Neighborhood IntelOpen on the map

RERA project · Mixed Development

Northern Lights by Puravankara KVN Phase 2

by KVN Property Holdings LLP · 1,208 homes · 8.77 acres · 3 towers · Bengaluru North

Upcoming Under construction, due Dec 2030. 1% built with 13% of the time used. 39% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
1% built

Due 31 Dec 2030. 13% of the time from RERA approval to the deadline has passed.

Built1%
Time used13%
How much is sold?742 left
39% booked

466 of 1,208 homes, as the builder reported for Q2 2026-27.

How crowded is it?Less crowded
138 homes per acre

Similar projects within 3 km: 162 per acre. 46% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?18 due so far
11% on time

Of its 37 RERA projects in Bengaluru Urban: 2 delivered on time, 8 late (after the date first promised), 8 past due with no completion filed, 17 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Approved by RERA12 Mar 2026
  2. Work started5 Oct 2026
  3. Today24 Oct 2026

    13% of the time to the deadline has passed.

  4. If it slips like a typical project2 Oct 2031

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q4 2025-260%
Q1 2026-270%
Q2 2026-271%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

Wing 41%
Wing 51%
Tower 81%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

466 booked742 leftQ2 2026-27

Still available: 262 × 2 BHK, 261 × 3 BHK, 14 × 4 BHK, 100 × EWS, 105 × 1 BHK.

Booked, by type

2 BHK268 of 530
3 BHK113 of 374
4 BHK2 of 16
EWS0 of 100
1 BHK83 of 188

Booked, each quarter

Q4 2025-26305 of 1,208
Q1 2026-27327 of 1,208
Q2 2026-27466 of 1,208

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

2 BHK
670 sq ft
62 m² carpet · sizes 670–769 sq ft (257 at this size)
23 m² land share · 34 m² balcony/terrace · 1 parking space
530 homes · 44% of the project
3 BHK
1,061 sq ft
99 m² carpet · sizes 1,003–1,184 sq ft (79 at this size)
33 m² land share · 47 m² balcony/terrace · 1 parking space
374 homes · 31% of the project
1 BHK
408 sq ft
38 m² carpet
12 m² land share · 18 m² balcony/terrace
188 homes · 16% of the project
EWS
75 sq ft
7 m² carpet
2 m² land share · 4 m² balcony/terrace
100 homes · 8% of the project
4 BHK
2,236 sq ft
208 m² carpet · sizes 2,236–2,333 sq ft (4 at this size)
70 m² land share · 110 m² balcony/terrace · 1 parking space
16 homes · 1% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Wing 430 floors
Wing 530 floors
Tower 830 floors

Wing 4: 270 homes, 99 m tall, 1 basement · Wing 5: 270 homes, 99 m tall, 1 basement · Tower 8: 668 homes, 94 m tall, 1 basement

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project138
Typical within 3 km (2)162
Typical in the city (114)79

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project46%
Typical within 3 km (2)70%
Typical in the city (118)63%

The share of the land not built on, which includes roads.

Land
8.77 acres

35,493 m²

Ground covered by buildings
54% of the land

19,166 m²

Floor-area ratio
3.23

Floors built per unit of land: 3.23 m² of floors for each m² of land.

Parking
1.48 per home

1,778 covered, 15 open

Built-up area, all floors
20,78,240 sq ft

1,93,075 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active mixed development projects with a land area on RERA; the comparison is ours.

Who is building it?

All 37 RERA projects of Puravankara on the map

The company

Registered as
KVN Property Holdings LLP
Type
Partnership Firm
Company number
ACN-5553

CIN or LLPIN, from the Registrar of Companies.

PAN
AAUFK9764H
GSTIN
29AAUFK9764H1ZB

Its other registrations on RERA Karnataka

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹92.7 crBuilding and development ₹754.2 crTotal ₹846.9 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q4 2025-26₹9.6 cr₹6.7 cr
Q1 2026-27₹61.3 cr₹42.9 cr
Q2 2026-27₹35.1 cr₹24.5 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station16.33 kmReliable
  • Nearest railway station7.38 kmReliable
  • Bus stops within 500 m1Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km0Caveat
  • Nearest lake / water body (≥2 ha)0.66 kmCaveat

Hospitals

  • Nearest hospital1.64 kmCaveat

Schools

  • Schools in pincode 562149 (UDISE+ census)74Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionBagalur PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)1.47 kmReliable
  • Nearest sewage treatment plant5.54 kmCaveat
  • Industrial zones within 1 km0Caveat
  • Nearest airfield runway (any, incl. military)4.7 kmCaveat
  • Nearest commercial-airport runway5.91 kmReliable
  • Distance to runway approach-path proxy3.86 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)0Caveat

ReliableFrom our location report at the builder-entered pin (13.14634, 77.65805), 2026-10-24. Each figure's source and caveat are in the full report.