RERA project · Residential/Group Housing

Nambiar District 25 Phase 2

by Nambiar EnsembleResidential Projects LLP · 816 homes · 8.62 acres · 6 towers · Anekal

Upcoming Under construction, due Aug 2030. 8% built with 23% of the time used. 86% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
8% built

Due 31 Aug 2030. 23% of the time from RERA approval to the deadline has passed.

Built8%
Time used23%
How much is sold?111 left
86% booked

705 of 816 homes, as the builder reported for Q2 2026-27.

How crowded is it?More crowded
95 homes per acre

Similar projects within 3 km: 70 per acre. 86% of the land is left open.

Any complaints?See the list
2 complaints

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?Too early to tell
No deliveries yet

None of its 3 RERA projects in Bengaluru Urban has reached its deadline yet.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Approved by RERA20 Aug 2025
  2. Work started1 Sep 2025
  3. Today24 Oct 2026

    23% of the time to the deadline has passed.

  4. If it slips like a typical project2 Jun 2031

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-265%
Q4 2025-266%
Q1 2026-277%
Q2 2026-278%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

Tower 70%
Tower 80%
Tower 90%
Tower 100%
Tower 110%
Tower 120%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

705 booked111 leftQ2 2026-27

Still available: 8 × 2 BHK, 61 × 4 BHK, 41 × 3 BHK 3T, 1 × 3 BHK 2T.

Booked, by type

2 BHK70 of 78
4 BHK207 of 268
3 BHK 3T361 of 402
3 BHK 2T67 of 68

Booked, each quarter

Q3 2025-26547 of 816
Q4 2025-26668 of 816
Q1 2026-27701 of 816
Q2 2026-27705 of 816

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3 BHK 3T
1,302 sq ft
121 m² carpet · sizes 1,125–1,302 sq ft (136 at this size)
39 m² land share · 4 m² balcony/terrace · 1 parking space
402 homes · 49% of the project
4 BHK
1,649 sq ft
153 m² carpet · sizes 1,649–1,958 sq ft (134 at this size)
57 m² land share · 6 m² balcony/terrace · 1 parking space
268 homes · 33% of the project
2 BHK
808 sq ft
75 m² carpet · sizes 808–1,311 sq ft (68 at this size)
26 m² land share · 3 m² balcony/terrace · 1 parking space
78 homes · 10% of the project
3 BHK 2T
964 sq ft
90 m² carpet · sizes 915–964 sq ft (64 at this size)
30 m² land share · 3 m² balcony/terrace · 1 parking space
68 homes · 8% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Tower 734 floors
Tower 834 floors
Tower 934 floors
Tower 1034 floors
Tower 1134 floors
Tower 1234 floors

Tower 7: 136 homes, 104 m tall, 2 basements · Tower 8: 136 homes, 104 m tall, 2 basements · Tower 9: 136 homes, 104 m tall, 2 basements · Tower 10: 136 homes, 104 m tall, 2 basements · Tower 11: 136 homes, 104 m tall, 2 basements · Tower 12: 136 homes, 104 m tall, 2 basements

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project95
Typical within 3 km (81)70
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project86%
Typical within 3 km (83)67%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
8.62 acres

34,874 m²

Ground covered by buildings
14% of the land

4,829 m²

Floor-area ratio
146081.00

Floors built per unit of land: 146081.00 m² of floors for each m² of land.

Parking
1.71 per home

1,363 covered, 30 open

Built-up area, all floors
23,35,013 sq ft

2,16,930 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 3 RERA projects of Nambiar EnsembleResidential Projects LLP on the map

The company

Registered as
Nambiar EnsembleResidential Projects LLP
Type
Partnership Firm
Company number
ACD-9470

CIN or LLPIN, from the Registrar of Companies.

PAN
AAJFE5673N
GSTIN
29AAJFE5673N1ZN

Its other registrations on RERA Karnataka

The land is owned together with others (a joint development), including Nambiar EnsembleCommercial Projects LLP.

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹315.3 crBuilding and development ₹1154.4 crTotal ₹1469.7 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹153.4 cr₹130.6 cr
Q4 2025-26₹179.8 cr₹117.9 cr
Q1 2026-27₹128.0 cr₹96.1 cr
Q2 2026-27₹77.2 cr₹9.2 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station9.39 kmReliable
  • Nearest railway station6.17 kmReliable
  • Bus stops within 500 m3Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km1Caveat
  • Parks within 1 km0Caveat
  • Nearest lake / water body (≥2 ha)0.55 kmCaveat

Hospitals

  • Nearest hospital0.45 kmCaveat

Schools

  • Schools in pincode 562125 (UDISE+ census)91Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km5Caveat
  • Median pupil-teacher ratio, schools within 1 km26.4 :1Caveat
  • Schools with library + playground + ICT lab (1 km)2Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionSarjapura PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)11.62 kmReliable
  • Nearest sewage treatment plant6.41 kmCaveat
  • Industrial zones within 1 km1Caveat
  • Nearest airfield runway (any, incl. military)11.11 kmCaveat
  • Nearest commercial-airport runway34.54 kmReliable
  • Distance to runway approach-path proxy33.22 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)2Caveat

ReliableFrom our location report at the builder-entered pin (12.87807, 77.75428), 2026-10-24. Each figure's source and caveat are in the full report.