Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

NCC URBAN RETREAT

by NCC URBAN INFRASTRUCTURE LIMITED · 50 homes · 3.56 acres · 4 towers · Bengaluru East

Upcoming Under construction, due Jun 2028. 45% built with 51% of the time used. 16% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
45% built

Due 30 Jun 2028. 51% of the time from RERA approval to the deadline has passed.

Built45%
Time used51%
How much is sold?43 left
16% booked

8 of 51 homes, as the builder reported for Q2 2026-27.

How crowded is it?Less crowded
14 homes per acre

Similar projects within 3 km: 73 per acre. 77% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?Litigation
Declared

The builder declares litigation on the land or the project.

What is the builder's record?4 due so far
75% on time

Of its 7 RERA projects in Bengaluru Urban: 3 delivered on time, 1 late (after the date first promised), 3 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started15 Nov 2024
  2. Approved by RERA30 Jan 2025
  3. Today24 Oct 2026

    51% of the time to the deadline has passed.

  4. If it slips like a typical project1 Apr 2029

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2623%
Q4 2025-2639%
Q1 2026-2740%
Q2 2026-2745%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

A40%
B35%
C30%
D25%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

8 booked43 leftQ2 2026-27

Still available: 33 × Row House - 3 BHK along with Multipurpose Hall & Servant Room, 10 × Row House - 4 BHK along with Multipurpose Hall & Servant Room.

Booked, by type

Row House - 3 BHK along with Multipurpose Hall & Servant Room5 of 38
Row House - 4 BHK along with Multipurpose Hall & Servant Room2 of 12
NA1 of 1

Booked, each quarter

Q3 2025-265 of 51
Q4 2025-266 of 51
Q1 2026-277 of 51
Q2 2026-278 of 51

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

Row House - 3 BHK along with Multipurpose Hall & Servant Room
2,658 sq ft
247 m² carpet · sizes 2,638–3,218 sq ft (6 at this size)
265 m² land share · 2 parking spaces
38 homes · 75% of the project
Row House - 4 BHK along with Multipurpose Hall & Servant Room
3,198 sq ft
297 m² carpet · sizes 3,186–3,333 sq ft (4 at this size)
292 m² land share · 2 parking spaces
12 homes · 24% of the project
NA
11,751 sq ft
1,092 m² carpet
808 m² land share · 11 parking spaces
1 home · 2% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

A3 floors
B3 floors
C3 floors
D2 floors

A: 19 homes, 15 m tall · B: 14 homes, 15 m tall · C: 17 homes, 15 m tall · D: 1 home, 15 m tall

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project14
Typical within 3 km (87)73
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project77%
Typical within 3 km (89)54%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
3.56 acres

14,400 m²

Ground covered by buildings
23% of the land

3,256 m²

Floor-area ratio
1.12

Floors built per unit of land: 1.12 m² of floors for each m² of land.

Parking
4.44 per home

100 covered, 11 open

Built-up area, all floors
1,97,388 sq ft

18,338 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 7 RERA projects of NCC URBAN INFRASTRUCTURE LIMITED on the map

The company

Registered as
NCC URBAN INFRASTRUCTURE LIMITED
Type
Company
PAN
AACCN2301G
GSTIN
29AACCN2301G1ZV
Website
www.nccurban.com

Its other registrations on RERA Karnataka

7 registrations under this company
  • NCC URBAN GREEN PROVINCE PHASE 2 PRM/KA/RERA/1251/308/PR/020126/008375 · approved 2 Jan 2026
  • NCC Urban Lake Springs PRM/KA/RERA/1251/310/PR/221024/007161 · approved 22 Oct 2024
  • NCC Urban Green Province One PRM/KA/RERA/1251/308/PR/160623/005999 · approved 16 Jun 2023
  • NCC Urban Park View PRM/KA/RERA/1251/309/PR/110722/005050 · approved 11 Jul 2022
  • NCC URBAN MAYFAIR PRM/KA/RERA/1251/309/PR/180627/001926 · approved 27 Jun 2018
  • NCC URBAN GREEN PROVINCE PRM/KA/RERA/1250/304/PR/171031/001370 · approved 31 Oct 2017
  • NCC URBAN MISTY WOODS PRM/KA/RERA/1251/309/PR/171031/001369 · approved 31 Oct 2017

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹19.4 crBuilding and development ₹56.3 crTotal ₹75.7 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹3.4 cr₹3.1 cr
Q4 2025-26₹2.1 cr₹2.3 cr
Q1 2026-27₹6.4 cr₹1.6 cr
Q2 2026-27₹2.5 cr₹2.6 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station7.11 kmReliable
  • Nearest railway station5.45 kmReliable
  • Bus stops within 500 m1Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km1Caveat
  • Parks within 1 km2Caveat
  • Nearest lake / water body (≥2 ha)1.52 kmCaveat

Hospitals

  • Nearest hospital0.79 kmCaveat

Schools

  • Schools in pincode 560077 (UDISE+ census)123Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km6Caveat
  • Median pupil-teacher ratio, schools within 1 km25.5 :1Caveat
  • Schools with library + playground + ICT lab (1 km)2Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionKothanur PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • In an IISc groundwater-critical ward (2025 outlook)yesCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)4.77 kmReliable
  • Nearest sewage treatment plant1.97 kmCaveat
  • Industrial zones within 1 km0Caveat
  • Nearest airfield runway (any, incl. military)6.27 kmCaveat
  • Nearest commercial-airport runway14.7 kmReliable
  • Distance to runway approach-path proxy13.24 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)2Caveat

ReliableFrom our location report at the builder-entered pin (13.06082, 77.65658), 2026-10-24. Each figure's source and caveat are in the full report.