Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

NVG RAKSHAK

by AT HOMES ENTERPRISES · 390 homes · 2.99 acres · 5 towers · Yelahanka

Upcoming Under construction, due Dec 2029. 30% built with 39% of the time used. 58% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
30% built

Due 31 Dec 2029. 39% of the time from RERA approval to the deadline has passed.

Built30%
Time used39%
How much is sold?162 left
58% booked

228 of 390 homes, as the builder reported for Q2 2026-27.

How crowded is it?More crowded
130 homes per acre

Similar projects within 3 km: 71 per acre. 64% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?No other record
Only this project

It is the only RERA project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started21 Jun 2024
  2. Approved by RERA9 Oct 2024
  3. Today24 Oct 2026

    39% of the time to the deadline has passed.

  4. If it slips like a typical project2 Oct 2030

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2625%
Q4 2025-2625%
Q1 2026-2725%
Q2 2026-2730%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

Nvg Rakshak Tower-129%
Nvg Rakshak Tower-229%
Nvg Rakshak Tower-329%
Nvg Rakshak Tower-429%
Nvg Rakshak Tower-529%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

228 booked162 leftQ2 2026-27

Still available: 150 × 3 BHK, 12 × 1 BHK.

Booked, by type

3 BHK110 of 260
1 BHK118 of 130

Booked, each quarter

Q3 2025-26171 of 390
Q4 2025-26199 of 390
Q1 2026-27216 of 390
Q2 2026-27228 of 390

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3 BHK
795 sq ft
74 m² carpet · sizes 709–1,004 sq ft (52 at this size)
36 m² land share · 10 m² balcony/terrace · 1 parking space
260 homes · 67% of the project
1 BHK
257 sq ft
24 m² carpet · sizes 252–396 sq ft (26 at this size)
11 m² land share · 3 m² balcony/terrace · 1 parking space
130 homes · 33% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Nvg Rakshak Tower-113 floors
Nvg Rakshak Tower-213 floors
Nvg Rakshak Tower-313 floors
Nvg Rakshak Tower-413 floors
Nvg Rakshak Tower-513 floors

Nvg Rakshak Tower-1: 52 homes, 44 m tall, 1 basement · Nvg Rakshak Tower-2: 52 homes, 45 m tall, 1 basement · Nvg Rakshak Tower-3: 52 homes, 45 m tall, 1 basement · Nvg Rakshak Tower-4: 52 homes, 45 m tall, 1 basement · Nvg Rakshak Tower-5: 182 homes, 45 m tall, 1 basement

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project130
Typical within 3 km (84)71
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project64%
Typical within 3 km (86)55%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
2.99 acres

12,117 m²

Ground covered by buildings
36% of the land

4,420 m²

Floor-area ratio
3.25

Floors built per unit of land: 3.25 m² of floors for each m² of land.

Parking
1.19 per home

464 covered, 0 open

Built-up area, all floors
5,98,903 sq ft

55,640 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

This is the only project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

The company

Registered as
AT HOMES ENTERPRISES
Type
Partnership Firm
PAN
ACAFA1039R
GSTIN
29ACAFA1039R1Z4

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹8.0 crBuilding and development ₹246.8 crTotal ₹254.8 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹6.8 cr₹3.9 cr
Q4 2025-26₹7.0 cr₹4.1 cr
Q1 2026-27₹7.9 cr₹6.8 cr
Q2 2026-27₹9.7 cr₹6.6 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station8.98 kmReliable
  • Nearest railway station2.53 kmReliable
  • Bus stops within 500 m1Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km1Caveat
  • Parks within 1 km10Caveat
  • Nearest lake / water body (≥2 ha)0.76 kmCaveat

Hospitals

  • Nearest hospital1.2 kmCaveat

Schools

  • Schools in pincode 560064 (UDISE+ census)240Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km4Caveat
  • Schools with library + playground + ICT lab (1 km)2Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionAmruthahally PSReliable

Air quality

  • PM2.5, recent 24 h avg (nearest CPCB station)32 µg/m³Caveat

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • Groundwater depth at nearest CGWB well16.2 m below groundCaveat
  • In an IISc groundwater-critical ward (2025 outlook)yesCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km4Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)5.06 kmReliable
  • Nearest sewage treatment plant1.08 kmCaveat
  • Industrial zones within 1 km0Caveat
  • Nearest airfield runway (any, incl. military)0.86 kmCaveat
  • Nearest commercial-airport runway14.89 kmReliable
  • Distance to runway approach-path proxy10.22 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)1Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)4Caveat

ReliableFrom our location report at the builder-entered pin (13.08514, 77.60348), 2026-10-24. Each figure's source and caveat are in the full report.