Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

PARK LANE VILLA

by Carbon Developers Pvt Ltd · 15 homes · 2.97 acres · 15 towers · Bengaluru South

Delivered late Completed: the builder filed for completion on 6 Dec 2019, 711 days after the date it first promised.

Location report

At a glance

Was it on time?Delivered late
Completed late

The builder filed for completion on 6 Dec 2019, 711 days after the date it first promised.

How much is sold?Unknown
Not reported

The builder has not filed bookings on RERA.

How crowded is it?Less crowded
5 homes per acre

Similar projects within 3 km: 73 per acre. 0% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?Unknown
Not stated

The RERA page doesn't say.

What is the builder's record?3 due so far
0% on time

Of its 3 RERA projects in Bengaluru Urban: 0 delivered on time, 3 late (after the date first promised).

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

Was it delivered on time?

  1. Work started10 Aug 2011
  2. Approved by RERA29 Mar 2018
  3. Completion filed6 Dec 2019

    The builder told RERA the project is complete. Ask for the occupancy certificate before moving in.

No quarterly construction update is filed on this project's RERA page.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

What's being built?

4BHK
3,287 sq ft
305 m² carpet · sizes 3,287–6,211 sq ft (1 at this size)
2 parking spaces
8 homes · 100% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Tower 11 floor
Tower 21 floor
Tower 31 floor
Tower 41 floor
Tower 51 floor
Tower 61 floor
Tower 71 floor
Tower 81 floor
Tower 91 floor
Tower 101 floor
Tower 111 floor
Tower 121 floor
Tower 131 floor
Tower 141 floor
Tower 151 floor

Tower 1: 1 home · Tower 2: 1 home · Tower 3: 1 home · Tower 4: 1 home · Tower 5: 1 home · Tower 6: 1 home · Tower 7: 1 home · Tower 8: 1 home · Tower 9: 1 home · Tower 10: 1 home · Tower 11: 1 home · Tower 12: 1 home · Tower 13: 1 home · Tower 14: 1 home · Tower 15: 1 home

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project5
Typical within 3 km (78)73
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project0%
Typical within 3 km (80)56%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
2.97 acres

12,039 m²

Ground covered by buildings
51% of the land

6,171 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 3 RERA projects of Carbon Developers Pvt Ltd on the map

The company

Registered as
Carbon Developers Pvt Ltd
Type
Company
PAN
AADCC1240J

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land
₹9.0 cr
Construction
₹15.0 cr
Total project cost
₹24.0 cr

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station7.71 kmReliable
  • Nearest railway station6.14 kmReliable
  • Bus stops within 500 m1Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km1Caveat
  • Nearest lake / water body (≥2 ha)1.81 kmCaveat

Hospitals

  • Nearest hospital1.45 kmCaveat

Schools

  • Schools in pincode 560077 (UDISE+ census)123Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km4Caveat
  • Schools with library + playground + ICT lab (1 km)4Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionKothanur PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • In an IISc groundwater-critical ward (2025 outlook)yesCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)4.16 kmReliable
  • Nearest sewage treatment plant2.59 kmCaveat
  • Industrial zones within 1 km0Caveat
  • Nearest airfield runway (any, incl. military)6.39 kmCaveat
  • Nearest commercial-airport runway13.93 kmReliable
  • Distance to runway approach-path proxy12.55 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)2Caveat

ReliableFrom our location report at the builder-entered pin (13.06733, 77.65933), 2026-10-24. Each figure's source and caveat are in the full report.