Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

Prestige Parklane

by APEX REALTY MANAGEMENT PRIVATE LIMITED · 1,788 homes · 11.22 acres · 9 towers · Bengaluru North

Upcoming Under construction, due Dec 2030. 1% built with 2% of the time used. 63% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
1% built

Due 31 Dec 2030. 2% of the time from RERA approval to the deadline has passed.

Built1%
Time used2%
How much is sold?663 left
63% booked

1,125 of 1,788 homes, as the builder reported for Q2 2026-27.

How crowded is it?More crowded
159 homes per acre

Similar projects across the city: 76 per acre. 82% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?55 due so far
25% on time

Of its 73 RERA projects in Bengaluru Urban: 14 delivered on time, 34 late (after the date first promised), 7 past due with no completion filed, 17 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Approved by RERA15 Sep 2026
  2. Work started1 Oct 2026
  3. Today24 Oct 2026

    2% of the time to the deadline has passed.

  4. If it slips like a typical project2 Oct 2031

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q2 2026-271%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

Tower-10%
Tower-20%
Tower-30%
Tower-40%
Tower-50%
Tower-60%
Tower-70%
Tower-80%
Tower-90%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

1,125 booked663 leftQ2 2026-27

Still available: 18 × 2BHK LARGE, 156 × 3BHK + 2T, 123 × 3BHK + 3T LARGE, 121 × 3BHK + 3T SMALL, 221 × 1 BHK, 10 × 1BHK, 14 × 2BHK SMALL.

Booked, by type

2BHK LARGE178 of 196
3BHK + 2T89 of 245
3BHK + 3T LARGE27 of 150
3BHK + 3T SMALL23 of 144
1BHK LARGE1 of 1
1 BHK587 of 808
1BHK39 of 49
2BHK SMALL181 of 195

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

1 BHK
  • 323 sq ft808 homes30.0 m²
Typically 12 m² land share · 14 m² balcony/terrace · 1 parking space
808 homes · 45% of the project
3BHK + 2T
  • 884 sq ft73 homes82.1 m²
  • 896 sq ft50 homes83.2 m²
  • 883 sq ft25 homes82.0 m²
  • 889 sq ft25 homes82.6 m²
  • and 72 homes in other sizes
Typically 32 m² land share · 35 m² balcony/terrace · 1 parking space
245 homes · 14% of the project
2BHK LARGE
  • 638 sq ft49 homes59.3 m²
  • 642 sq ft49 homes59.6 m²
  • 646 sq ft49 homes60.0 m²
  • 645 sq ft46 homes59.9 m²
  • and 3 homes in other sizes
Typically 24 m² land share · 26 m² balcony/terrace · 1 parking space
196 homes · 11% of the project
2BHK SMALL
  • 484 sq ft148 homes45.0 m²
  • 482 sq ft47 homes44.8 m²
Typically 18 m² land share · 20 m² balcony/terrace · 1 parking space
195 homes · 11% of the project
3BHK + 3T LARGE
  • 1,079 sq ft100 homes100.2 m²
  • 1,041 sq ft50 homes96.7 m²
Typically 39 m² land share · 44 m² balcony/terrace · 1 parking space
150 homes · 8% of the project
3BHK + 3T SMALL
  • 998 sq ft48 homes92.7 m²
  • 1,012 sq ft48 homes94.0 m²
  • 995 sq ft25 homes92.4 m²
  • 1,025 sq ft23 homes95.2 m²
Typically 35 m² land share · 39 m² balcony/terrace · 1 parking space
144 homes · 8% of the project
1BHK
  • 323 sq ft49 homes30.0 m²
Typically 12 m² land share · 14 m² balcony/terrace · 1 parking space
49 homes · 3% of the project
1BHK LARGE
  • 448 sq ft1 home41.6 m²
Typically 18 m² land share · 20 m² balcony/terrace · 1 parking space
1 home · 0% of the project

Carpet areas from the builder's flat-by-flat list on RERA, each size as listed with how many homes have it. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Tower-124 floors
Tower-224 floors
Tower-324 floors
Tower-424 floors
Tower-524 floors
Tower-624 floors
Tower-724 floors
Tower-824 floors
Tower-924 floors

Tower-1: 148 homes, 77 m tall, 3 basements · Tower-2: 148 homes, 77 m tall, 3 basements · Tower-3: 148 homes, 77 m tall, 3 basements · Tower-4: 148 homes, 77 m tall, 3 basements · Tower-5: 247 homes, 77 m tall, 3 basements · Tower-6: 267 homes, 77 m tall, 3 basements · Tower-7: 245 homes, 77 m tall, 3 basements · Tower-8: 269 homes, 77 m tall, 3 basements · Tower-9: 168 homes, 77 m tall, 3 basements

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project159
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project82%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
11.22 acres

45,401 m²

Ground covered by buildings
18% of the land

8,048 m²

Floor-area ratio
1.74

Floors built per unit of land: 1.74 m² of floors for each m² of land.

Parking
1.07 per home

1,780 covered, 130 open

Built-up area, all floors
26,85,970 sq ft

2,49,535 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 73 RERA projects of Prestige Group on the map

The company

Registered as
APEX REALTY MANAGEMENT PRIVATE LIMITED
Type
Company
Company number
U45200KA2018PTC119740

CIN or LLPIN, from the Registrar of Companies.

PAN
AARCA7125N
GSTIN
29AARCA7125N1ZY
Website
www.prestigeconstructions.com

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹83.6 crBuilding and development ₹982.9 crTotal ₹1,066.6 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q2 2026-27₹43.4 cr₹7.2 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station24.03 kmReliable
  • Nearest railway station7.71 kmReliable
  • Bus stops within 500 m0Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km0Caveat
  • Nearest lake / water body (≥2 ha)1.55 kmCaveat

Hospitals

  • Nearest hospital4.75 kmCaveat

Schools

  • Schools in pincode 562129 (UDISE+ census)3Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)12.47 kmReliable
  • Nearest sewage treatment plant4.46 kmCaveat
  • Industrial zones within 1 km0Caveat
  • Nearest airfield runway (any, incl. military)4.84 kmCaveat
  • Nearest commercial-airport runway4.84 kmReliable
  • Distance to runway approach-path proxy0 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)0Caveat

ReliableFrom our location report at the builder-entered pin (13.21296, 77.76711), 2026-10-24. Each figure's source and caveat are in the full report.