OAKSTONE SN CELESTE

by OAKSTONE SN CELESTE · 130 homes · 2.00 acres · 2 towers · Bengaluru South

Upcoming Under construction, due Nov 2029. 75% built with 38% of the time used. 22% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
75% built

Due 30 Nov 2029. 38% of the time from RERA approval to the deadline has passed.

Built75%
Time used38%
How much is sold?101 left
22% booked

29 of 130 homes, as the builder reported for Q2 2026-27.

How crowded is it?Less crowded
65 homes per acre

Similar projects within 3 km: 73 per acre. 71% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?No other record
Only this project

It is the only RERA project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started1 Sep 2024
  2. Approved by RERA13 Dec 2024
  3. Today24 Oct 2026

    38% of the time to the deadline has passed.

  4. If it slips like a typical project1 Sep 2030

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2656%
Q4 2025-2665%
Q1 2026-2770%
Q2 2026-2775%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

A80%
B80%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

29 booked101 leftQ2 2026-27

Still available: 10 × 2 BHK, 91 × 3 BHK.

Booked, by type

2 BHK6 of 16
3 BHK23 of 114

Booked, each quarter

Q3 2025-2617 of 130
Q4 2025-2620 of 130
Q1 2026-2722 of 130
Q2 2026-2729 of 130

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3 BHK
892 sq ft
83 m² carpet · sizes 718–2,204 sq ft (8 at this size)
63 m² land share · 1 parking space
114 homes · 88% of the project
2 BHK
695 sq ft
65 m² carpet · sizes 695–1,100 sq ft (1 at this size)
64 m² land share · 1 parking space
16 homes · 12% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

A3 floors
B3 floors

A: 62 homes, 15 m tall, 1 basement · B: 68 homes, 15 m tall, 1 basement

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project65
Typical within 3 km (50)73
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project71%
Typical within 3 km (50)65%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
2.00 acres

8,093 m²

Ground covered by buildings
29% of the land

2,357 m²

Floor-area ratio
14114.70

Floors built per unit of land: 14114.70 m² of floors for each m² of land.

Parking
2.62 per home

170 covered, 0 open

Built-up area, all floors
2,14,503 sq ft

19,928 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

This is the only project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

The company

Registered as
OAKSTONE SN CELESTE
Type
Proprietorship
PAN
AAHFO5387K
GSTIN
29AAHFO5387K1ZI

Its other registrations on RERA Karnataka

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹61.6 crBuilding and development ₹55.9 crTotal ₹117.5 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹1.9 cr₹1.9 cr
Q4 2025-26₹3.7 cr₹3.7 cr
Q1 2026-27₹1.3 cr₹1.3 cr
Q2 2026-27₹5.0 cr₹5.0 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station0.51 kmReliable
  • Nearest railway station6.87 kmReliable
  • Bus stops within 500 m4Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km5Caveat
  • Nearest lake / water body (≥2 ha)0.55 kmCaveat

Hospitals

  • Nearest hospital0.27 kmCaveat

Schools

  • Schools in pincode 560100 (UDISE+ census)75Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km10Caveat
  • Median pupil-teacher ratio, schools within 1 km26.6 :1Caveat
  • Schools with library + playground + ICT lab (1 km)8Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionparappana AgraharaReliable

Air quality

  • PM2.5, recent 24 h avg (nearest CPCB station)18 µg/m³Caveat

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km1Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • Groundwater depth at nearest CGWB well1 m below groundCaveat
  • In an IISc groundwater-critical ward (2025 outlook)noCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)3.13 kmReliable
  • Nearest sewage treatment plant1.97 kmCaveat
  • Industrial zones within 1 km12Caveat
  • Nearest airfield runway (any, incl. military)8.89 kmCaveat
  • Nearest commercial-airport runway35.7 kmReliable
  • Distance to runway approach-path proxy34.36 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)1Caveat

ReliableFrom our location report at the builder-entered pin (12.86840, 77.65645), 2026-10-24. Each figure's source and caveat are in the full report.