by M/s Mohan Builders · 225 homes · 3.12 acres · 3 towers · Bengaluru East

Upcoming Under construction, due Dec 2028. 35% built with 47% of the time used. 24% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
35% built

Due 30 Dec 2028. 47% of the time from RERA approval to the deadline has passed.

Built35%
Time used47%
How much is sold?170 left
24% booked

55 of 225 homes, as the builder reported for Q2 2026-27.

How crowded is it?Less crowded
72 homes per acre

Similar projects within 3 km: 82 per acre. 74% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?1 due so far
100% on time

Of its 2 RERA projects in Bengaluru Urban: 1 delivered on time, 1 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started1 Jun 2024
  2. Approved by RERA19 Nov 2024
  3. Today24 Oct 2026

    47% of the time to the deadline has passed.

  4. If it slips like a typical project1 Oct 2029

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2617%
Q4 2025-2625%
Q1 2026-2726%
Q2 2026-2735%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

Block A32%
Block B32%
Block C34%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

55 booked170 leftQ2 2026-27

Still available: 12 × 2.5 BHK, 131 × 3 BHK, 27 × 2 BHK.

Booked, by type

2.5 BHK12 of 24
3 BHK34 of 165
2 BHK9 of 36

Booked, each quarter

Q3 2025-2619 of 225
Q4 2025-2632 of 225
Q1 2026-2740 of 225
Q2 2026-2755 of 225

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3 BHK
1,031 sq ft
96 m² carpet · sizes 861–1,131 sq ft (24 at this size)
45 m² land share · 22 m² balcony/terrace · 1 parking space
165 homes · 73% of the project
2 BHK
765 sq ft
71 m² carpet · sizes 765–805 sq ft (12 at this size)
34 m² land share · 14 m² balcony/terrace · 1 parking space
36 homes · 16% of the project
2.5 BHK
834 sq ft
78 m² carpet · sizes 834–878 sq ft (12 at this size)
38 m² land share · 17 m² balcony/terrace · 1 parking space
24 homes · 11% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Block A12 floors
Block B12 floors
Block C12 floors

Block A: 48 homes, 40 m tall, 1 basement · Block B: 83 homes, 40 m tall, 1 basement · Block C: 94 homes, 40 m tall, 1 basement

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project72
Typical within 3 km (125)82
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project74%
Typical within 3 km (125)77%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
3.12 acres

12,621 m²

Ground covered by buildings
26% of the land

3,238 m²

Floor-area ratio
2.25

Floors built per unit of land: 2.25 m² of floors for each m² of land.

Parking
1.10 per home

216 covered, 32 open

Built-up area, all floors
4,08,867 sq ft

37,985 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 2 RERA projects of MOHAN BUILDERS on the map

The company

Registered as
M/s Mohan Builders
Type
Partnership Firm
PAN
ABJFM5288N
GSTIN
29ABJFM5288N1ZA

Its other registrations on RERA Karnataka

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹24.1 crBuilding and development ₹95.9 crTotal ₹120.0 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹8.2 cr₹5.7 cr
Q4 2025-26₹11.1 cr₹7.0 cr
Q1 2026-27₹11.6 cr₹8.8 cr
Q2 2026-27₹13.5 cr₹8.8 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station6.34 kmReliable
  • Nearest railway station2.96 kmReliable
  • Bus stops within 500 m0Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km1Caveat
  • Parks within 1 km6Caveat
  • Nearest lake / water body (≥2 ha)1.03 kmCaveat

Hospitals

  • Nearest hospital0.71 kmCaveat

Schools

  • Schools in pincode 560087 (UDISE+ census)55Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km4Caveat
  • Schools with library + playground + ICT lab (1 km)3Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionVarthur PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km1Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • Groundwater depth at nearest CGWB well33.1 m below groundCaveat
  • In an IISc groundwater-critical ward (2025 outlook)noCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km1Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)9.22 kmReliable
  • Nearest sewage treatment plant2.69 kmCaveat
  • Industrial zones within 1 km0Caveat
  • Nearest airfield runway (any, incl. military)6.1 kmCaveat
  • Nearest commercial-airport runway29.83 kmReliable
  • Distance to runway approach-path proxy29.02 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)6Caveat

ReliableFrom our location report at the builder-entered pin (12.91956, 77.73018), 2026-10-24. Each figure's source and caveat are in the full report.