RERA project · Residential/Group Housing

ORLEAN

by GLOBAL EDIFICE INFRA · 91 homes · 1.35 acres · 1 tower · Anekal

Upcoming Under construction, due Dec 2027. 98% built with 61% of the time used. 57% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
98% built

Due 31 Dec 2027. 61% of the time from RERA approval to the deadline has passed.

Built98%
Time used61%
How much is sold?39 left
57% booked

52 of 91 homes, as the builder reported for Q2 2026-27.

How crowded is it?About the same
67 homes per acre

Similar projects within 3 km: 73 per acre. 71% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project. 2 more about the builder's other projects.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?1 due so far
0% on time

Of its 4 RERA projects in Bengaluru Urban: 0 delivered on time, 1 late (after the date first promised), 3 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started1 Oct 2024
  2. Approved by RERA7 Dec 2024
  3. Today24 Oct 2026

    61% of the time to the deadline has passed.

  4. If it slips like a typical project1 Oct 2028

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2694%
Q4 2025-2697%
Q1 2026-2798%
Q2 2026-2798%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

52 booked39 leftQ2 2026-27

Still available: 16 × 2 BHK, 23 × 3 BHK.

Booked, by type

2 BHK19 of 35
3 BHK33 of 56

Booked, each quarter

Q3 2025-2644 of 91
Q4 2025-2647 of 91
Q1 2026-2750 of 91
Q2 2026-2752 of 91

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3 BHK
  • 879 sq ft12 homes81.7 m²
  • 840 sq ft6 homes78.0 m²
  • 841 sq ft6 homes78.1 m²
  • 853 sq ft6 homes79.2 m²
  • and 26 homes in other sizes
Typically 63 m² land share · 13 m² balcony/terrace · 1 parking space
56 homes · 62% of the project
2 BHK
  • 721 sq ft18 homes67.0 m²
  • 668 sq ft6 homes62.1 m²
  • 719 sq ft6 homes66.8 m²
  • 690 sq ft4 homes64.1 m²
  • and 1 home in other sizes
Typically 54 m² land share · 10 m² balcony/terrace · 1 parking space
35 homes · 38% of the project

Carpet areas from the builder's flat-by-flat list on RERA, each size as listed with how many homes have it. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

16 floors

1: 91 homes, 24 m tall, 1 basement

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project67
Typical within 3 km (26)73
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project71%
Typical within 3 km (26)58%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
1.35 acres

5,463 m²

Ground covered by buildings
29% of the land

1,584 m²

Floor-area ratio
1.99

Floors built per unit of land: 1.99 m² of floors for each m² of land.

Parking
0.00 per home

0 covered, 0 open

Built-up area, all floors
91,321 sq ft

8,484 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 4 RERA projects of GLOBAL EDIFICE INFRA on the map

Complaints to RERA about its other projects

The company

Registered as
GLOBAL EDIFICE INFRA
Type
Partnership Firm
PAN
AAWFG9665R
GSTIN
29AAWFG9665R1ZS
Website
www.globaledifice.in

Its other registrations on RERA Karnataka

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹2.7 crBuilding and development ₹44.3 crTotal ₹46.9 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹6.6 cr₹6.6 cr
Q4 2025-26₹2.7 cr₹2.7 cr
Q1 2026-27₹2.1 cr₹2.2 cr
Q2 2026-27₹2.0 cr₹2.0 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station2.51 kmReliable
  • Nearest railway station0.37 kmReliable
  • Bus stops within 500 m0Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km0Caveat
  • Nearest lake / water body (≥2 ha)0.98 kmCaveat

Hospitals

  • Nearest hospital0.99 kmCaveat

Schools

  • Schools in pincode 560099 (UDISE+ census)88Caveat
  • Median pupil-teacher ratio, schools within 1 km21.6 :1Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionAttibele PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km1Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)9.37 kmReliable
  • Nearest sewage treatment plant2.3 kmCaveat
  • Industrial zones within 1 km1Caveat
  • Nearest airfield runway (any, incl. military)15.84 kmCaveat
  • Nearest commercial-airport runway41.91 kmReliable
  • Distance to runway approach-path proxy41.28 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)1Caveat

ReliableFrom our location report at the builder-entered pin (12.81035, 77.70955), 2026-10-24. Each figure's source and caveat are in the full report.