RERA project · Residential/Group Housing

MISTA SRI CITY- BUDIGERE CROSS

by MISTA INFRA PRIVATE LIMITED · 250 homes · 3.70 acres · 1 tower · Bengaluru East

Upcoming Under construction, due Jun 2029. 20% built with 40% of the time used. 33% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
20% built

Due 30 Jun 2029. 40% of the time from RERA approval to the deadline has passed.

Built20%
Time used40%
How much is sold?168 left
33% booked

82 of 250 homes, as the builder reported for Q2 2026-27.

How crowded is it?About the same
68 homes per acre

Similar projects within 3 km: 72 per acre. 96% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?No other record
Only this project

It is the only RERA project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started28 Aug 2023
  2. Approved by RERA8 Jan 2025
  3. Today24 Oct 2026

    40% of the time to the deadline has passed.

  4. If it slips like a typical project1 Apr 2030

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2612%
Q4 2025-2614%
Q1 2026-2717%
Q2 2026-2720%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

82 booked168 leftQ2 2026-27

Still available: 63 × 2 BHK, 37 × 2.5 BHK, 34 × 3 BHK, 34 × 3.5 BHK.

Booked, by type

2 BHK37 of 100
2.5 BHK13 of 50
3 BHK16 of 50
3.5 BHK16 of 50

Booked, each quarter

Q3 2025-2657 of 250
Q4 2025-2666 of 250
Q1 2026-2776 of 250
Q2 2026-2782 of 250

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

2 BHK
  • 577 sq ft32 homes53.6 m²
  • 797 sq ft32 homes74.0 m²
  • 790 sq ft18 homes73.4 m²
  • 566 sq ft17 homes52.6 m²
  • and 1 home in other sizes
Typically 14 m² land share · 6 m² balcony/terrace · 1 parking space
100 homes · 40% of the project
3 BHK
  • 885 sq ft32 homes82.2 m²
  • 873 sq ft17 homes81.1 m²
  • 861 sq ft1 home80.0 m²
Typically 18 m² land share · 9 m² balcony/terrace · 1 parking space
50 homes · 20% of the project
3.5 BHK
  • 1,082 sq ft32 homes100.5 m²
  • 1,065 sq ft17 homes98.9 m²
  • 1,044 sq ft1 home97.0 m²
Typically 21 m² land share · 6 m² balcony/terrace · 1 parking space
50 homes · 20% of the project
2.5 BHK
  • 882 sq ft32 homes81.9 m²
  • 869 sq ft18 homes80.7 m²
Typically 18 m² land share · 9 m² balcony/terrace · 1 parking space
50 homes · 20% of the project

Carpet areas from the builder's flat-by-flat list on RERA, each size as listed with how many homes have it. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Residential Apartment block -0151 floors

Residential Apartment block -01: 250 homes, 156 m tall, 5 basements

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project68
Typical within 3 km (57)72
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project96%
Typical within 3 km (57)72%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
3.70 acres

14,991 m²

Ground covered by buildings
4% of the land

555 m²

Floor-area ratio
3.23

Floors built per unit of land: 3.23 m² of floors for each m² of land.

Parking
1.10 per home

210 covered, 65 open

Built-up area, all floors
4,07,188 sq ft

37,829 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

This is the only project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

The company

Registered as
MISTA INFRA PRIVATE LIMITED
Type
Company
Company number
U45500TG2020PTC140863

CIN or LLPIN, from the Registrar of Companies.

PAN
AANCM4920H
GSTIN
29AANCM4920H1Z6

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹13.9 crBuilding and development ₹122.3 crTotal ₹136.1 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹6.5 cr₹6.5 cr
Q4 2025-26₹2.5 cr₹2.4 cr
Q1 2026-27₹4.9 cr₹4.8 cr
Q2 2026-27₹3.2 cr₹3.3 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station5.89 kmReliable
  • Nearest railway station5.85 kmReliable
  • Bus stops within 500 m1Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km0Caveat
  • Nearest lake / water body (≥2 ha)0.68 kmCaveat

Hospitals

  • Nearest hospital2.07 kmCaveat

Schools

  • Schools in pincode 560049 (UDISE+ census)110Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionAvalahally PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • Groundwater depth at nearest CGWB well60.8 m below groundCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km1Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)4.54 kmReliable
  • Nearest sewage treatment plant1.27 kmCaveat
  • Industrial zones within 1 km5Caveat
  • Nearest airfield runway (any, incl. military)7.95 kmCaveat
  • Nearest commercial-airport runway15.82 kmReliable
  • Distance to runway approach-path proxy14.49 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)1Caveat

ReliableFrom our location report at the builder-entered pin (13.04893, 77.75501), 2026-10-24. Each figure's source and caveat are in the full report.