Past due, no completion filed Past its deadline of 14 Jan 2026, and no completion is filed on RERA. Some finished projects never file, so ask the builder for the occupancy certificate.

Location report

At a glance

Is it on schedule?Past due
Past its deadline

The deadline was 14 Jan 2026, and no completion is filed.

How much is sold?23 left
98% booked

1,161 of 1,184 homes, as the builder reported for Q4 2025-26.

How crowded is it?More crowded
133 homes per acre

Similar projects within 3 km: 67 per acre. 83% of the land is left open.

Any complaints?See the list
2 complaints

Complaints to RERA about this project. 19 more about the builder's other projects.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?35 due so far
0% on time

Of its 55 RERA projects in Bengaluru Urban: 0 delivered on time, 23 late (after the date first promised), 12 past due with no completion filed, 18 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started12 Jan 2021
  2. Approved by RERA19 Feb 2021
  3. Deadline14 Jan 2026

    Passed with no completion filed.

How much is built, each quarter

Q3 2025-26100%
Q4 2025-26100%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q4 2025-26

Tower F100%
Tower G100%
Tower H100%
Tower I100%
Tower J100%
Tower K100%
Tower L100%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

1,161 booked23 leftQ4 2025-26

Still available: 11 × 1 BEDROOM + STUDY + 1 TOILET, 11 × 2BHK, 1 × STUDIO.

Booked, by type

1 BEDROOM + STUDY + 1 TOILET269 of 280
2BHK304 of 315
STUDIO UNIT28 of 28
STUDIO560 of 561

Booked, each quarter

Q3 2025-261,161 of 1,184
Q4 2025-261,161 of 1,184

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

STUDIO
318 sq ft
30 m² carpet · sizes 318–344 sq ft (468 at this size)
17 m² land share · 1 parking space
561 homes · 47% of the project
2BHK
638 sq ft
59 m² carpet
36 m² land share · 3 m² balcony/terrace · 1 parking space
315 homes · 27% of the project
1 BEDROOM + STUDY + 1 TOILET
482 sq ft
45 m² carpet
28 m² land share · 3 m² balcony/terrace · 1 parking space
280 homes · 24% of the project
STUDIO UNIT
335 sq ft
31 m² carpet · sizes 323–335 sq ft (14 at this size)
18 m² land share · 1 parking space
28 homes · 2% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Tower F26 floors
Tower G7 floors
Tower H26 floors
Tower I7 floors
Tower J26 floors
Tower K7 floors
Tower L26 floors

Tower F: 219 homes, 2 basements · Tower G: 28 homes, 2 basements · Tower H: 161 homes, 2 basements · Tower I: 48 homes, 2 basements · Tower J: 215 homes, 2 basements · Tower K: 33 homes, 2 basements · Tower L: 480 homes, 2 basements

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project133
Typical within 3 km (1)67
Typical in the city (114)79

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project83%
Typical within 3 km (1)43%
Typical in the city (118)62%

The share of the land not built on, which includes roads.

Land
8.89 acres

35,968 m²

Ground covered by buildings
17% of the land

6,036 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active mixed development projects with a land area on RERA; the comparison is ours.

Who is building it?

All 55 RERA projects of Brigade Group on the map

Complaints to RERA about its other projects

The company

Registered as
Mysore Projects Private Limited
Type
Company
Company number
U70102KA2010PTC054771

CIN or LLPIN, from the Registrar of Companies.

PAN
AAGCM7611Q

The land is owned together with others (a joint development), including Cornerstone Bay East Developers Private Limited.

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land
₹73.6 cr
Construction
₹381.0 cr
Total project cost
₹454.6 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹62.2 cr₹0.0 lakh
Q4 2025-26₹24.2 cr₹0.0 lakh

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station5.38 kmReliable
  • Nearest railway station5.04 kmReliable
  • Bus stops within 500 m2Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km5Caveat
  • Parks within 1 km31Caveat
  • Nearest lake / water body (≥2 ha)1.64 kmCaveat

Hospitals

  • Nearest hospital0.25 kmCaveat

Schools

  • Schools in pincode 560087 (UDISE+ census)55Caveat
  • Median pupil-teacher ratio, schools within 1 km21.1 :1Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionVarthur PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km1Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • Groundwater depth at nearest CGWB well33.1 m below groundCaveat
  • In an IISc groundwater-critical ward (2025 outlook)noCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km14Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)11.18 kmReliable
  • Nearest sewage treatment plant3.16 kmCaveat
  • Industrial zones within 1 km0Caveat
  • Nearest airfield runway (any, incl. military)6.91 kmCaveat
  • Nearest commercial-airport runway28.5 kmReliable
  • Distance to runway approach-path proxy27.43 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)4Caveat

ReliableFrom our location report at the builder-entered pin (12.93213, 77.74487), 2026-10-24. Each figure's source and caveat are in the full report.