Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

Pramuk MM Magnus

by PRAMUK INFRACON LLP · 95 homes · 1.61 acres · 1 tower · Bengaluru South

Upcoming Under construction, due May 2029. 16% built with 35% of the time used. 46% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
16% built

Due 4 May 2029. 35% of the time from RERA approval to the deadline has passed.

Built16%
Time used35%
How much is sold?51 left
46% booked

44 of 95 homes, as the builder reported for Q2 2026-27.

How crowded is it?About the same
59 homes per acre

Similar projects within 3 km: 56 per acre. 71% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?1 due so far
0% on time

Of its 2 RERA projects in Bengaluru Urban: 0 delivered on time, 1 late (after the date first promised), 1 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started3 May 2025
  2. Approved by RERA13 Jun 2025
  3. Today24 Oct 2026

    35% of the time to the deadline has passed.

  4. If it slips like a typical project3 Feb 2030

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-266%
Q4 2025-2610%
Q1 2026-2713%
Q2 2026-2716%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

44 booked51 leftQ2 2026-27

Still available: 39 × 3 BHK, 12 × 4 BHK.

Booked, by type

3 BHK35 of 74
4 BHK9 of 21

Booked, each quarter

Q3 2025-2639 of 95
Q4 2025-2638 of 95
Q1 2026-2743 of 95
Q2 2026-2744 of 95

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3 BHK
1,435 sq ft
133 m² carpet · sizes 1,213–1,511 sq ft (15 at this size)
49 m² land share · 40 m² balcony/terrace · 2 parking spaces
74 homes · 78% of the project
4 BHK
2,114 sq ft
196 m² carpet · sizes 1,982–2,192 sq ft (2 at this size)
72 m² land share · 60 m² balcony/terrace · 2 parking spaces
21 homes · 22% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Single Tower10 floors

Single Tower: 95 homes, 36 m tall, 3 basements

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project59
Typical within 3 km (26)56
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project71%
Typical within 3 km (27)54%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
1.61 acres

6,497 m²

Ground covered by buildings
29% of the land

1,891 m²

Floor-area ratio
2.50

Floors built per unit of land: 2.50 m² of floors for each m² of land.

Parking
2.31 per home

202 covered, 17 open

Built-up area, all floors
3,37,298 sq ft

31,336 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 2 RERA projects of Pramuk Infracon LLP on the map

The company

Registered as
PRAMUK INFRACON LLP
Type
Partnership Firm
Company number
AAA-3977

CIN or LLPIN, from the Registrar of Companies.

PAN
AAIFP8026D
GSTIN
29AAIFP8026D1Z5

Its other registrations on RERA Karnataka

The land is owned together with others (a joint development), including M. M. Industrial Estate.

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹114.2 crBuilding and development ₹138.6 crTotal ₹252.8 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹3.2 cr₹1.6 cr
Q4 2025-26₹9.4 cr₹1.1 cr
Q1 2026-27₹12.3 cr₹11.8 cr
Q2 2026-27₹15.4 cr₹7.5 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station0.68 kmReliable
  • Nearest railway station4.85 kmReliable
  • Bus stops within 500 m7Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km1Caveat
  • Parks within 1 km20Caveat
  • Nearest lake / water body (≥2 ha)0.47 kmCaveat

Hospitals

  • Nearest hospital0.21 kmCaveat

Schools

  • Schools in pincode 560070 (UDISE+ census)51Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km18Caveat
  • Median pupil-teacher ratio, schools within 1 km15.7 :1Caveat
  • Schools with library + playground + ICT lab (1 km)12Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionBanashankari PSReliable

Air quality

  • PM2.5, recent 24 h avg (nearest CPCB station)29 µg/m³Caveat

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • Groundwater depth at nearest CGWB well10 m below groundCaveat
  • In an IISc groundwater-critical ward (2025 outlook)noCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km1Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)8.98 kmReliable
  • Nearest sewage treatment plant1.84 kmCaveat
  • Industrial zones within 1 km1Caveat
  • Nearest airfield runway (any, incl. military)8.93 kmCaveat
  • Nearest commercial-airport runway31.29 kmReliable
  • Distance to runway approach-path proxy27.6 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)2Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)2Caveat

ReliableFrom our location report at the builder-entered pin (12.93050, 77.57393), 2026-10-24. Each figure's source and caveat are in the full report.