RERA project · Residential/Group Housing
Prestige Parklane
by APEX REALTY MANAGEMENT PRIVATE LIMITED · 1,788 homes · 11.22 acres · 9 towers · Bengaluru North
Upcoming Under construction, due Dec 2030. 1% built with 2% of the time used. 63% of homes booked.
At a glance
Due 31 Dec 2030. 2% of the time from RERA approval to the deadline has passed.
1,125 of 1,788 homes, as the builder reported for Q2 2026-27.
Similar projects across the city: 76 per acre. 82% of the land is left open.
Complaints to RERA about this project.
No litigation on the land or the project, as the builder declares it to RERA.
Of its 73 RERA projects in Bengaluru Urban: 14 delivered on time, 34 late (after the date first promised), 7 past due with no completion filed, 17 under way.
These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.
When will it be ready?
- Approved by RERA15 Sep 2026
- Work started1 Oct 2026
- Today24 Oct 2026
2% of the time to the deadline has passed.
- Deadline31 Dec 2030
The date it must be complete by.
- If it slips like a typical project2 Oct 2031
35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.
How much is built, each quarter
Built, as the builder reports itTime used by then
When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.
By tower, Q2 2026-27
CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.
How much is sold?
Still available: 18 × 2BHK LARGE, 156 × 3BHK + 2T, 123 × 3BHK + 3T LARGE, 121 × 3BHK + 3T SMALL, 221 × 1 BHK, 10 × 1BHK, 14 × 2BHK SMALL.
Booked, by type
Booked means sold or reserved, as the builder reports it. It says nothing about prices.
CaveatFrom the builder's quarterly updates to RERA Karnataka.
What's being built?
- 323 sq ft808 homes30.0 m²
- 884 sq ft73 homes82.1 m²
- 896 sq ft50 homes83.2 m²
- 883 sq ft25 homes82.0 m²
- 889 sq ft25 homes82.6 m²
- and 72 homes in other sizes
- 638 sq ft49 homes59.3 m²
- 642 sq ft49 homes59.6 m²
- 646 sq ft49 homes60.0 m²
- 645 sq ft46 homes59.9 m²
- and 3 homes in other sizes
- 484 sq ft148 homes45.0 m²
- 482 sq ft47 homes44.8 m²
- 1,079 sq ft100 homes100.2 m²
- 1,041 sq ft50 homes96.7 m²
- 998 sq ft48 homes92.7 m²
- 1,012 sq ft48 homes94.0 m²
- 995 sq ft25 homes92.4 m²
- 1,025 sq ft23 homes95.2 m²
- 323 sq ft49 homes30.0 m²
- 448 sq ft1 home41.6 m²
Carpet areas from the builder's flat-by-flat list on RERA, each size as listed with how many homes have it. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.
Towers
Tower-1: 148 homes, 77 m tall, 3 basements · Tower-2: 148 homes, 77 m tall, 3 basements · Tower-3: 148 homes, 77 m tall, 3 basements · Tower-4: 148 homes, 77 m tall, 3 basements · Tower-5: 247 homes, 77 m tall, 3 basements · Tower-6: 267 homes, 77 m tall, 3 basements · Tower-7: 245 homes, 77 m tall, 3 basements · Tower-8: 269 homes, 77 m tall, 3 basements · Tower-9: 168 homes, 77 m tall, 3 basements
Amenities
- Electricity 721 m²
- CCTV Surveillance 12 m²
- Club House 3,205 m²
- Community Hall 245 m²
- Outdoor Sports facility 1,385 m²
- Indoor Sports facility 485 m²
- Swimming Pool 377 m²
- Gym 171 m²
- Parks 4,817 m²
- Power Backup 483 m²
- Water and Sanitation 3,145 m²
CaveatAs registered by the builder on RERA Karnataka.
How crowded is it?
Homes per acre
Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.
Land left open
The share of the land not built on, which includes roads.
- Land
- 11.22 acres
- Ground covered by buildings
- 18% of the land
- Floor-area ratio
- 1.74
- Parking
- 1.07 per home
- Built-up area, all floors
- 26,85,970 sq ft
45,401 m²
8,048 m²
Floors built per unit of land: 1.74 m² of floors for each m² of land.
1,780 covered, 130 open
2,49,535 m²
CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.
Who is building it?
All 73 RERA projects of Prestige Group on the map
The company
- Registered as
- APEX REALTY MANAGEMENT PRIVATE LIMITED
- Type
- Company
- Company number
- U45200KA2018PTC119740
- PAN
- AARCA7125N
- GSTIN
- 29AARCA7125N1ZY
- Website
- www.prestigeconstructions.com
CIN or LLPIN, from the Registrar of Companies.
CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.
Paperwork and legal
- Registered with RERAPRM/KA/RERA/1251/309/PR/150926/008941 · Approved
- Building plan approvedKIADB - Karnataka Industrial Areas Development Board · DO3-KIADB-00128/26-27/BP · 13 Aug 2026
- Litigation on the landNone declared
- Litigation on the projectNone declared in the Q2 2026-27 update
- Water sourceBoreWell
Complaints to RERA about this project
None on RERA Karnataka.
Documents
130 files on the RERA page: Approved plan ↗, Commencement certificate ↗, Brochure ↗.
CaveatAs filed on RERA Karnataka. Complaints are listed without the names of the people who filed them.
Project cost
Money from buyers, each quarter
| Quarter | Collected from buyers | Withdrawn from the project account |
|---|---|---|
| Q2 2026-27 | ₹43.4 cr | ₹7.2 cr |
Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.
CaveatCost as certified by the builder's chartered accountant at registration.
What's around it?
Open the full location report on the map
Metro, rail, bus, airport
- Nearest operational metro station24.03 kmReliable
- Nearest railway station7.71 kmReliable
- Bus stops within 500 m0Caveat
Parks, shops, daily needs
- Supermarkets within 1 km0Caveat
- Parks within 1 km0Caveat
- Nearest lake / water body (≥2 ha)1.55 kmCaveat
Hospitals
- Nearest hospital4.75 kmCaveat
Schools
- Schools in pincode 562129 (UDISE+ census)3Caveat
Police and crime
- Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
Flood and waterlogging
- BBMP-listed flood / low-lying spots within 1 km0Caveat
Water availability
- Groundwater stage (CGWB block assessment)Over ExploitedCaveat
Power reliability
- Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
- Un/partially-electrified layouts within 1 km0Caveat
Landfills, sewage plants, industry, aircraft
- Nearest named landfill / dump site (≥2 ha)12.47 kmReliable
- Nearest sewage treatment plant4.46 kmCaveat
- Industrial zones within 1 km0Caveat
- Nearest airfield runway (any, incl. military)4.84 kmCaveat
- Nearest commercial-airport runway4.84 kmReliable
- Distance to runway approach-path proxy0 kmCaveat
Upcoming infrastructure
- Under-construction projects within 3 km (verified)0Reliable
- Earlier-stage projects within 3 km (sanctioned/tendered/observed)0Caveat
ReliableFrom our location report at the builder-entered pin (13.21296, 77.76711), 2026-10-24. Each figure's source and caveat are in the full report.