Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

Prestige Serenity Shores

by PRESTIGE HABITAT VENTURES · 657 homes · 10.56 acres · 4 towers · Bengaluru East

Upcoming Under construction, due Aug 2027. 84% built with 79% of the time used. 100% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
84% built

Due 31 Aug 2027. 79% of the time from RERA approval to the deadline has passed.

Built84%
Time used79%
How much is sold?0 left
100% booked

657 of 657 homes, as the builder reported for Q2 2026-27.

How crowded is it?Less crowded
62 homes per acre

Similar projects within 3 km: 81 per acre. 85% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project. 2 more about the builder's other projects.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?55 due so far
25% on time

Of its 73 RERA projects in Bengaluru Urban: 14 delivered on time, 34 late (after the date first promised), 7 past due with no completion filed, 17 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Approved by RERA22 Aug 2023
  2. Work started1 Nov 2023
  3. Today24 Oct 2026

    79% of the time to the deadline has passed.

  4. If it slips like a typical project1 Jun 2028

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2671%
Q4 2025-2677%
Q1 2026-2782%
Q2 2026-2784%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

Tower 176%
Tower 276%
Tower 389%
Tower 490%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

657 booked0 leftQ2 2026-27

Booked, by type

1BED ODD11 of 11
2BED ODD19 of 19
3BED LARGE205 of 205
3BED MEDIUM98 of 98
4BED108 of 108
2BED73 of 73
3BED SMALL82 of 82
1 BHK61 of 61

Booked, each quarter

Q3 2025-26657 of 657
Q4 2025-26657 of 657
Q1 2026-27657 of 657
Q2 2026-27657 of 657

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3BED LARGE
1,295 sq ft
120 m² carpet
65 m² land share · 36 m² balcony/terrace · 1 parking space
205 homes · 31% of the project
4BED
1,774 sq ft
165 m² carpet
88 m² land share · 49 m² balcony/terrace · 1 parking space
108 homes · 16% of the project
3BED MEDIUM
1,098 sq ft
102 m² carpet
56 m² land share · 31 m² balcony/terrace · 1 parking space
98 homes · 15% of the project
3BED SMALL
889 sq ft
83 m² carpet · sizes 889–914 sq ft (41 at this size)
46 m² land share · 26 m² balcony/terrace · 1 parking space
82 homes · 12% of the project
2BED
805 sq ft
75 m² carpet
42 m² land share · 23 m² balcony/terrace · 1 parking space
73 homes · 11% of the project
1 BHK
412 sq ft
38 m² carpet · sizes 412–427 sq ft (20 at this size)
23 m² land share · 13 m² balcony/terrace · 1 parking space
61 homes · 9% of the project
2BED ODD
865 sq ft
80 m² carpet · sizes 659–940 sq ft (9 at this size)
46 m² land share · 26 m² balcony/terrace · 1 parking space
19 homes · 3% of the project
1BED ODD
568 sq ft
53 m² carpet · sizes 510–569 sq ft (5 at this size)
31 m² land share · 17 m² balcony/terrace · 1 parking space
11 homes · 2% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Tower 126 floors
Tower 226 floors
Tower 320 floors
Tower 410 floors

Tower 1: 215 homes, 83 m tall, 2 basements · Tower 2: 215 homes, 83 m tall, 2 basements · Tower 3: 166 homes, 64 m tall, 2 basements · Tower 4: 61 homes, 34 m tall, 2 basements

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project62
Typical within 3 km (139)81
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project85%
Typical within 3 km (139)74%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
10.56 acres

42,731 m²

Ground covered by buildings
15% of the land

6,422 m²

Floor-area ratio
2.24

Floors built per unit of land: 2.24 m² of floors for each m² of land.

Parking
1.29 per home

788 covered, 57 open

Built-up area, all floors
16,10,258 sq ft

1,49,598 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 73 RERA projects of Prestige Group on the map

Complaints to RERA about its other projects

The company

Registered as
PRESTIGE HABITAT VENTURES
Type
Partnership Firm
PAN
AAOFP5729K
GSTIN
29AAOFP5729K1ZG
Website
www.prestigeconstrucitons.com

Its other registrations on RERA Karnataka

The land is owned together with others (a joint development), including M/s.Trishul Buildtech & Infrastructures Pvt Ltd, M/s.Trishul Buildtech & Infrastructures Pvt Ltd.,.

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹266.4 crBuilding and development ₹508.5 crTotal ₹775.0 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹53.3 cr₹42.3 cr
Q4 2025-26₹33.9 cr₹45.5 cr
Q1 2026-27₹54.2 cr₹53.6 cr
Q2 2026-27₹33.7 cr₹34.3 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station5.2 kmReliable
  • Nearest railway station4.29 kmReliable
  • Bus stops within 500 m1Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km4Caveat
  • Parks within 1 km39Caveat
  • Nearest lake / water body (≥2 ha)1.56 kmCaveat

Hospitals

  • Nearest hospital0.34 kmCaveat

Schools

  • Schools in pincode 560066 (UDISE+ census)44Caveat
  • Median pupil-teacher ratio, schools within 1 km24.9 :1Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionVarthur PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • Groundwater depth at nearest CGWB well33.1 m below groundCaveat
  • In an IISc groundwater-critical ward (2025 outlook)noCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km1Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)10.36 kmReliable
  • Nearest sewage treatment plant2.4 kmCaveat
  • Industrial zones within 1 km0Caveat
  • Nearest airfield runway (any, incl. military)6.15 kmCaveat
  • Nearest commercial-airport runway28.57 kmReliable
  • Distance to runway approach-path proxy27.65 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)4Caveat

ReliableFrom our location report at the builder-entered pin (12.93115, 77.73709), 2026-10-24. Each figure's source and caveat are in the full report.