Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

NCC Urban Lake Springs

by NCC URBAN INFRASTRUCTURE LIMITED · 272 homes · 4.41 acres · 4 towers · Bengaluru South

Upcoming Under construction, due Jun 2028. 67% built with 54% of the time used. 46% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
67% built

Due 28 Jun 2028. 54% of the time from RERA approval to the deadline has passed.

Built67%
Time used54%
How much is sold?147 left
46% booked

125 of 272 homes, as the builder reported for Q2 2026-27.

How crowded is it?Less crowded
62 homes per acre

Similar projects within 3 km: 78 per acre. 70% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?Litigation
Declared

The builder declares litigation on the land or the project.

What is the builder's record?4 due so far
75% on time

Of its 7 RERA projects in Bengaluru Urban: 3 delivered on time, 1 late (after the date first promised), 3 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started1 Jul 2024
  2. Approved by RERA22 Oct 2024
  3. Today24 Oct 2026

    54% of the time to the deadline has passed.

  4. If it slips like a typical project30 Mar 2029

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2638%
Q4 2025-2647%
Q1 2026-2755%
Q2 2026-2767%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

A55%
B50%
C60%
D60%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

125 booked147 leftQ2 2026-27

Still available: 25 × 2.5 BHK, 78 × 3 BHK, 44 × 3.5 BHK.

Booked, by type

2.5 BHK43 of 68
3 BHK58 of 136
3.5 BHK24 of 68

Booked, each quarter

Q3 2025-26111 of 272
Q4 2025-26116 of 272
Q1 2026-27123 of 272
Q2 2026-27125 of 272

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3 BHK
1,353 sq ft
126 m² carpet · sizes 1,211–1,353 sq ft (68 at this size)
47 m² land share · 1 parking space
136 homes · 50% of the project
3.5 BHK
1,385 sq ft
129 m² carpet
50 m² land share · 1 parking space
68 homes · 25% of the project
2.5 BHK
996 sq ft
92 m² carpet
36 m² land share · 1 parking space
68 homes · 25% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

A17 floors
B17 floors
C17 floors
D17 floors

A: 68 homes, 56 m tall, 1 basement · B: 68 homes, 56 m tall, 1 basement · C: 68 homes, 56 m tall, 2 basements · D: 68 homes, 56 m tall, 2 basements

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project62
Typical within 3 km (65)78
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project70%
Typical within 3 km (65)54%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
4.41 acres

17,844 m²

Ground covered by buildings
30% of the land

5,418 m²

Floor-area ratio
2.50

Floors built per unit of land: 2.50 m² of floors for each m² of land.

Parking
1.00 per home

214 covered, 58 open

Built-up area, all floors
7,20,966 sq ft

66,980 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 7 RERA projects of NCC URBAN INFRASTRUCTURE LIMITED on the map

The company

Registered as
NCC URBAN INFRASTRUCTURE LIMITED
Type
Company
PAN
AACCN2301G
GSTIN
29AACCN2301G1ZV
Website
WWW.NCCURBAN.COM

Its other registrations on RERA Karnataka

7 registrations under this company
  • NCC URBAN GREEN PROVINCE PHASE 2 PRM/KA/RERA/1251/308/PR/020126/008375 · approved 2 Jan 2026
  • NCC URBAN RETREAT PRM/KA/RERA/1251/446/PR/300125/007457 · approved 30 Jan 2025
  • NCC Urban Green Province One PRM/KA/RERA/1251/308/PR/160623/005999 · approved 16 Jun 2023
  • NCC Urban Park View PRM/KA/RERA/1251/309/PR/110722/005050 · approved 11 Jul 2022
  • NCC URBAN MAYFAIR PRM/KA/RERA/1251/309/PR/180627/001926 · approved 27 Jun 2018
  • NCC URBAN GREEN PROVINCE PRM/KA/RERA/1250/304/PR/171031/001370 · approved 31 Oct 2017
  • NCC URBAN MISTY WOODS PRM/KA/RERA/1251/309/PR/171031/001369 · approved 31 Oct 2017

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹65.0 crBuilding and development ₹135.5 crTotal ₹202.1 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹31.5 cr₹31.8 cr
Q4 2025-26₹32.1 cr₹42.4 cr
Q1 2026-27₹20.8 cr₹23.1 cr
Q2 2026-27₹20.2 cr₹20.5 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station2.4 kmReliable
  • Nearest railway station9.54 kmReliable
  • Bus stops within 500 m4Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km2Caveat
  • Parks within 1 km3Caveat
  • Nearest lake / water body (≥2 ha)0.23 kmCaveat

Hospitals

  • Nearest hospital1.95 kmCaveat

Schools

  • Schools in pincode 560062 (UDISE+ census)66Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km9Caveat
  • Median pupil-teacher ratio, schools within 1 km21.7 :1Caveat
  • Schools with library + playground + ICT lab (1 km)5Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionThalaghattapura PSReliable

Air quality

  • PM2.5, recent 24 h avg (nearest CPCB station)26 µg/m³Caveat

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • Groundwater depth at nearest CGWB well10.8 m below groundCaveat
  • In an IISc groundwater-critical ward (2025 outlook)noCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km2Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)5.31 kmReliable
  • Nearest sewage treatment plant3.11 kmCaveat
  • Industrial zones within 1 km2Caveat
  • Nearest airfield runway (any, incl. military)13.28 kmCaveat
  • Nearest commercial-airport runway38.22 kmReliable
  • Distance to runway approach-path proxy34.74 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)1Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)0Caveat

ReliableFrom our location report at the builder-entered pin (12.86648, 77.56495), 2026-10-24. Each figure's source and caveat are in the full report.