Nambiar District 25 Phase 3
by Nambiar EnsembleResidential Projects LLP · 1,202 homes · 11.51 acres · 8 towers · Anekal
Upcoming Under construction, due Feb 2032. 0% built with 7% of the time used. 27% of homes booked.
At a glance
Due 29 Feb 2032. 7% of the time from RERA approval to the deadline has passed.
327 of 1,202 homes, as the builder reported for Q2 2026-27.
Similar projects within 3 km: 70 per acre. 18% of the land is left open.
Complaints to RERA about this project. 2 more about the builder's other projects.
No litigation on the land or the project, as the builder declares it to RERA.
None of its 3 RERA projects in Bengaluru Urban has reached its deadline yet.
These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.
When will it be ready?
- Approved by RERA26 May 2026
- Work started15 Jul 2026
- Today24 Oct 2026
7% of the time to the deadline has passed.
- Deadline29 Feb 2032
The date it must be complete by.
- If it slips like a typical project30 Nov 2032
35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.
How much is built, each quarter
Built, as the builder reports itTime used by then
When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.
By tower, Q2 2026-27
CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.
How much is sold?
Still available: 34 × 2B2T 01, 1 × 2B2T 02, 1 × 2B2T 03, 37 × 3B3T L 01, 17 × 3B3T R 01, 16 × 2B2T -01, 1 × 2B2T -02, 1 × 2B2T -03, 34 × 3B3T L-01, 6 × 3B3T R -01, 108 × 2B2T 04, 8 × 2B2T 05, 123 × 3B2T, 126 × 3B3T L 02, 8 × 3B3T L 03, 107 × 4B4T, 4 × 2B2T 06, 12 × 2B2T 07, 41 × 3B3T R 02, 133 × 3B3T R 03, 4 × 3B4T SR, 53 × 4B5T.
Booked, by type
Booked, each quarter
Booked means sold or reserved, as the builder reports it. It says nothing about prices.
CaveatFrom the builder's quarterly updates to RERA Karnataka.
What's being built?
- 1,079 sq ft156 homes100.2 m²
- 1,932 sq ft148 homes179.5 m²
- 1,493 sq ft148 homes138.7 m²
- 1,201 sq ft142 homes111.6 m²
- 883 sq ft140 homes82.0 m²
- 2,181 sq ft74 homes202.6 m²
- 1,265 sq ft74 homes117.5 m²
- 1,499 sq ft71 homes139.3 m²
- 1,499 sq ft71 homes139.3 m²
- 1,203 sq ft35 homes111.8 m²
- 1,203 sq ft35 homes111.8 m²
- 904 sq ft34 homes84.0 m²
- 904 sq ft34 homes84.0 m²
- 992 sq ft12 homes92.2 m²
- 1,711 sq ft8 homes159.0 m²
- 1,256 sq ft8 homes116.7 m²
- 1,894 sq ft4 homes176.0 m²
- 1,001 sq ft4 homes93.0 m²
- 1,304 sq ft1 home121.1 m²
- 996 sq ft1 home92.5 m²
- 996 sq ft1 home92.5 m²
- 1,304 sq ft1 home121.1 m²
Carpet areas from the builder's flat-by-flat list on RERA, each size as listed with how many homes have it. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.
Towers
Tower -13: 142 homes, 114 m tall, 3 basements · Tower -14: 142 homes, 114 m tall, 3 basements · Tower-15: 152 homes, 120 m tall, 3 basements · Tower-16: 152 homes, 120 m tall, 3 basements · Tower-17: 152 homes, 120 m tall, 3 basements · Tower-18: 152 homes, 120 m tall, 3 basements · Tower-19: 155 homes, 120 m tall, 3 basements · Tower-20: 155 homes, 120 m tall, 3 basements
Amenities
- Electricity 396 m²
- CCTV Surveillance 48 m²
- Outdoor Sports facility 1,805 m²
- Swimming Pool 200 m²
- Parks 11,200 m²
- Power Backup 304 m²
- Water and Sanitation 1,760 m²
CaveatAs registered by the builder on RERA Karnataka.
How crowded is it?
Homes per acre
Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.
Land left open
The share of the land not built on, which includes roads.
- Land
- 11.51 acres
- Ground covered by buildings
- 82% of the land
- Floor-area ratio
- 1,95,266.00
- Parking
- 1.51 per home
- Built-up area, all floors
- 31,87,385 sq ft
46,569 m²
38,115 m²
Floors built per unit of land: 1,95,266.00 m² of floors for each m² of land.
1,723 covered, 95 open
2,96,118 m²
CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.
Who is building it?
All 3 RERA projects of Nambiar EnsembleResidential Projects LLP on the map
Complaints to RERA about its other projects
- Nambiar District 25 Phase 2 2 complaints
The company
- Registered as
- Nambiar EnsembleResidential Projects LLP
- Type
- Partnership Firm
- Company number
- ACD-9470
- PAN
- AAJFE5673N
- GSTIN
- 29AAJFE5673N1ZN
- Website
- https://nambiarbuilders.com/
CIN or LLPIN, from the Registrar of Companies.
Its other registrations on RERA Karnataka
- Nambiar District 25 Phase 2 PRM/KA/RERA/1251/308/PR/200825/008011 · approved 20 Aug 2025
- Nambiar District 25 Phase 1 PRM/KA/RERA/1251/308/PR/100125/007377 · approved 10 Jan 2025
The land is owned together with others (a joint development), including Nambiar EnsembleCommercial Projects LLP.
CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.
Paperwork and legal
- Registered with RERAPRM/KA/RERA/1251/308/PR/260526/008686 · Approved
- Building plan approvedBDA - Bangalore Development Authority · BDA/NM/AS/AA-5/TS-2/E/09/2026-27 · 15 May 2026
- Litigation on the landNone declared
- Litigation on the projectNone declared in the Q2 2026-27 update
- Water sourceLocal Authority
Complaints to RERA about this project
None on RERA Karnataka.
Documents
212 files on the RERA page: Approved plan ↗, Commencement certificate ↗.
CaveatAs filed on RERA Karnataka. Complaints are listed without the names of the people who filed them.
Project cost
Money from buyers, each quarter
| Quarter | Collected from buyers | Withdrawn from the project account |
|---|---|---|
| Q1 2026-27 | ₹11.4 cr | ₹0.0 lakh |
| Q2 2026-27 | ₹76.0 cr | ₹8.4 cr |
Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.
CaveatCost as certified by the builder's chartered accountant at registration.
What's around it?
Open the full location report on the map
Metro, rail, bus, airport
- Nearest operational metro station8.04 kmReliable
- Nearest railway station5.37 kmReliable
- Bus stops within 500 m0Caveat
Parks, shops, daily needs
- Supermarkets within 1 km0Caveat
- Parks within 1 km0Caveat
- Nearest lake / water body (≥2 ha)0.7 kmCaveat
Hospitals
- Nearest hospital1.27 kmCaveat
Schools
- Schools in pincode 562125 (UDISE+ census)91Caveat
Police and crime
- Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
- Police station jurisdictionSarjapura PSReliable
Flood and waterlogging
- BBMP-listed flood / low-lying spots within 1 km0Caveat
Water availability
- Groundwater stage (CGWB block assessment)Over ExploitedCaveat
Power reliability
- Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
- Un/partially-electrified layouts within 1 km0Caveat
Landfills, sewage plants, industry, aircraft
- Nearest named landfill / dump site (≥2 ha)10.41 kmReliable
- Nearest sewage treatment plant5.04 kmCaveat
- Industrial zones within 1 km4Caveat
- Nearest airfield runway (any, incl. military)10.58 kmCaveat
- Nearest commercial-airport runway34.85 kmReliable
- Distance to runway approach-path proxy33.79 kmCaveat
Upcoming infrastructure
- Under-construction projects within 3 km (verified)0Reliable
- Earlier-stage projects within 3 km (sanctioned/tendered/observed)2Caveat
ReliableFrom our location report at the builder-entered pin (12.87445, 77.74221), 2026-10-24. Each figure's source and caveat are in the full report.