RERA project · Mixed Development
Northern Lights by Puravankara KVN
by KVN Property Holdings LLP · 1,225 homes · 9.52 acres · 3 towers · Bengaluru North
Upcoming Under construction, due Dec 2029. 1% built with 16% of the time used. 75% of homes booked.
At a glance
Due 31 Dec 2029. 16% of the time from RERA approval to the deadline has passed.
916 of 1,225 homes, as the builder reported for Q2 2026-27.
Similar projects within 3 km: 166 per acre. 68% of the land is left open.
Complaints to RERA about this project.
No litigation on the land or the project, as the builder declares it to RERA.
Of its 37 RERA projects in Bengaluru Urban: 2 delivered on time, 8 late (after the date first promised), 8 past due with no completion filed, 17 under way.
These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.
When will it be ready?
- Approved by RERA12 Mar 2026
- Work started15 Apr 2026
- Today24 Oct 2026
16% of the time to the deadline has passed.
- Deadline31 Dec 2029
The date it must be complete by.
- If it slips like a typical project2 Oct 2030
35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.
How much is built, each quarter
Built, as the builder reports itTime used by then
When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.
By tower, Q2 2026-27
CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.
How much is sold?
Still available: 115 × 1 BHK, 43 × 2 BHK, 83 × 3 BHK, 14 × 4 BHK, 54 × EWS.
Booked, by type
Booked, each quarter
Booked means sold or reserved, as the builder reports it. It says nothing about prices.
CaveatFrom the builder's quarterly updates to RERA Karnataka.
What's being built?
Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.
Towers
Wing 1: 685 homes, 91 m tall, 1 basement · Wing 2: 270 homes, 99 m tall, 1 basement · Wing 3: 270 homes, 99 m tall, 1 basement
Amenities
- Electricity 2,983 m²
- CCTV Surveillance 65 m²
- Club House 9,696 m²
- Outdoor Sports facility 3,100 m²
- Indoor Sports facility 9,696 m²
- Swimming Pool 2,874 m²
- Gym 8,696 m²
- Parks 9,032 m²
- Power Backup
- Water and Sanitation 4,790 m²
CaveatAs registered by the builder on RERA Karnataka.
How crowded is it?
Homes per acre
Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.
Land left open
The share of the land not built on, which includes roads.
- Land
- 9.52 acres
- Ground covered by buildings
- 32% of the land
- Floor-area ratio
- 3.23
- Parking
- 0.69 per home
- Built-up area, all floors
- 17,22,353 sq ft
38,545 m²
12,231 m²
Floors built per unit of land: 3.23 m² of floors for each m² of land.
841 covered, 0 open
1,60,012 m²
CaveatAs registered on RERA Karnataka. "Typical" is the median of active mixed development projects with a land area on RERA; the comparison is ours.
Who is building it?
All 37 RERA projects of Puravankara on the map
The company
- Registered as
- KVN Property Holdings LLP
- Type
- Partnership Firm
- Company number
- ACN-5553
- PAN
- AAUFK9764H
- GSTIN
- 29AAUFK9764H1ZB
CIN or LLPIN, from the Registrar of Companies.
Its other registrations on RERA Karnataka
- Northern Lights by Puravankara KVN Phase 3 PRM/KA/RERA/1251/309/PR/120326/008525 · approved 12 Mar 2026
- Northern Lights by Puravankara KVN Phase 2 PRM/KA/RERA/1251/309/PR/120326/008524 · approved 12 Mar 2026
CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.
Paperwork and legal
- Registered with RERAPRM/KA/RERA/1251/309/PR/120326/008523 · Approved
- Building plan approvedKIADB - Karnataka Industrial Areas Development Board · DO3-KIADB-00190/25-26/BP · 7 Mar 2026
- Litigation on the landNone declared
- Litigation on the projectNone declared in the Q2 2026-27 update
- Water sourceLocal Authority
Complaints to RERA about this project
None on RERA Karnataka.
Documents
103 files on the RERA page: Approved plan ↗, Commencement certificate ↗.
CaveatAs filed on RERA Karnataka. Complaints are listed without the names of the people who filed them.
Project cost
Money from buyers, each quarter
| Quarter | Collected from buyers | Withdrawn from the project account |
|---|---|---|
| Q4 2025-26 | ₹17.4 cr | ₹12.2 cr |
| Q1 2026-27 | ₹144.7 cr | ₹101.3 cr |
| Q2 2026-27 | ₹84.0 cr | ₹43.1 cr |
Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.
CaveatCost as certified by the builder's chartered accountant at registration.
What's around it?
Open the full location report on the map
Metro, rail, bus, airport
- Nearest operational metro station16.33 kmReliable
- Nearest railway station7.38 kmReliable
- Bus stops within 500 m1Caveat
Parks, shops, daily needs
- Supermarkets within 1 km0Caveat
- Parks within 1 km0Caveat
- Nearest lake / water body (≥2 ha)0.66 kmCaveat
Hospitals
- Nearest hospital1.64 kmCaveat
Schools
- Schools in pincode 562149 (UDISE+ census)74Caveat
Police and crime
- Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
- Police station jurisdictionBagalur PSReliable
Flood and waterlogging
- BBMP-listed flood / low-lying spots within 1 km0Caveat
Water availability
- Groundwater stage (CGWB block assessment)Over ExploitedCaveat
Power reliability
- Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
- Un/partially-electrified layouts within 1 km0Caveat
Landfills, sewage plants, industry, aircraft
- Nearest named landfill / dump site (≥2 ha)1.47 kmReliable
- Nearest sewage treatment plant5.54 kmCaveat
- Industrial zones within 1 km0Caveat
- Nearest airfield runway (any, incl. military)4.7 kmCaveat
- Nearest commercial-airport runway5.91 kmReliable
- Distance to runway approach-path proxy3.86 kmCaveat
Upcoming infrastructure
- Under-construction projects within 3 km (verified)0Reliable
- Earlier-stage projects within 3 km (sanctioned/tendered/observed)0Caveat
ReliableFrom our location report at the builder-entered pin (13.14634, 77.65805), 2026-10-24. Each figure's source and caveat are in the full report.