Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

NEON

by MODERN PROJECTS · 292 homes · 4.19 acres · 3 towers · Anekal

Upcoming Under construction, due Dec 2030. 23% built with 24% of the time used. 42% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
23% built

Due 31 Dec 2030. 24% of the time from RERA approval to the deadline has passed.

Built23%
Time used24%
How much is sold?170 left
42% booked

122 of 292 homes, as the builder reported for Q2 2026-27.

How crowded is it?About the same
70 homes per acre

Similar projects within 3 km: 71 per acre. 82% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?Too early to tell
No deliveries yet

None of its 2 RERA projects in Bengaluru Urban has reached its deadline yet.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started1 Jul 2025
  2. Approved by RERA5 Jul 2025
  3. Today24 Oct 2026

    24% of the time to the deadline has passed.

  4. If it slips like a typical project2 Oct 2031

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2612%
Q4 2025-2617%
Q1 2026-2722%
Q2 2026-2723%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

Tower A18%
Tower B15%
Tower C18%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

122 booked170 leftQ2 2026-27

Still available: 30 × 2 BHK, 81 × 3 BHK-TYPE 01, 6 × 3 BHK-TYPE 01G, 26 × 3 BHK-TYPE 02, 27 × 3 BHK-TYPE 03.

Booked, by type

2 BHK50 of 80
3 BHK-TYPE 0139 of 120
3 BHK-TYPE 01G0 of 6
3 BHK-TYPE 0217 of 43
3 BHK-TYPE 0316 of 43

Booked, each quarter

Q3 2025-264 of 197
Q4 2025-2614 of 292
Q1 2026-2775 of 292
Q2 2026-27122 of 292

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3 BHK-TYPE 01
  • 1,150 sq ft120 homes106.8 m²
Typically 46 m² land share · 20 m² balcony/terrace · 1 parking space
120 homes · 41% of the project
2 BHK
  • 805 sq ft80 homes74.8 m²
Typically 33 m² land share · 14 m² balcony/terrace · 1 parking space
80 homes · 27% of the project
3 BHK-TYPE 03
  • 1,044 sq ft43 homes97.0 m²
Typically 42 m² land share · 18 m² balcony/terrace · 1 parking space
43 homes · 15% of the project
3 BHK-TYPE 02
  • 1,019 sq ft43 homes94.7 m²
Typically 42 m² land share · 18 m² balcony/terrace · 1 parking space
43 homes · 15% of the project
3 BHK-TYPE 01G
  • 1,150 sq ft6 homes106.8 m²
Typically 46 m² land share · 17 m² balcony/terrace · 1 parking space
6 homes · 2% of the project

Carpet areas from the builder's flat-by-flat list on RERA, each size as listed with how many homes have it. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Tower A14 floors
Tower B13 floors
Tower C13 floors

Tower A: 102 homes, 45 m tall, 2 basements · Tower B: 95 homes, 42 m tall, 2 basements · Tower C: 95 homes, 42 m tall, 2 basements

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project70
Typical within 3 km (31)71
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project82%
Typical within 3 km (31)58%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
4.19 acres

16,945 m²

Ground covered by buildings
18% of the land

2,972 m²

Floor-area ratio
2.49

Floors built per unit of land: 2.49 m² of floors for each m² of land.

Parking
1.10 per home

305 covered, 16 open

Built-up area, all floors
5,96,105 sq ft

55,380 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 2 RERA projects of MODERN PROJECTS on the map

The company

Registered as
MODERN PROJECTS
Type
Partnership Firm
PAN
ABVFM5716H
GSTIN
29ABVFM5716H1ZM
Website
www.modernspaaces.com

Its other registrations on RERA Karnataka

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹8.7 crBuilding and development ₹154.0 crTotal ₹162.7 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹38.5 lakh₹25.7 lakh
Q4 2025-26₹3.5 cr₹2.4 cr
Q1 2026-27₹9.1 cr₹6.4 cr
Q2 2026-27₹23.9 cr₹17.5 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station13.87 kmReliable
  • Nearest railway station11.52 kmReliable
  • Bus stops within 500 m0Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km0Caveat
  • Nearest lake / water body (≥2 ha)0.74 kmCaveat

Hospitals

  • Nearest hospital1.98 kmCaveat

Schools

  • Schools in pincode 562125 (UDISE+ census)91Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionSarjapura PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)17.2 kmReliable
  • Nearest sewage treatment plant8.21 kmCaveat
  • Industrial zones within 1 km0Caveat
  • Nearest airfield runway (any, incl. military)13.77 kmCaveat
  • Nearest commercial-airport runway36.27 kmReliable
  • Distance to runway approach-path proxy33.7 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)0Caveat

ReliableFrom our location report at the builder-entered pin (12.87036, 77.80515), 2026-10-24. Each figure's source and caveat are in the full report.