RERA project · Residential/Group Housing
Parkwest - Maple - Tower 4
by Relationship Properties Private Limited · 552 homes · 5.45 acres · 1 tower · Bengaluru South
Delivered late Completed: the builder filed for completion on 10 Jul 2024, 1,287 days after the date it first promised.
At a glance
The builder filed for completion on 10 Jul 2024, 1,287 days after the date it first promised.
The builder has not filed bookings on RERA.
Similar projects within 3 km: 79 per acre. 90% of the land is left open.
Complaints to RERA about this project. 132 more about the builder's other projects.
The RERA page doesn't say.
Of its 11 RERA projects in Bengaluru Urban: 0 delivered on time, 5 late (after the date first promised), 4 past due with no completion filed, 2 under way.
These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.
Was it delivered on time?
- Work started25 Oct 2016
- Approved by RERA15 Oct 2017
- First promised31 Dec 2020
The date the builder gave at registration.
- Completion filed10 Jul 2024
The builder told RERA the project is complete. Ask for the occupancy certificate before moving in.
No quarterly construction update is filed on this project's RERA page.
CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.
What's being built?
Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.
Towers
Maple: 552 homes, 2 basements
Amenities
- Electricity
- CCTV Surveillance
- Gym
- Power Backup
- Gas
- Water and Sanitation
- Display room
- AV room
- Kids Play area
- Multipurpose hall
- Meditation/ Yoga
CaveatAs registered by the builder on RERA Karnataka.
How crowded is it?
Homes per acre
Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.
Land left open
The share of the land not built on, which includes roads.
- Land
- 5.45 acres
- Ground covered by buildings
- 11% of the land
22,052 m²
2,321 m²
CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.
Who is building it?
All 11 RERA projects of Relationship Properties Private Limited on the map
Complaints to RERA about its other projects
132 complaints across 7 projects. The most complained about:
- Parkwest - Magnolia - Tower 6 79 complaints
- Parkwest - Sapphire- Tower 5 24 complaints
- Parkwest - Pine - Tower 9 14 complaints
- Parkwest - Oak - Tower 10 8 complaints
- Parkwest - Cedar - Tower 8 3 complaints
Show all 7 projects
- Parkwest - Olive - Tower 1 2 complaints
- Parkwest - Mahogany - Tower 7 2 complaints
The company
- Registered as
- Relationship Properties Private Limited
- Type
- Company
- Company number
- U45200MH2008PTC178830
- PAN
- AADCR8947D
CIN or LLPIN, from the Registrar of Companies.
CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.
Paperwork and legal
- Registered with RERAPRM/KA/RERA/1251/310/PR/171015/000277 · Approved
- Building plan approvedBBMP - Bruhat Bengaluru Mahanagara Palike
- Litigation on the landNot stated
- Litigation on the projectNot stated
Complaints to RERA about this project
- Delay in Project Delivery as promised in Advertisement and Agrement 9 Oct 2020 · Disposed Authority Bench6
- Delay in apartment unit and amenities handover as committed in the Agreemetn 10 Oct 2020 · Disposed Authority Bench4
- Delay in Project Delivery as promised in Advertisement and Agrement 10 Oct 2020 · Disposed Authority Bench6
- POSSESSION PENDING 11 Oct 2020 · Disposed Authority Bench6
- Delay of 18 months to hand over possession of the Apartment 30 Nov 2020 · Disposed Authority Bench6
- Delay in Handover Date 23 Dec 2020 · Disposed Authority Bench6
- Delay in completion & Handover 24 Dec 2020 · Disposed Authority Bench6
- Breach of Agreement 24 Dec 2020 · Disposed Authority Bench4
- Compensation for delayed delivery 2 Jan 2021 · Disposed Authority Bench6
- Delivery date expiry 4 Jan 2021 · Disposed Authority Bench6
- Not honoring commitment to delivery date of Dec 2019 as per agreement 100% payment taken 9 Jan 2021 · Disposed Authority Bench6
- DELAY IN DELVERY OF FLAT 11 Jan 2021 · Disposed Authority Bench6
- Delay in completion and handover of flat 6 Feb 2021 · Disposed Authority Bench6
- Delay in handing over of property 8 Feb 2021 · Disposed Authority Fullbench
- Compensation for the delay as per Rera provisions, from the agreement delivery date. 9 Feb 2021 · Disposed Authority Bench6
- Flat is not handed over as per the due date - December 2019 23 Feb 2021 · Disposed Authority Bench6
- DELIVERY DATE OF EXPIRY (DEC 2019) 2 Mar 2021 · Disposed Authority Bench6
- Promise vs. Delivery 4 Jul 2021 · Disposed Authority Bench6
- Delay in Completion of Project 2 Aug 2021 · Disposed Authority Bench6
- Compensation for delivery date expiry 8 Oct 2021 · Disposed Authority Bench4
- Not honoring commitment to delivery date of Dec 2019 as per agreement 100% payment taken 12 Oct 2021 · Disposed Authority Fullbench
- fast delivery of the flat and compensation for the delay 12 Oct 2021 · Disposed Authority Bench4
- Delay in completion and handover of flat as promised in Advertisement and Agreement 19 Oct 2021 · Disposed Authority Bench4
- Inordinate delay of the delivery of the flat. No clarity on compensating for the delay 28 Oct 2021 · Disposed Authority Bench4
- DELAY IN COMPLETION OF PROJECT 28 Oct 2021 · Disposed Authority Bench4
- Delay in Handover of Project 31 Oct 2021 · Disposed Authority Bench4
- Continuous delayed in Delivery of project 9 Nov 2021 · Disposed Authority Bench4
- delay in delivery of flat and no updates on compensation 9 Nov 2021 · Disposed Authority Bench4
- Delivery Delayed , Compensation for the Delay as per agreement 26 Nov 2021 · Disposed Authority Bench4
- Mis-selling and Wrong delivery date committed by developer without giving any compensation till date 2 Dec 2021 · Disposed Authority Bench4
- Possession Delayed by 4 years - Compensation Required 20 Jan 2022 · Disposed Authority Bench4
- Delay in delivery of ParkWest Maple - tower 4 20 Jan 2022 · Disposed Authority Bench4
- Compensation and Pocession of flat 21 Jan 2022 · Disposed Authority Bench4
- Unreasonable delay : Since Dec 2019 /No clear committment on delivery even now/No committment on compensation/No response to our emails 21 Jan 2022 · Disposed Authority Bench4
- Delivery delayed, no responses to queries about delivery and compensation 22 Jan 2022 · Disposed Authority
- As of now, more than 2 years delay in possession and demand for compensation 22 Jan 2022 · Disposed Authority Bench4
- Delay in handing over of my flat MA003 in Maple tower of Parkwest Project & no compensation commitment 7 Feb 2022 · Disposed Authority Bench4
- Unreasonable delay - Since Dec 2019 / No clear commitment on delivery as dates keep changing emails/ 15 Feb 2022 · Disposed Authority Bench4
- Monthly compensation for delayed 18 Feb 2022 · Disposed Authority Bench4
- Delay compensation as per RERA 18 Feb 2022 · Disposed Authority Bench4
- As of now, more than 2 years delay in possession and demand for compensation 26 Feb 2022 · Disposed Ao
- Delivery Date Expiry 4 Mar 2022 · Disposed Authority Bench4
- Demand for refund of amount with interest for the delay of 2years 4 Mar 2022 · Disposed Authority Bench4
- Around 2 years delay from committed possession date and hence demand for compensation over and above interest for payment done 4 Mar 2022 · Disposed Authority Bench4
- Compensation for delay in delivery of apartment 9 Mar 2022 · Disposed Authority Bench4
- Return of amount andcompensation in full 9 Mar 2022 · Disposed Ao
- Unreasonable delay in the delivery of the project 10 Mar 2022 · Disposed Ao
- Delay in delivery of the Flat and compensation 10 Mar 2022 · Disposed Authority Bench4
- Delay in Construction and Cheating by Builder 10 Mar 2022 · Disposed Authority Bench4
- More than two years of delay in delivery and demand for compensation 14 Mar 2022 · Disposed Authority Bench4
- Delivery of delayed project and interest for delay along with suitable compensation 14 Mar 2022 · Disposed Authority Bench4
- compensation 14 Mar 2022 · Disposed Authority Bench4
- FAIR COMPENSATION AND EARLY HANDOVER OF FLAT 16 Mar 2022 · Disposed Authority Bench4
- More than 2 years Delay in possession and demand for Compensation 16 Mar 2022 · Disposed Authority Bench4
- More than 2 years Delay in possession and demand for Compensation 16 Mar 2022 · Disposed Authority Bench4
- Delay in Handover - Breach of Agreement Clause with respect to committed delivery date 16 Mar 2022 · Disposed Authority Bench4
- Delay in handing over of property and seeking compensation for delay in handover of Property 16 Mar 2022 · Disposed Authority Bench4
- As of now, delayed in possession of the flat for more then 2 years and hence demand for Compensation with intrest 16 Mar 2022 · Disposed Authority Bench4
- As of now, delayed in possession of the flat for more then 2 years and hence demand for Compensation with interest 16 Mar 2022 · Disposed Authority Bench4
- DELAY IN POSSESSION 18 Mar 2022 · Disposed Authority Bench4
- DELAY IN POSSESSION 18 Mar 2022 · Disposed Authority Bench4
- DELAY IN POSSESSION 18 Mar 2022 · Disposed Authority Bench4
- COMPENSATION 21 Mar 2022 · Disposed Authority Bench4
- Delay in Possession by more than two years DEc 2019 21 Mar 2022 · Disposed Authority Bench4
- FAIR COMPENSATION AND EARLY HANDOVER OF FLAT 21 Mar 2022 · Disposed Authority Bench4
- As of now , more than 2 years delay in possession and demand for compensation . 21 Mar 2022 · Disposed Authority Bench4
- More than 2 years delay in handing over the flat . No compensation paid . No confirmation on registration date . 21 Mar 2022 · Disposed Authority Bench4
- Heavy delay from Contract Agreement delivery 21 Mar 2022 · Disposed Authority Bench4
- Delivery of delayed project and interest for delay along with suitable compensation 21 Mar 2022 · Disposed Authority Bench4
- Delay in possession and demand for compensation 21 Mar 2022 · Disposed Authority Bench4
- Delayed Delivery and Pending Compensation 21 Mar 2022 · Disposed Authority Bench4
- Completion of development works + Formation of Association and compliance to the Act 21 Mar 2022 · Disposed Authority Bench4
- Delay in possession of flat 21 Mar 2022 · Disposed Authority Bench4
- delay in handing over of apartment and seeking compensation for delay in handover of property. flat no-MB703 22 Mar 2022 · Disposed Authority Bench4
- MA203 Flat at parkwest binnypet, delayed handing over. As per agreement project to be handed over on Dec2019. But till now not handed over to me. 22 Mar 2022 · Disposed Authority Bench4
- Delay in handing over complete project 24 Mar 2022 · Disposed Authority Bench4
- As of now, more than 2 years delay in possession and demand for compensation 24 Mar 2022 · Disposed Authority Bench4
- As of now more than 2 years delay in possession and demand for compensation 28 Mar 2022 · Disposed Authority Bench4
- I have booked 1 bhk flat and delivery was supposed to be given in December 2019 and till now same is not given. I am seeking compensation for delay in delivery.rs.20,000 per month from Jan 2020 28 Mar 2022 · Disposed Authority Bench4
- extended delay 29 Mar 2022 · Disposed Authority Bench4
- Compensation due to delay in Delivery 29 Mar 2022 · Disposed Authority Bench4
- Huge delay in Construction completion so reqire compensation 1 Apr 2022 · Disposed Authority Bench4
- Delay in delivery of project and no visibility of end date, demand of compensation 1 Apr 2022 · Disposed Authority Bench4
- Project delivery delayed by over a year 4 Apr 2022 · Disposed Authority Bench4
- Project Delayed and hence requesting refund along with interest and other damages 8 Apr 2022 · Disposed Authority Bench4
- Delay in handing over of property and seeking compensation for delay in handover of Property MB1003 11 Apr 2022 · Disposed Authority Bench4
- As per the sale agreement possession date December 2019 16 Apr 2022 · Disposed Authority Bench4
- Delivery Date Expiry 16 Apr 2022 · Disposed Authority Bench4
- As of now, more then 2 years delay in possession and demand for compensation 16 Apr 2022 · Disposed Authority Bench4
- Delay in possession and demand for compensation 21 Apr 2022 · Disposed Authority Bench4
- More than 2 years of delay in possession and demand for compensation 26 Apr 2022 · Disposed Authority Bench4
- Unreasonable delay - Since Dec 2020/ No clear commitment on delivery as dates keep changing . 30 Apr 2022 · Disposed Authority Bench4
- Possession Delayed by 2 years and demand for compensation 4 May 2022 · Disposed Authority Bench4
- Project Delayed for more than 2 years hence requesting refund along with interest and damages 7 May 2022 · Disposed Authority Bench4
- Compensation for delay unit and timely posession of my apartment 16 May 2022 · Disposed Authority
- COMPENSATION & POSSESSION OF FLAT 17 May 2022 · Disposed Authority Bench4
- Delivery of delayed project and interest for delay along with suitable compensation 17 May 2022 · Disposed Authority Bench4
- COMPENSATION FOR DELAYED DELIVERY AND COMPLETION OF FLAT ASAP 18 May 2022 · Disposed Authority Fullbench
- Delay in possession and demand for compensation 20 May 2022 · Disposed Authority
- MISREPRESENTATION OF DATE OF DELIVERTY 20 May 2022 · Disposed Authority Bench4
- As of now, more than 2 years delay in possession and demand for compensation 20 May 2022 · Disposed Authority
- Huge delay in completion of Building or Tower 23 May 2022 · Disposed Authority Bench4
- Hudge Delay in Completion of the project 24 May 2022 · Disposed Authority
- Project Delayed by over 29 months 25 May 2022 · Disposed Authority
- DELAY COMPENSATION AT 18% INTEREST FROM JANUARY2020 TILL DATE OF POSSESSION, ON TOTAL AMOUNT PAID BY ME 26 May 2022 · Disposed Authority
- Delay in Handover of Flat and Compensation 30 May 2022 · Disposed Authority
- Delay in delivery 30 May 2022 · Disposed Authority
- As of now more than 2 years delay in possession and looking for compensation 30 May 2022 · Disposed Authority
- Non delivery of the flat 31 May 2022 · Disposed Authority Bench4
- As of now, more than 2 years delay in possession and demand for compensation. 31 May 2022 · Disposed Authority Bench4
- Request Compensation Due to delay In Possession 1 Jun 2022 · Disposed Authority
- THE PROJECT DELAYED NO COMPENSATION YET PAID NOR DELIVERY DATE CONFIRMED 1 Jun 2022 · Disposed Authority
- Delivery date was December 2019, Project is not yet completed and pending for possession. 1 Jun 2022 · Disposed Authority
- As of now, more than 2 years delay in possession and demand for compensation 1 Jun 2022 · Disposed Authority
- Delay in handing over of property and seeking compensation for delay in handover of Property AND SPEEDY PAYMENT MADE COMPENSATION OF FLAT NO- MB 1903 2 Jun 2022 · Disposed Authority Bench4
- Delay in Possession of unit MA1005 2 Jun 2022 · Disposed Authority
- DELAY IN POSSESSION AND COMPENSATION 2 Jun 2022 · Disposed Authority
- EXPIRY OF DELIVERY DATE - DEC-31-2019 3 Jun 2022 · Disposed Authority Bench4
- Compensation 3 Jun 2022 · Disposed Authority
- Delay in delivery of the apartment 3 Jun 2022 · Disposed Authority
- Parkwest Maple possession is being delayed 3 Jun 2022 · Disposed Authority
- EXTREME DELAY IN HANDING OVER THE FLAT MA306, MAPLE TOWER, PARKWEST 2 3 Jun 2022 · Disposed Authority Bench4
- Project delayed causing financial and mental stress 4 Jun 2022 · Disposed Authority
- Refund of Unit booked in Parkwest Maple MA-001, builder collected advance amt under speed payment and failed to honor the handover time 8 Jun 2022 · Disposed Authority Bench4
- delaying completion of MA 702, doubt towards quality construction, 8 Jun 2022 · Disposed Authority Bench4
- Delayed Possession and Compensation 8 Jun 2022 · Disposed Authority
- Exit with full and final settlement with interest 10 Jun 2022 · Disposed Authority
- Delay in completion of the Maple Project 13 Jun 2022 · Disposed Authority
- The Purchasers have been allotted an apartment in the year 2019 and the statutory delivery date was December 30th 2020, but the developer has not handed delivery till now and has not completed 13 Jun 2022 · Disposed Authority Bench4
- Allotted apartment not delivered even after due date expired 2 years ago 13 Jun 2022 · Disposed Authority
- As of now more than 15 months delay in possession and demand for compensation 13 Jun 2022 · Disposed Authority
- Possession is delayed by more than 2 years as of today and the demand for compensation 13 Jun 2022 · Disposed Authority Bench4
- As of now more than 2.5 years delay. We demand early completion, compensation, Enquiry by a commission, audit of their accounts. 14 Jun 2022 · Disposed Authority Fullbench
- Delivery date delayed 14 Jun 2022 · Disposed Authority
- Delivery Date Expired. Project Delayed. 14 Jun 2022 · Disposed Authority Bench4
- Delay in completion of Maple Tower 4 15 Jun 2022 · Disposed Authority Bench4
- Apartment Handover Delayed 15 Jun 2022 · Disposed Authority
- AS OF NOW 2 YEAR 4 MONTH DELAYED IN POSSESSION & DEMAND FOR COMPENSATION 16 Jun 2022 · Disposed Authority
- Delay in Delivery of apartment in the project Parkwest - Maple - Tower 4 Ref : P RM/KA/R E RA/ 1 251 I 31 0 I PR/1 7 I 0 1 5/0 0027 7 16 Jun 2022 · Disposed Authority
- Delay in Project by more than 2.5 Yrs 21 Jun 2022 · Disposed Authority
- POSSESSION AND COMPENSATION 22 Jun 2022 · Disposed Authority Bench4
- Claiming for compensation 22 Jun 2022 · Disposed Authority Bench4
- project delay 22 Jun 2022 · Disposed Authority Bench4
- DELAYED DELIVERY OF FLAT 23 Jun 2022 · Disposed Authority Bench4
- Delay in project delivery as promised in Advertisement and Agreement . 23 Jun 2022 · Disposed Authority Bench4
- Delayed Delivery of the Flat 23 Jun 2022 · Disposed Authority Bench4
- 18 - Return of amount and compensation 23 Jun 2022 · Disposed Authority
- Delay in possession and demand for compensation 23 Jun 2022 · Disposed Authority
- Non Delivery of the Apartment Flat within the date agreed 23 Jun 2022 · Disposed Authority
- Handing over possession with delayed interest 24 Jun 2022 · Disposed Authority
- Handing over possession with delayed interest 24 Jun 2022 · Disposed Authority
- Handing over possession with delayed interest 24 Jun 2022 · Disposed Authority
- As of now more than 2 years delay in possession and demand for compensation 24 Jun 2022 · Disposed Authority
- DELAY IN PROJECT & DEMANDING COMPENSATION 24 Jun 2022 · Disposed Authority
- AS OF NOW, MORE THAN 2 YEARS DELAY IN POSSESION AND DEMAND FOR COMPENSATION 24 Jun 2022 · Disposed Authority
- Handing over possession with delayed interest 25 Jun 2022 · Disposed Authority
- AS OF NOW, MORWE THAN TWO YEARS DELAY IN POSSESSION AND DEMAND FOR COMPENSATION 25 Jun 2022 · Disposed Authority
- Compensation for delay of delivery of Apartment MA 1202 25 Jun 2022 · Disposed Authority
- DELAY MORE THAN THREE YEARS 25 Jun 2022 · Disposed Authority
- As of now, delayed in possession of the flat for more then 2 years and hence demand for Compensation with interest 25 Jun 2022 · Disposed Authority Bench4
- Possession of flat delayed 25 Jun 2022 · Disposed Authority Bench4
- Handing over possession with delayed interest 25 Jun 2022 · Disposed Authority
- Project Delayed by 30 Months 28 Jun 2022 · Disposed Authority Bench4
- Gross Delay in delivery of apartment 29 Jun 2022 · Disposed Authority Bench4
- Delay Compensation for delay in delivery of Apartment 2 Jul 2022 · Disposed Authority Bench4
- Delay in completion 6 Jul 2022 · Disposed Authority
- Delay in Delivery 8 Jul 2022 · Disposed Authority
- Delay in Delivery 13 Jul 2022 · Disposed Authority
- Completion Period per RERA Act is delayed and seeking Compensation for the delay 20 Jul 2022 · Disposed Authority
- Compensation for Delay 21 Jul 2022 · Disposed Authority
- Delayed in completion 25 Jul 2022 · Disposed Authority
- Delay in Delivery seeking interest compensation 25 Jul 2022 · Disposed Authority
- More than Years of delay in possession and demand of compensation 4 Aug 2022 · Disposed Authority Bench4
- REQUEST FOR COMPENSATION 4 Aug 2022 · Disposed Authority Bench4
- DELAY IN POSSESSION 10 Aug 2022 · Disposed Authority
- REQUEST FOR COMPENSATION 10 Aug 2022 · Disposed Authority
- Compensation for Delay in Consturciton as per Agreement 11 Aug 2022 · Disposed Authority
- compensation for delay in handover 11 Aug 2022 · Disposed Authority
- Delay in possession 11 Aug 2022 · Disposed Authority
- non delivery of flat as per comletion date of 30/6/2020 12 Aug 2022 · Disposed Authority Bench4
- Delay in Possession 12 Aug 2022 · Disposed Authority
- As of now more than 2 years delay in possession and demand for compensation 12 Aug 2022 · Disposed Authority
- As of now more than 2 years delay in possession and demand for compensation 12 Aug 2022 · Disposed Authority
- As of now more than 2 years delay in possession and demand for compensation 12 Aug 2022 · Disposed Authority
- DELIVERY DATE DELAYED BEYOND JUNE 2020 13 Aug 2022 · Disposed Authority Bench4
- Property was supposed to be hand handed over by Dec 2020. There is a delay in possession. Hence seeking for compensation and interest 16 Aug 2022 · Disposed Authority Bench4
- Delayed project 18 Aug 2022 · Disposed Authority
- Request for compensation for delay of MAPLE FLAT NO MA2403 20 Aug 2022 · Disposed Authority Bench4
- Compensation for delay in delivery of possession 29 Aug 2022 · Disposed Authority Bench4
- Compensation for delayed delivery 10 Oct 2022 · Disposed Authority
- COMPENSATION FOR DEALYED DELIVERY 10 Oct 2022 · Disposed Authority
- Compensation of Delayed Delivery 10 Oct 2022 · Disposed Authority Bench4
- Compensation For Delayed Delivery 10 Oct 2022 · Disposed Authority Bench4
- Compensation for Delayed Delivery 10 Oct 2022 · Disposed Authority Bench4
- Exit with complete refund of the total amount paid along with delay compensation 13 Oct 2022 · Disposed Authority Bench4
- Delay in delivery of the apartment - Maple C 402. 20 Oct 2022 · Disposed Authority Bench4
- Delay in handing over of property 20 Oct 2022 · Disposed Authority
- Delay in handing over of property 20 Oct 2022 · Disposed Authority
- Compensation of Delayed Delivery 2 Nov 2022 · Disposed Authority Bench4
- delivery date is extended 3 Nov 2022 · Disposed Authority Bench4
- Compensation for Delayed Delivery 3 Nov 2022 · Disposed Authority Bench4
- Compensation For Delayed Delivery 4 Nov 2022 · Disposed Authority
- Delayed in handing over possession 4 Nov 2022 · Disposed Authority
- Delay in delivery of possession 4 Nov 2022 · Disposed Authority
- Delay in handing over of property and seeking compensation for delay in handover of Property 7 Nov 2022 · Disposed Ao
- Delay in handing over of property and seeking compensation for delay in handover of Property 7 Nov 2022 · Disposed Authority
- As of now close to 3 years delay in possession and demand for compensation 7 Nov 2022 · Disposed Authority
- As of now, more than 2 years delay in possession and demand for compensation 9 Nov 2022 · Disposed Authority Bench4
- Compensation For Delayed Delivery 9 Nov 2022 · Disposed Authority Bench4
- Handing over possession with interest on delay. 10 Nov 2022 · Disposed Authority Bench4
- Handing over possession with delayed interest 10 Nov 2022 · Disposed Authority Bench4
- Compensation for the delay as perRera provisions, from the agreement delivery date. 10 Nov 2022 · Disposed Authority
- Compensation of Delayed Delivery 10 Nov 2022 · Disposed Authority
- Seeking interest and compensation for delay in completion of work 12 Nov 2022 · Disposed Authority Bench4
- Compensation for delay in delivery of the flat for approx. 3 years 12 Nov 2022 · Disposed Authority
- Compensation of interest for delayed project for over 3 years and still no sign completion 12 Nov 2022 · Disposed Authority
- DELIVERY DATE EXPIRY 12 Nov 2022 · Disposed Authority
- As of now more than one year delay in possession . Hence builder has to pay compensation 12 Nov 2022 · Disposed Authority
- Demand for compensation as it's been more than 1 year delay since the date of completion and delivery 14 Nov 2022 · Disposed Authority
- Complaint for delayed possession of residential property 15 Nov 2022 · Disposed Authority
- As of now its nearly 4 years delay and demand for compensation from the date of expiry of agreement till the handover ...need compensation with the intrest 16 Nov 2022 · Disposed Authority Bench4
- flat not competed as per the terms of the sale agreement 16 Nov 2022 · Disposed Authority Bench4
- flat not completed as per the terms of the sale agreement 16 Nov 2022 · Disposed Authority Bench4
- Monthly compensation for delayed 16 Nov 2022 · Disposed Authority Bench4
- Compensation for Delay 16 Nov 2022 · Disposed Authority Bench4
- monthly rental 25 Nov 2022 · Disposed Ao
- Seeking Interest and Compensation for Delay in Completion of Work 25 Nov 2022 · Disposed Authority Bench4
- Seeking Compensation for Inordinate Delays in Construction and Handover 30 Nov 2022 · Disposed Authority
- Delay in handing over completed flat to me in Maple block 5 Dec 2022 · Disposed Authority
- Delay in Possession for more than 33 months 7 Dec 2022 · Disposed Authority Bench4
- Delay of Possession since December 2019 and Demand for Compensation 9 Dec 2022 · Disposed Authority
- Delay of Possession since promised date of December 2019 and Demand for Compensation 12 Dec 2022 · Disposed Authority
- REQUEEST FOR COMPENSATION 16 Dec 2022 · Disposed Authority
- Delay of 3 years in possession. As of now more than 3 years delay in possession and demand for compensation 17 Dec 2022 · Disposed Authority
- Compensation for delay in handover and immediate possession of the property 17 Dec 2022 · Disposed Authority
- Delay in handover of property and exceptional loss due to interest on loans taken 20 Dec 2022 · Disposed Authority Bench4
- Compensation for delay on position 26 Dec 2022 · Disposed Authority Bench4
- Delay in Hand over (Occupancy) 28 Dec 2022 · Disposed Authority
- Termination of Agreement for Sale and Construction Agreement, Refund and Compensation 4 Jan 2023 · Disposed Authority Bench4
- Compensation for Delayed Delivery 4 Jan 2023 · Disposed Authority
- A 2 BHK bedroom apartment bearing No. (T4-25-02) known as Maple-C2503, on the Floor 25 of MAPLE Tower, being the Phase 2 Residential Development in project " Park West" 13 Jan 2023 · Disposed Authority Bench4
- Project has been delayed for morethan 3 years. 17 Jan 2023 · Disposed Authority
- Very Long Delay in completion 18 Jan 2023 · Disposed Authority Bench4
- Compensation for the delay as per Rera provisions, from the agreement delivery date. 20 Jan 2023 · Disposed Authority
- DELAY IN COMPLETION AND DELIVERY OF APARTMENT 30 Jan 2023 · Disposed Authority Bench4
- Delayed delivery for Property 31 Jan 2023 · Disposed Authority Bench4
- Credit note for delay in handing over the property 31 Jan 2023 · Disposed Authority
- delay of possession as agreed time of delivery was December 2019 and demand for compensation for the same. 6 Feb 2023 · Disposed Authority
- Compensation for the Delay in handover of the flat 10 Feb 2023 · Disposed Authority Bench4
- Delay in Delivery and Compensation 10 Feb 2023 · Disposed Authority Bench4
- As of now more than 2 years delay in possession and demand for compensation 10 Feb 2023 · Disposed Authority
- DELAY OF COMPENSATION 10 Feb 2023 · Disposed Authority
- Delivery Date Expiry and Breach of Contract 22 Feb 2023 · Disposed Authority Bench4
- Delivery date expired 29 Mar 2023 · Disposed Authority Bench4
- Flat handover delay and compensation therefor. 26 May 2023 · Disposed Authority Bench4
- Respondents to pay the balance amount of Rs. 23,85,860/- with interest and compensation of Rs.50,000/- 30 May 2023 · Disposed Authority Bench4
- COMPENSATION 7 Jun 2023 · Disposed Authority Bench4
- Compensation with interest 17 Jun 2023 · Disposed Authority
- COMPENSATION FOR DELAY IN POSSESSION 28 Jun 2023 · Disposed Authority Bench4
- Delay in handing over possession of the project, not obtained occupancy certificate and interest on delay period 10 Jul 2023 · Disposed Authority Bench4
- Delay in handing over possession of the project, not obtained occupancy certificate and interest on delay period 13 Jul 2023 · Disposed Authority Bench4
- Delay in handing over possession of the project, not obtained occupancy certificate and interest on delay period 17 Jul 2023 · Disposed Authority Bench4
- REFUND OF THE ENTIRE CONSIDERATION AMOUNTS 9 Oct 2023 · Disposed Authority Bench4
- As per the agreement this flat was supposed to be handed over on 30th June 2020 still not given the possession 20 Jan 2024 · Disposed Authority Bench4
- Interest on delay period 22 Jan 2024 · Disposed Authority Bench4
- Delay in project delivery as promised in Advertisement and Agreement. 8 Feb 2024 · Disposed Authority Bench4
- Developer not paying delay compensation as per RERA acts till handover 9 Feb 2024 · Disposed Authority Bench4
- Refund of Rs 1833193 along with interest at 18 percent per annum till realisation 13 Mar 2024 · Disposed Authority Bench4
- Compensation for Delay in Handover 21 Mar 2024 · Disposed Authority Bench4
- INTEREST FOR DELAY IN HANDOVER, FAILURE TO PROVIDE 'NOC' , FAILURE TO ALLOT CAR PARKING & EXECUTION OF SALE DEED 21 Aug 2024 · Disposed Authority Fullbench
- Compensation for rent and mental agony 7 Nov 2024 · Disposed Ao
- Compensation for rent and mental agony 7 Nov 2024 · Disposed Ao
- INTEREST ON DELAY PERIOD NOT PAID 31 Mar 2026 · Posted For Orders Authority Bench4
Documents
106 files on the RERA page: Approved plan ↗, Commencement certificate ↗, Brochure ↗.
CaveatAs filed on RERA Karnataka. Complaints are listed without the names of the people who filed them.
Project cost
- Land
- ₹233.2 cr
- Construction
- ₹303.3 cr
- Total project cost
- ₹536.5 cr
CaveatCost as certified by the builder's chartered accountant at registration.
What's around it?
Open the full location report on the map
Metro, rail, bus, airport
- Nearest operational metro station0.96 kmReliable
- Nearest railway station1.71 kmReliable
- Bus stops within 500 m5Caveat
Parks, shops, daily needs
- Supermarkets within 1 km1Caveat
- Parks within 1 km3Caveat
- Nearest lake / water body (≥2 ha)1.75 kmCaveat
Hospitals
- Nearest hospital0.38 kmCaveat
Schools
- Schools in pincode 560018 (UDISE+ census)58Caveat
- Private (classes 1–10 or 1–12), government and central schools within 1 km41Caveat
- Median pupil-teacher ratio, schools within 1 km22 :1Caveat
- Schools with library + playground + ICT lab (1 km)17Caveat
Police and crime
- Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
- Police station jurisdictionJagajeevanram Nagar PSReliable
Air quality
- PM2.5, recent 24 h avg (nearest CPCB station)11 µg/m³Caveat
Flood and waterlogging
- BBMP-listed flood / low-lying spots within 1 km12Caveat
Water availability
- Groundwater stage (CGWB block assessment)Over ExploitedCaveat
- In an IISc groundwater-critical ward (2025 outlook)yesCaveat
Power reliability
- Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
- Un/partially-electrified layouts within 1 km0Caveat
Landfills, sewage plants, industry, aircraft
- Nearest named landfill / dump site (≥2 ha)12.61 kmReliable
- Nearest sewage treatment plant1.6 kmCaveat
- Industrial zones within 1 km2Caveat
- Nearest airfield runway (any, incl. military)10.6 kmCaveat
- Nearest commercial-airport runway28.43 kmReliable
- Distance to runway approach-path proxy23.98 kmCaveat
Upcoming infrastructure
- Under-construction projects within 3 km (verified)0Reliable
- Earlier-stage projects within 3 km (sanctioned/tendered/observed)2Caveat
ReliableFrom our location report at the builder-entered pin (12.96740, 77.55823), 2026-10-24. Each figure's source and caveat are in the full report.