Upcoming Under construction, due Dec 2027. 28% built with 42% of the time used. 5% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
28% built

Due 31 Dec 2027. 42% of the time from RERA approval to the deadline has passed.

Built28%
Time used42%
How much is sold?19 left
5% booked

1 of 20 homes, as the builder reported for Q2 2026-27.

How crowded is it?More crowded
96 homes per acre

Similar projects within 3 km: 78 per acre. 38% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?1 due so far
0% on time

Of its 2 RERA projects in Bengaluru Urban: 0 delivered on time, 1 late (after the date first promised), 1 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started25 Sep 2025
  2. Approved by RERA17 Dec 2025
  3. Today24 Oct 2026

    42% of the time to the deadline has passed.

  4. If it slips like a typical project1 Oct 2028

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-267%
Q4 2025-2615%
Q1 2026-2720%
Q2 2026-2728%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

1 booked19 leftQ2 2026-27

Still available: 11 × 2 BHK, 8 × 3 BHK.

Booked, by type

2 BHK1 of 12
3 BHK0 of 8

Booked, each quarter

Q3 2025-260 of 12
Q4 2025-260 of 20
Q1 2026-270 of 20
Q2 2026-271 of 20

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

2 BHK
695 sq ft
65 m² carpet · sizes 695–742 sq ft (4 at this size)
39 m² land share · 8 m² balcony/terrace · 1 parking space
12 homes · 60% of the project
3 BHK
914 sq ft
85 m² carpet · sizes 914–996 sq ft (4 at this size)
48 m² land share · 5 m² balcony/terrace · 1 parking space
8 homes · 40% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Pramodh Fort House3 floors

Pramodh Fort House: 20 homes, 15 m tall

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project96
Typical within 3 km (92)78
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project38%
Typical within 3 km (92)55%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
0.21 acres

841 m²

Ground covered by buildings
61% of the land

517 m²

Floor-area ratio
2.25

Floors built per unit of land: 2.25 m² of floors for each m² of land.

Parking
1.10 per home

20 covered, 2 open

Built-up area, all floors
27,480 sq ft

2,553 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 2 RERA projects of THIPPARTHI CONSTRUCTIONS & HOUSING PRIVATE LIMITED on the map

The company

Registered as
Thipparthi Constructions And Housing Pvt Ltd
Type
Company
PAN
AABCT7408B

Its other registrations on RERA Karnataka

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹1.0 crBuilding and development ₹7.6 crTotal ₹8.6 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹0.0 lakh₹0.0 lakh
Q4 2025-26₹0.0 lakh₹2.6 cr
Q1 2026-27₹0.0 lakh₹3.0 cr
Q2 2026-27₹55.0 lakh₹0.0 lakh

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station9.09 kmReliable
  • Nearest railway station4.64 kmReliable
  • Bus stops within 500 m3Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km1Caveat
  • Parks within 1 km6Caveat
  • Nearest lake / water body (≥2 ha)0.99 kmCaveat

Hospitals

  • Nearest hospital1.43 kmCaveat

Schools

  • Schools in pincode 560064 (UDISE+ census)240Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km6Caveat
  • Median pupil-teacher ratio, schools within 1 km17 :1Caveat
  • Schools with library + playground + ICT lab (1 km)3Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionSampigehalli PSReliable

Air quality

  • PM2.5, recent 24 h avg (nearest CPCB station)32 µg/m³Caveat

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • In an IISc groundwater-critical ward (2025 outlook)yesCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km1Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)4.78 kmReliable
  • Nearest sewage treatment plant0.98 kmCaveat
  • Industrial zones within 1 km0Caveat
  • Nearest airfield runway (any, incl. military)2.25 kmCaveat
  • Nearest commercial-airport runway15.41 kmReliable
  • Distance to runway approach-path proxy11.98 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)2Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)3Caveat

ReliableFrom our location report at the builder-entered pin (13.06842, 77.61988), 2026-10-24. Each figure's source and caveat are in the full report.