RERA project · Residential/Group Housing
NEELADRI SAROVARAM
by NEELADRI PROPERTIES · 321 homes · 3.20 acres · 2 towers · Bengaluru East
Upcoming Under construction, due Oct 2026.
At a glance
100% of the time has passed. No construction update is filed.
The builder has not filed bookings on RERA.
Similar projects within 3 km: 80 per acre. 52% of the land is left open.
Complaints to RERA about this project.
No litigation on the land or the project, as the builder declares it to RERA.
Of its 2 RERA projects in Bengaluru Urban: 0 delivered on time, 1 late (after the date first promised), 1 under way.
These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.
When will it be ready?
- Work started18 Nov 2021
- Approved by RERA25 Feb 2022
- Today24 Oct 2026
100% of the time to the deadline has passed.
- Deadline31 Oct 2026
The date it must be complete by.
- If it slips like a typical project2 Aug 2027
35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.
No quarterly construction update is filed on this project's RERA page.
CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.
What's being built?
Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.
Towers
A Block: 163 homes, 15 m tall, 1 basement · B Block: 158 homes, 15 m tall, 2 basements
Amenities
- Electricity 140 m²
- CCTV Surveillance 12 m²
- Community Hall 65 m²
- Swimming Pool 180 m²
- Gym 30 m²
- Power Backup 2 m²
CaveatAs registered by the builder on RERA Karnataka.
How crowded is it?
Homes per acre
Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.
Land left open
The share of the land not built on, which includes roads.
- Land
- 3.20 acres
- Ground covered by buildings
- 48% of the land
- Floor-area ratio
- 28696.70
- Parking
- 1.11 per home
- Built-up area, all floors
- 4,97,292 sq ft
12,953 m²
6,205 m²
Floors built per unit of land: 28696.70 m² of floors for each m² of land.
356 covered, 0 open
46,200 m²
CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.
Who is building it?
All 2 RERA projects of Neeladri Properties on the map
The company
- Registered as
- NEELADRI PROPERTIES
- Type
- Partnership Firm
- PAN
- AAIFN8689E
- GSTIN
- 29AAIFN8689E1ZK
Its other registrations on RERA Karnataka
- Neeladri Kota Hills PRM/KA/RERA/1251/310/PR/180120/002173 · approved 20 Jan 2018
CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.
Paperwork and legal
- Registered with RERAPRM/KA/RERA/1251/446/PR/250222/004732 · Approved
- Building plan approvedBBMP - Bruhat Bengaluru Mahanagara Palike · LP number BBMP/Addl.Dir/JD NORTH/0040/20-21 · 18 Nov 2021
- Litigation on the landNone declared
- Litigation on the projectNot stated
- Water sourceBoreWell,BWSSB
Complaints to RERA about this project
None on RERA Karnataka.
Documents
141 files on the RERA page: Approved plan ↗, Commencement certificate ↗, Brochure ↗.
CaveatAs filed on RERA Karnataka. Complaints are listed without the names of the people who filed them.
Project cost
CaveatCost as certified by the builder's chartered accountant at registration.
What's around it?
Open the full location report on the map
Metro, rail, bus, airport
- Nearest operational metro station4.37 kmReliable
- Nearest railway station5.12 kmReliable
- Bus stops within 500 m0Caveat
Parks, shops, daily needs
- Supermarkets within 1 km2Caveat
- Parks within 1 km21Caveat
- Nearest lake / water body (≥2 ha)1.06 kmCaveat
Hospitals
- Nearest hospital0.79 kmCaveat
Schools
- Schools in pincode 560087 (UDISE+ census)55Caveat
- Private (classes 1–10 or 1–12), government and central schools within 1 km8Caveat
- Median pupil-teacher ratio, schools within 1 km21.1 :1Caveat
- Schools with library + playground + ICT lab (1 km)6Caveat
Police and crime
- Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
- Police station jurisdictionVarthur PSReliable
Flood and waterlogging
- BBMP-listed flood / low-lying spots within 1 km1Caveat
Water availability
- Groundwater stage (CGWB block assessment)Over ExploitedCaveat
- Groundwater depth at nearest CGWB well33.1 m below groundCaveat
- In an IISc groundwater-critical ward (2025 outlook)noCaveat
Power reliability
- Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
- Un/partially-electrified layouts within 1 km11Caveat
Landfills, sewage plants, industry, aircraft
- Nearest named landfill / dump site (≥2 ha)10.99 kmReliable
- Nearest sewage treatment plant2.45 kmCaveat
- Industrial zones within 1 km0Caveat
- Nearest airfield runway (any, incl. military)6.12 kmCaveat
- Nearest commercial-airport runway27.62 kmReliable
- Distance to runway approach-path proxy26.67 kmCaveat
Upcoming infrastructure
- Under-construction projects within 3 km (verified)0Reliable
- Earlier-stage projects within 3 km (sanctioned/tendered/observed)4Caveat
ReliableFrom our location report at the builder-entered pin (12.93982, 77.73949), 2026-10-24. Each figure's source and caveat are in the full report.