of a Radical Rhapsody Tower 5

by Total Environment Habitat Pvt. Ltd. · 130 homes · 3.59 acres · 1 tower · Bengaluru East

Upcoming Under construction, due Dec 2029. 28% built with 55% of the time used. 83% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
28% built

Due 1 Dec 2029. 55% of the time from RERA approval to the deadline has passed.

Built28%
Time used55%
How much is sold?22 left
83% booked

108 of 130 homes, as the builder reported for Q2 2026-27.

How crowded is it?Less crowded
36 homes per acre

Similar projects within 3 km: 82 per acre. 52% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project. 26 more about the builder's other projects.

Any legal cases?Litigation
Declared

The builder declares litigation on the land or the project.

What is the builder's record?9 due so far
11% on time

Of its 22 RERA projects in Bengaluru Urban: 1 delivered on time, 5 late (after the date first promised), 3 past due with no completion filed, 13 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started1 Dec 2022
  2. Approved by RERA28 Dec 2022
  3. Today24 Oct 2026

    55% of the time to the deadline has passed.

  4. If it slips like a typical project2 Sep 2030

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2660%
Q4 2025-2634%
Q1 2026-2728%
Q2 2026-2728%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

108 booked22 leftQ2 2026-27

Still available: 17 × 3 BHK, 5 × 4 BHK.

Booked, by type

2 BHK6 of 6
3 BHK95 of 112
4 BHK5 of 10
5 BHK2 of 2

Booked, each quarter

Q3 2025-26113 of 130
Q1 2026-27115 of 130
Q2 2026-27108 of 130

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3 BHK
1,653 sq ft
154 m² carpet · sizes 1,649–2,424 sq ft (30 at this size)
30 m² land share · 25 m² balcony/terrace · 2 parking spaces
112 homes · 86% of the project
4 BHK
2,959 sq ft
275 m² carpet
61 m² land share · 122 m² balcony/terrace · 2 parking spaces
10 homes · 8% of the project
2 BHK
846 sq ft
79 m² carpet
15 m² land share · 18 m² balcony/terrace · 1 parking space
6 homes · 5% of the project
5 BHK
5,336 sq ft
496 m² carpet · sizes 5,336–5,428 sq ft (1 at this size)
106 m² land share · 211 m² balcony/terrace · 2 parking spaces
2 homes · 2% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Tower 0530 floors

Tower 05: 130 homes, 94 m tall, 2 basements

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project36
Typical within 3 km (71)82
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project52%
Typical within 3 km (72)53%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
3.59 acres

14,530 m²

Ground covered by buildings
48% of the land

6,994 m²

Floor-area ratio
2.79

Floors built per unit of land: 2.79 m² of floors for each m² of land.

Parking
1.91 per home

248 covered, 0 open

Built-up area, all floors
3,90,525 sq ft

36,281 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 22 RERA projects of Total Environment on the map

Complaints to RERA about its other projects

The company

Registered as
Total Environment Habitat Pvt. Ltd.
Type
Company
Company number
U45201KA2010PTC054651

CIN or LLPIN, from the Registrar of Companies.

PAN
AADCT5683N
GSTIN
29AADCT5683N1ZI

Its other registrations on RERA Karnataka

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹43.8 crBuilding and development ₹416.1 crTotal ₹459.9 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹8.8 cr₹8.8 cr
Q4 2025-26₹10.4 cr₹10.2 cr
Q1 2026-27₹5.3 cr₹5.3 cr
Q2 2026-27₹4.8 cr₹4.8 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station0.99 kmReliable
  • Nearest railway station4.52 kmReliable
  • Bus stops within 500 m2Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km1Caveat
  • Parks within 1 km11Caveat
  • Nearest lake / water body (≥2 ha)0.35 kmCaveat

Hospitals

  • Nearest hospital0.9 kmCaveat

Schools

  • Schools in pincode 560048 (UDISE+ census)39Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km9Caveat
  • Median pupil-teacher ratio, schools within 1 km30 :1Caveat
  • Schools with library + playground + ICT lab (1 km)6Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionMahadevapura PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km2Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • In an IISc groundwater-critical ward (2025 outlook)yesCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)10.32 kmReliable
  • Nearest sewage treatment plant1.02 kmCaveat
  • Industrial zones within 1 km7Caveat
  • Nearest airfield runway (any, incl. military)5.69 kmCaveat
  • Nearest commercial-airport runway22.16 kmReliable
  • Distance to runway approach-path proxy21.56 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)1Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)2Caveat

ReliableFrom our location report at the builder-entered pin (12.98892, 77.72042), 2026-10-24. Each figure's source and caveat are in the full report.