RERA project · Residential/Group Housing
Primus Sangama
by Ameliorate Realtors Private Limited · 306 homes · 2.69 acres · 1 tower · Bengaluru South
Upcoming Under construction, due Feb 2030. 32% built with 33% of the time used. 80% of homes booked.
At a glance
Due 18 Feb 2030. 33% of the time from RERA approval to the deadline has passed.
246 of 306 homes, as the builder reported for Q2 2026-27.
Similar projects within 3 km: 72 per acre. 70% of the land is left open.
Complaints to RERA about this project.
No litigation on the land or the project, as the builder declares it to RERA.
None of its 2 RERA projects in Bengaluru Urban has reached its deadline yet.
These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.
When will it be ready?
- Approved by RERA17 Mar 2025
- Work started2 Apr 2025
- Today24 Oct 2026
33% of the time to the deadline has passed.
- Deadline18 Feb 2030
The date it must be complete by.
- If it slips like a typical project20 Nov 2030
35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.
How much is built, each quarter
Built, as the builder reports itTime used by then
When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.
CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.
How much is sold?
Still available: 11 × 1 BHK, 34 × 2 BHK, 15 × 3 BHK.
Booked, by type
Booked, each quarter
Booked means sold or reserved, as the builder reports it. It says nothing about prices.
CaveatFrom the builder's quarterly updates to RERA Karnataka.
What's being built?
Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.
Towers
Primus Sangama: 306 homes, 60 m tall, 1 basement
Amenities
- Electricity 2,582 m²
- CCTV Surveillance 2,412 m²
- Club House 2,092 m²
- Community Hall 275 m²
- Outdoor Sports facility 650 m²
- Indoor Sports facility 140 m²
- Swimming Pool 300 m²
- Gym 75 m²
- Parks 2,300 m²
- Power Backup 2,582 m²
- Water and Sanitation 170 m²
CaveatAs registered by the builder on RERA Karnataka.
How crowded is it?
Homes per acre
Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.
Land left open
The share of the land not built on, which includes roads.
- Land
- 2.69 acres
- Ground covered by buildings
- 30% of the land
- Floor-area ratio
- 3.24
- Parking
- 1.26 per home
- Built-up area, all floors
- 4,96,668 sq ft
10,901 m²
3,240 m²
Floors built per unit of land: 3.24 m² of floors for each m² of land.
316 covered, 71 open
46,142 m²
CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.
Who is building it?
All 2 RERA projects of Ameliorate Realtors Private Limited on the map
The company
- Registered as
- Ameliorate Realtors Private Limited
- Type
- Company
- Company number
- U70100KA2019PTC122769
- PAN
- AASCA0941K
- GSTIN
- 29AASCA0941K1Z9
- Website
- www.primuslife.in
CIN or LLPIN, from the Registrar of Companies.
Its other registrations on RERA Karnataka
- Primus Darpan PRM/KA/RERA/1251/310/PR/111124/007217 · approved 11 Nov 2024
- HARA NORTH ONE PRM/KA/RERA/1250/303/PR/090623/005985 · approved 9 Jun 2023
The land is owned together with others (a joint development).
CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.
Paperwork and legal
- Registered with RERAPRM/KA/RERA/1251/310/PR/170325/007588 · Approved
- Building plan approvedBDA - Bangalore Development Authority · Bem Apraa/NaMa/ Asa/ Aa-3/Thasa-2/Da/17/2024-25 · 10 Jan 2025
- Litigation on the landNone declared
- Litigation on the projectNone declared in the Q2 2026-27 update
- Water sourceLocal Authority
Complaints to RERA about this project
None on RERA Karnataka.
Documents
116 files on the RERA page: Approved plan ↗, Commencement certificate ↗, Brochure ↗.
CaveatAs filed on RERA Karnataka. Complaints are listed without the names of the people who filed them.
Project cost
Money from buyers, each quarter
| Quarter | Collected from buyers | Withdrawn from the project account |
|---|---|---|
| Q3 2025-26 | ₹13.1 cr | ₹9.8 cr |
| Q4 2025-26 | ₹27.1 cr | ₹15.1 cr |
| Q1 2026-27 | ₹28.4 cr | ₹20.4 cr |
| Q2 2026-27 | ₹42.0 cr | ₹13.1 cr |
Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.
CaveatCost as certified by the builder's chartered accountant at registration.
What's around it?
Open the full location report on the map
Metro, rail, bus, airport
- Nearest operational metro station3.91 kmReliable
- Nearest railway station3.23 kmReliable
- Bus stops within 500 m4Caveat
Parks, shops, daily needs
- Supermarkets within 1 km0Caveat
- Parks within 1 km3Caveat
- Nearest lake / water body (≥2 ha)0.42 kmCaveat
Hospitals
- Nearest hospital0.97 kmCaveat
Schools
- Schools in pincode 560074 (UDISE+ census)70Caveat
- Median pupil-teacher ratio, schools within 1 km22.6 :1Caveat
Police and crime
- Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
- Police station jurisdictionKumbalagudu PSReliable
Flood and waterlogging
- BBMP-listed flood / low-lying spots within 1 km0Caveat
Water availability
- Groundwater stage (CGWB block assessment)Over ExploitedCaveat
Power reliability
- Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
- Un/partially-electrified layouts within 1 km0Caveat
Landfills, sewage plants, industry, aircraft
- Nearest named landfill / dump site (≥2 ha)17.13 kmReliable
- Nearest sewage treatment plant2.56 kmCaveat
- Industrial zones within 1 km2Caveat
- Nearest airfield runway (any, incl. military)24.94 kmCaveat
- Nearest commercial-airport runway44.65 kmReliable
- Distance to runway approach-path proxy39.01 kmCaveat
Upcoming infrastructure
- Under-construction projects within 3 km (verified)0Reliable
- Earlier-stage projects within 3 km (sanctioned/tendered/observed)0Caveat
ReliableFrom our location report at the builder-entered pin (12.86970, 77.43878), 2026-10-24. Each figure's source and caveat are in the full report.