RERA project · Residential/Group Housing
Prestige Southern Star
by PRESTIGE ACRES PRIVATE LIMITED · 2,130 homes · 29.62 acres · 14 towers · Bengaluru South
Upcoming Under construction, due Sep 2029. 24% built with 35% of the time used. 94% of homes booked.
At a glance
Due 30 Sep 2029. 35% of the time from RERA approval to the deadline has passed.
2,003 of 2,130 homes, as the builder reported for Q2 2026-27.
Similar projects within 3 km: 78 per acre. 54% of the land is left open.
Complaints to RERA about this project.
No litigation on the land or the project, as the builder declares it to RERA.
Of its 73 RERA projects in Bengaluru Urban: 14 delivered on time, 34 late (after the date first promised), 7 past due with no completion filed, 17 under way.
These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.
When will it be ready?
- Approved by RERA21 Mar 2025
- Work started1 Apr 2025
- Today24 Oct 2026
35% of the time to the deadline has passed.
- Deadline30 Sep 2029
The date it must be complete by.
- If it slips like a typical project2 Jul 2030
35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.
How much is built, each quarter
Built, as the builder reports itTime used by then
When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.
By tower, Q2 2026-27
CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.
How much is sold?
Still available: 25 × 3B 3T, 64 × 3B 3T M/HO, 1 × 3B 4T HO, 26 × 4B 4T HO, 11 × 4B 4T M/HO.
Booked, by type
Booked, each quarter
Booked means sold or reserved, as the builder reports it. It says nothing about prices.
CaveatFrom the builder's quarterly updates to RERA Karnataka.
What's being built?
- 1,178 sq ft149 homes109.4 m²
- 1,180 sq ft130 homes109.6 m²
- 1,143 sq ft73 homes106.2 m²
- 1,142 sq ft57 homes106.1 m²
- and 108 homes in other sizes
- 924 sq ft188 homes85.8 m²
- 946 sq ft108 homes87.9 m²
- 944 sq ft81 homes87.7 m²
- 929 sq ft54 homes86.3 m²
- and 81 homes in other sizes
- 1,339 sq ft186 homes124.4 m²
- 1,312 sq ft132 homes121.9 m²
- 1,308 sq ft52 homes121.5 m²
- 703 sq ft293 homes65.3 m²
- 780 sq ft27 homes72.5 m²
- 971 sq ft2 homes90.2 m²
- 797 sq ft1 home74.0 m²
- 437 sq ft204 homes40.6 m²
- 1,651 sq ft52 homes153.4 m²
- 1,620 sq ft26 homes150.5 m²
- 1,650 sq ft24 homes153.3 m²
- 1,672 sq ft76 homes155.3 m²
- 1,639 sq ft23 homes152.3 m²
- 1,531 sq ft2 homes142.2 m²
- 1,498 sq ft1 home139.2 m²
Carpet areas from the builder's flat-by-flat list on RERA, each size as listed with how many homes have it. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.
Towers
Block 2 - Tower 1: 128 homes, 84 m tall, 2 basements · Block 2 - Tower 2: 102 homes, 87 m tall, 1 basement · Block 1 - Tower 3: 133 homes, 87 m tall, 2 basements · Block 1 - Tower 4: 212 homes, 87 m tall, 2 basements · Block 1 - Tower 5: 212 homes, 87 m tall, 2 basements · Block 1 - Tower 6: 160 homes, 87 m tall, 2 basements · Block 1 - Tower 7: 133 homes, 87 m tall, 2 basements · Block 1 - Tower 8: 212 homes, 87 m tall, 2 basements · Block 1 - Tower 9: 214 homes, 87 m tall, 2 basements · Block 1 - Tower 10: 133 homes, 90 m tall, 2 basements · Block 1 - Tower 11: 133 homes, 90 m tall, 2 basements · Block 2 - Tower 12: 102 homes, 90 m tall, 2 basements · Block 2 - Tower 13: 128 homes, 87 m tall, 2 basements · Block 2 - Tower 14: 128 homes, 87 m tall, 2 basements
Amenities
- Electricity 1,953 m²
- CCTV Surveillance 20 m²
- Club House 6,514 m²
- Community Hall 628 m²
- Outdoor Sports facility 3,550 m²
- Indoor Sports facility 739 m²
- Swimming Pool 420 m²
- Gym 409 m²
- Parks 13,152 m²
- Power Backup 820 m²
- Water and Sanitation 100 m²
CaveatAs registered by the builder on RERA Karnataka.
How crowded is it?
Homes per acre
Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.
Land left open
The share of the land not built on, which includes roads.
- Land
- 29.62 acres
- Ground covered by buildings
- 46% of the land
- Floor-area ratio
- 2.49
- Parking
- 1.66 per home
- Built-up area, all floors
- 54,42,884 sq ft
1,19,852 m²
54,536 m²
Floors built per unit of land: 2.49 m² of floors for each m² of land.
3,386 covered, 158 open
5,05,661 m²
CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.
Who is building it?
All 73 RERA projects of Prestige Group on the map
The company
- Registered as
- PRESTIGE ACRES PRIVATE LIMITED
- Type
- Company
- Company number
- U45400KA2021PTC153545
- PAN
- AAMCP4135C
- GSTIN
- 29AAMCP4135C1ZF
- Website
- 9900105900
CIN or LLPIN, from the Registrar of Companies.
Its other registrations on RERA Karnataka
- Prestige King's County PRM/KA/RERA/1251/308/PR/290624/006936 · approved 29 Jun 2024
The land is owned together with others (a joint development).
CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.
Paperwork and legal
- Registered with RERAPRM/KA/RERA/1251/310/PR/210325/007603 · Approved
- Building plan approvedBBMP - Bruhat Bengaluru Mahanagara Palike · BBMP/CC/14100/24-25 · 30 Jan 2025
- Litigation on the landNone declared
- Litigation on the projectNone declared in the Q2 2026-27 update
- Water sourceBoreWell,BWSSB
Complaints to RERA about this project
None on RERA Karnataka.
Documents
372 files on the RERA page: Approved plan ↗, Brochure ↗.
CaveatAs filed on RERA Karnataka. Complaints are listed without the names of the people who filed them.
Project cost
Money from buyers, each quarter
| Quarter | Collected from buyers | Withdrawn from the project account |
|---|---|---|
| Q3 2025-26 | ₹305.7 cr | ₹298.0 cr |
| Q4 2025-26 | ₹266.3 cr | ₹332.0 cr |
| Q1 2026-27 | ₹152.5 cr | ₹151.8 cr |
| Q2 2026-27 | ₹328.9 cr | ₹327.6 cr |
Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.
CaveatCost as certified by the builder's chartered accountant at registration.
What's around it?
Open the full location report on the map
Metro, rail, bus, airport
- Nearest operational metro station2.47 kmReliable
- Nearest railway station9.7 kmReliable
- Bus stops within 500 m1Caveat
Parks, shops, daily needs
- Supermarkets within 1 km3Caveat
- Parks within 1 km5Caveat
- Nearest lake / water body (≥2 ha)0.79 kmCaveat
Hospitals
- Nearest hospital0.45 kmCaveat
Schools
- Schools in pincode 560068 (UDISE+ census)144Caveat
- Private (classes 1–10 or 1–12), government and central schools within 1 km4Caveat
- Schools with library + playground + ICT lab (1 km)2Caveat
Police and crime
- Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
- Police station jurisdictionBegur PSReliable
Air quality
- PM2.5, recent 24 h avg (nearest CPCB station)18 µg/m³Caveat
Flood and waterlogging
- BBMP-listed flood / low-lying spots within 1 km1Caveat
Water availability
- Groundwater stage (CGWB block assessment)Over ExploitedCaveat
- Groundwater depth at nearest CGWB well1 m below groundCaveat
- In an IISc groundwater-critical ward (2025 outlook)noCaveat
Power reliability
- Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
- Un/partially-electrified layouts within 1 km1Caveat
Landfills, sewage plants, industry, aircraft
- Nearest named landfill / dump site (≥2 ha)3.66 kmReliable
- Nearest sewage treatment plant1.93 kmCaveat
- Industrial zones within 1 km1Caveat
- Nearest airfield runway (any, incl. military)8.92 kmCaveat
- Nearest commercial-airport runway35.63 kmReliable
- Distance to runway approach-path proxy33.46 kmCaveat
Upcoming infrastructure
- Under-construction projects within 3 km (verified)0Reliable
- Earlier-stage projects within 3 km (sanctioned/tendered/observed)0Caveat
ReliableFrom our location report at the builder-entered pin (12.87410, 77.62313), 2026-10-24. Each figure's source and caveat are in the full report.