Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

PRIDE EUPHORA

by Pride Housing · 212 homes · 2.40 acres · 3 towers · Bengaluru East

Upcoming Under construction, due Sep 2027. 65% built with 70% of the time used. 75% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
65% built

Due 30 Sep 2027. 70% of the time from RERA approval to the deadline has passed.

Built65%
Time used70%
How much is sold?52 left
75% booked

160 of 212 homes, as the builder reported for Q2 2026-27.

How crowded is it?More crowded
88 homes per acre

Similar projects within 3 km: 80 per acre. 80% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?2 due so far
50% on time

Of its 3 RERA projects in Bengaluru Urban: 1 delivered on time, 1 late (after the date first promised), 1 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started2 May 2024
  2. Approved by RERA8 Aug 2024
  3. Today24 Oct 2026

    70% of the time to the deadline has passed.

  4. If it slips like a typical project1 Jul 2028

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2645%
Q4 2025-2653%
Q1 2026-2758%
Q2 2026-2765%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

Tower A42%
Tower B56%
Tower C60%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

160 booked52 leftQ2 2026-27

Still available: 17 × 3 BHK, 4 × 4 BHK (Pent House), 31 × 4 BHK.

Booked, by type

2 BHK18 of 18
3 BHK137 of 154
4 BHK (Pent House)0 of 4
4 BHK5 of 36

Booked, each quarter

Q3 2025-26140 of 212
Q4 2025-26150 of 212
Q1 2026-27154 of 212
Q2 2026-27160 of 212

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3 BHK
930 sq ft
86 m² carpet · sizes 930–1,175 sq ft (18 at this size)
43 m² land share · 13 m² balcony/terrace · 1 parking space
154 homes · 73% of the project
4 BHK
1,805 sq ft
168 m² carpet
71 m² land share · 22 m² balcony/terrace · 3 parking spaces
36 homes · 17% of the project
2 BHK
719 sq ft
67 m² carpet
28 m² land share · 6 m² balcony/terrace · 1 parking space
18 homes · 8% of the project
4 BHK (Pent House)
1,858 sq ft
173 m² carpet · sizes 1,858–1,908 sq ft (1 at this size)
78 m² land share · 20 m² balcony/terrace · 3 parking spaces
4 homes · 2% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Tower A18 floors
Tower B18 floors
Tower C18 floors

Tower A: 72 homes, 59 m tall, 2 basements · Tower B: 70 homes, 59 m tall, 2 basements · Tower C: 70 homes, 59 m tall, 2 basements

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project88
Typical within 3 km (69)80
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project80%
Typical within 3 km (69)53%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
2.40 acres

9,696 m²

Ground covered by buildings
20% of the land

1,909 m²

Floor-area ratio
3.25

Floors built per unit of land: 3.25 m² of floors for each m² of land.

Parking
1.48 per home

299 covered, 14 open

Built-up area, all floors
5,20,456 sq ft

48,352 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 3 RERA projects of Pride Housing on the map

The company

Registered as
Pride Housing
Type
Partnership Firm
PAN
AAGFP3222K
GSTIN
29AAGFP3222K1Z4
Website
www.pridegroup.net

Its other registrations on RERA Karnataka

The land is owned together with others (a joint development), including M/s. Pride and Expert Properties Private Limited.

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹59.3 crBuilding and development ₹128.7 crTotal ₹188.0 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹25.9 cr₹25.8 cr
Q4 2025-26₹34.9 cr₹29.8 cr
Q1 2026-27₹19.4 cr₹21.3 cr
Q2 2026-27₹30.3 cr₹26.2 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station3.17 kmReliable
  • Nearest railway station4.55 kmReliable
  • Bus stops within 500 m2Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km1Caveat
  • Parks within 1 km4Caveat
  • Nearest lake / water body (≥2 ha)0.42 kmCaveat

Hospitals

  • Nearest hospital0.12 kmCaveat

Schools

  • Schools in pincode 560049 (UDISE+ census)110Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km7Caveat
  • Median pupil-teacher ratio, schools within 1 km18.2 :1Caveat
  • Schools with library + playground + ICT lab (1 km)6Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionK.R. Puram PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km2Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • In an IISc groundwater-critical ward (2025 outlook)noCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km3Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)7 kmReliable
  • Nearest sewage treatment plant0.54 kmCaveat
  • Industrial zones within 1 km9Caveat
  • Nearest airfield runway (any, incl. military)8.24 kmCaveat
  • Nearest commercial-airport runway18.62 kmReliable
  • Distance to runway approach-path proxy18.17 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)0Caveat

ReliableFrom our location report at the builder-entered pin (13.02104, 77.71181), 2026-10-24. Each figure's source and caveat are in the full report.