RERA project · Residential/Group Housing

Nandi Brindavan

by NANDI DEVELOPERS · 76 homes · 1.10 acres · 1 tower · Bengaluru South

Upcoming Under construction, due Mar 2027, after an extension. 80% built with 91% of the time used. 30% of homes booked.

Location report

At a glance

Is it on schedule?Deadline extended
80% built

Due 1 Mar 2027. 91% of the time from RERA approval to the deadline has passed.

Built80%
Time used91%
How much is sold?53 left
30% booked

23 of 76 homes, as the builder reported for Q2 2026-27.

How crowded is it?Less crowded
69 homes per acre

Similar projects within 3 km: 78 per acre. 50% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project. 17 more about the builder's other projects.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?1 due so far
0% on time

Of its 2 RERA projects in Bengaluru Urban: 0 delivered on time, 1 late (after the date first promised), 1 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started1 Aug 2022
  2. Approved by RERA8 Feb 2023
  3. First promised1 Mar 2026

    The date the builder gave at registration.

  4. Today24 Oct 2026

    91% of the time to the deadline has passed.

  5. If it slips like a typical project1 Dec 2027

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2670%
Q4 2025-2680%
Q1 2026-2762%
Q2 2026-2780%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

23 booked53 leftQ2 2026-27

Still available: 53 × 3 BHK.

Booked, by type

3 BHK23 of 76

Booked, each quarter

Q3 2025-2617 of 76
Q4 2025-2621 of 76
Q1 2026-2723 of 76
Q2 2026-2723 of 76

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3 BHK
850 sq ft
79 m² carpet · sizes 803–1,385 sq ft (4 at this size)
6 m² land share · 6 m² balcony/terrace · 1 parking space
76 homes · 100% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Nandi Brindavan3 floors

Nandi Brindavan: 76 homes, 2 m tall, 1 basement

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project69
Typical within 3 km (51)78
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project50%
Typical within 3 km (52)51%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
1.10 acres

4,440 m²

Ground covered by buildings
50% of the land

2,220 m²

Floor-area ratio
2.25

Floors built per unit of land: 2.25 m² of floors for each m² of land.

Parking
2.00 per home

76 covered, 76 open

Built-up area, all floors
1,22,816 sq ft

11,410 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 2 RERA projects of NANDI DEVELOPERS on the map

Complaints to RERA about its other projects

The company

Registered as
NANDI DEVELOPERS
Type
Partnership Firm
PAN
AAKFN8632P
GSTIN
29AAKFN8632P1ZC

Its other registrations on RERA Karnataka

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹17.5 crBuilding and development ₹33.4 crTotal ₹50.9 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹7.3 cr₹4.7 cr
Q4 2025-26₹2.4 cr₹75.0 lakh
Q1 2026-27₹10.4 cr₹9.3 cr
Q2 2026-27₹13.3 cr₹12.6 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station2.61 kmReliable
  • Nearest railway station4.69 kmReliable
  • Bus stops within 500 m7Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km8Caveat
  • Parks within 1 km6Caveat
  • Nearest lake / water body (≥2 ha)0.65 kmCaveat

Hospitals

  • Nearest hospital0.19 kmCaveat

Schools

  • Schools in pincode 560061 (UDISE+ census)55Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km23Caveat
  • Median pupil-teacher ratio, schools within 1 km19.4 :1Caveat
  • Schools with library + playground + ICT lab (1 km)13Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionSubramanyapura PSReliable

Air quality

  • PM2.5, recent 24 h avg (nearest CPCB station)29 µg/m³Caveat

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km2Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • In an IISc groundwater-critical ward (2025 outlook)noCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)10.21 kmReliable
  • Nearest sewage treatment plant0.59 kmCaveat
  • Industrial zones within 1 km2Caveat
  • Nearest airfield runway (any, incl. military)12.4 kmCaveat
  • Nearest commercial-airport runway34.77 kmReliable
  • Distance to runway approach-path proxy30.64 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)1Caveat

ReliableFrom our location report at the builder-entered pin (12.90777, 77.54771), 2026-10-24. Each figure's source and caveat are in the full report.