Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

Provident Equinox 5

by Provident Housing Limited · 396 homes · 4.45 acres · 6 towers · Bengaluru South

Upcoming Under construction, due Mar 2030. 4% built with 18% of the time used. 25% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
4% built

Due 31 Mar 2030. 18% of the time from RERA approval to the deadline has passed.

Built4%
Time used18%
How much is sold?298 left
25% booked

98 of 396 homes, as the builder reported for Q2 2026-27.

How crowded is it?More crowded
89 homes per acre

Similar projects within 3 km: 79 per acre. 87% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project. 32 more about the builder's other projects.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?10 due so far
10% on time

Of its 20 RERA projects in Bengaluru Urban: 1 delivered on time, 3 late (after the date first promised), 6 past due with no completion filed, 10 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Approved by RERA17 Jan 2026
  2. Work started2 Mar 2026
  3. Today24 Oct 2026

    18% of the time to the deadline has passed.

  4. If it slips like a typical project31 Dec 2030

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q4 2025-261%
Q1 2026-271%
Q2 2026-274%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

Wing A4%
Wing B4%
Wing C4%
Wing D4%
Wing E4%
Wing F4%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

98 booked298 leftQ2 2026-27

Still available: 251 × 3 BHK, 47 × 2 BHK.

Booked, by type

3 BHK97 of 348
2 BHK1 of 48

Booked, each quarter

Q4 2025-2699 of 396
Q1 2026-27268 of 396
Q2 2026-2798 of 396

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3 BHK
778 sq ft
72 m² carpet · sizes 778–1,579 sq ft (168 at this size)
59 m² land share · 29 m² balcony/terrace · 1 parking space
348 homes · 88% of the project
2 BHK
629 sq ft
58 m² carpet
29 m² land share · 14 m² balcony/terrace · 1 parking space
48 homes · 12% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Wing A12 floors
Wing B12 floors
Wing C12 floors
Wing D12 floors
Wing E12 floors
Wing F12 floors

Wing A: 48 homes, 40 m tall · Wing B: 60 homes, 40 m tall, 1 basement · Wing C: 84 homes, 40 m tall, 1 basement · Wing D: 48 homes, 40 m tall · Wing E: 84 homes, 40 m tall, 1 basement · Wing F: 72 homes, 40 m tall, 1 basement

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project89
Typical within 3 km (38)79
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project87%
Typical within 3 km (40)57%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
4.45 acres

18,008 m²

Ground covered by buildings
13% of the land

2,393 m²

Floor-area ratio
2.24

Floors built per unit of land: 2.24 m² of floors for each m² of land.

Parking
1.38 per home

260 covered, 286 open

Built-up area, all floors
6,29,914 sq ft

58,521 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 20 RERA projects of Provident Housing on the map

Complaints to RERA about its other projects

32 complaints across 6 projects. The most complained about:

Show all 6 projects
  • Provident Equinox 4 1 complaint

The company

Registered as
Provident Housing Limited
Type
Company
Company number
U45200KA2008PLC048273

CIN or LLPIN, from the Registrar of Companies.

PAN
AAECP8877D
GSTIN
29AAECP8877D1ZW

Its other registrations on RERA Karnataka

8 registrations under this company
  • Provident Equinox 6 PRM/KA/RERA/1251/310/PR/180926/008948 · approved 18 Sep 2026
  • Provident Equinox 4 PRM/KA/RERA/1251/310/PR/210325/007612 · approved 21 Mar 2025
  • Provident Equinox 3 PRM/KA/RERA/1251/310/PR/180724/006944 · approved 18 Jul 2024
  • Provident Botanico PRM/KA/RERA/1250/304/PR/210324/006726 · approved 21 Mar 2024
  • Provident Capella 2 PRM/KA/RERA/1250/304/PR/190719/002702 · approved 19 Jul 2019
  • Provident Capella 1 PRM/KA/RERA/1250/304/PR/190606/002596 · approved 6 Jun 2019
  • Provident Neora PRM/KA/RERA/1251/472/PR/180808/001982 · approved 8 Aug 2018
  • Provident Skyworth Phase 1 PRM/KA/RERA/1257/334/PR/170916/000355 · approved 16 Sep 2017

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹63.0 crBuilding and development ₹257.7 crTotal ₹338.0 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q4 2025-26₹3.6 cr₹2.3 cr
Q1 2026-27₹17.7 cr₹11.7 cr
Q2 2026-27₹26.9 cr₹24.3 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station1.68 kmReliable
  • Nearest railway station3.89 kmReliable
  • Bus stops within 500 m2Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km1Caveat
  • Parks within 1 km24Caveat
  • Nearest lake / water body (≥2 ha)0.74 kmCaveat

Hospitals

  • Nearest hospital1.43 kmCaveat

Schools

  • Schools in pincode 560060 (UDISE+ census)105Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km2Caveat
  • Schools with library + playground + ICT lab (1 km)0Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionKumbalagudu PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km2Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)14.57 kmReliable
  • Nearest sewage treatment plant1.44 kmCaveat
  • Industrial zones within 1 km0Caveat
  • Nearest airfield runway (any, incl. military)21.15 kmCaveat
  • Nearest commercial-airport runway41.26 kmReliable
  • Distance to runway approach-path proxy35.92 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)0Caveat

ReliableFrom our location report at the builder-entered pin (12.88500, 77.47028), 2026-10-24. Each figure's source and caveat are in the full report.