by PRAYUKTHA PROPERTIES LLP · 75 homes · 0.98 acres · 1 tower · Yelahanka

Upcoming Under construction, due Dec 2030. 25% built with 29% of the time used. 13% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
25% built

Due 31 Dec 2030. 29% of the time from RERA approval to the deadline has passed.

Built25%
Time used29%
How much is sold?65 left
13% booked

10 of 75 homes, as the builder reported for Q3 2025-26.

How crowded is it?More crowded
76 homes per acre

Similar projects within 3 km: 22 per acre. 60% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?No other record
Only this project

It is the only RERA project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started4 Dec 2024
  2. Approved by RERA18 Feb 2025
  3. Today24 Oct 2026

    29% of the time to the deadline has passed.

  4. If it slips like a typical project2 Oct 2031

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2625%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

10 booked65 leftQ3 2025-26

Still available: 64 × 2 BHK, 1 × 3 BHK.

Booked, by type

2 BHK6 of 70
3 BHK4 of 5

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

2 BHK
758 sq ft
70 m² carpet · sizes 757–987 sq ft (29 at this size)
49 m² land share · 8 m² balcony/terrace · 1 parking space
70 homes · 93% of the project
3 BHK
757 sq ft
70 m² carpet · sizes 757–987 sq ft (2 at this size)
49 m² land share · 8 m² balcony/terrace · 1 parking space
5 homes · 7% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

PM Garden Apartments5 floors

PM Garden Apartments: 75 homes, 15 m tall, 1 basement

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project76
Typical within 3 km (9)22
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project60%
Typical within 3 km (9)63%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
0.98 acres

3,980 m²

Ground covered by buildings
40% of the land

1,589 m²

Floor-area ratio
1.98

Floors built per unit of land: 1.98 m² of floors for each m² of land.

Parking
1.12 per home

84 covered, 0 open

Built-up area, all floors
73,442 sq ft

6,823 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

This is the only project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

The company

Registered as
PRAYUKTHA PROPERTIES LLP
Type
Partnership Firm

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹2.5 crBuilding and development ₹23.5 crTotal ₹26.0 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹89.5 lakh₹88.0 lakh

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station15.2 kmReliable
  • Nearest railway station2.51 kmReliable
  • Bus stops within 500 m0Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km0Caveat
  • Nearest lake / water body (≥2 ha)1.1 kmCaveat

Hospitals

  • Nearest hospital2.39 kmCaveat

Schools

  • Schools in pincode 560064 (UDISE+ census)240Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionRajanukunte PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km1Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)6.45 kmReliable
  • Nearest sewage treatment plant7.36 kmCaveat
  • Industrial zones within 1 km3Caveat
  • Nearest airfield runway (any, incl. military)7.27 kmCaveat
  • Nearest commercial-airport runway15.84 kmReliable
  • Distance to runway approach-path proxy7.7 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)1Caveat

ReliableFrom our location report at the builder-entered pin (13.17908, 77.54288), 2026-10-24. Each figure's source and caveat are in the full report.