Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

MIMS OAKDALE I

by MIMS Builders Private Limited · 40 homes · 2.42 acres · 2 towers · Yelahanka

Upcoming Under construction, due May 2028. 28% built with 52% of the time used. 45% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
28% built

Due 31 May 2028. 52% of the time from RERA approval to the deadline has passed.

Built28%
Time used52%
How much is sold?22 left
45% booked

18 of 40 homes, as the builder reported for Q2 2026-27.

How crowded is it?Less crowded
16 homes per acre

Similar projects within 3 km: 44 per acre. 53% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?2 due so far
0% on time

Of its 4 RERA projects in Bengaluru Urban: 0 delivered on time, 2 late (after the date first promised), 2 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started15 Dec 2024
  2. Approved by RERA17 Jan 2025
  3. Today24 Oct 2026

    52% of the time to the deadline has passed.

  4. If it slips like a typical project2 Mar 2029

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2619%
Q4 2025-2622%
Q1 2026-2725%
Q2 2026-2728%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

Block - A29%
Block - B29%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

18 booked22 leftQ2 2026-27

Still available: 22 × 5 BHK.

Booked, by type

5 BHK18 of 40

Booked, each quarter

Q3 2025-263 of 40
Q4 2025-269 of 40
Q1 2026-2714 of 40
Q2 2026-2718 of 40

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

5 BHK
2,255 sq ft
210 m² carpet · sizes 2,207–2,255 sq ft (21 at this size)
233 m² land share · 70 m² balcony/terrace · 2 parking spaces
40 homes · 100% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Block - A2 floors
Block - B2 floors

Block - A: 21 homes, 10 m tall · Block - B: 19 homes, 10 m tall

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project16
Typical within 3 km (2)44
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project53%
Typical within 3 km (2)54%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
2.42 acres

9,813 m²

Ground covered by buildings
47% of the land

4,638 m²

Floor-area ratio
1.15

Floors built per unit of land: 1.15 m² of floors for each m² of land.

Parking
2.20 per home

80 covered, 8 open

Built-up area, all floors
1,26,831 sq ft

11,783 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 4 RERA projects of MIMS Builders Private Limited on the map

The company

Registered as
MIMS Builders Private Limited
Type
Company
Company number
U70101KA2006PTC038887

CIN or LLPIN, from the Registrar of Companies.

PAN
AAECM6198E
GSTIN
29AAECM6198E1Z3
Website
www.mimsbuilders.com

Its other registrations on RERA Karnataka

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹3.8 crBuilding and development ₹53.8 crTotal ₹57.6 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹49.5 lakh₹1.5 cr
Q4 2025-26₹6.8 cr₹3.5 cr
Q1 2026-27₹3.4 cr₹3.3 cr
Q2 2026-27₹7.5 cr₹3.1 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station20.89 kmReliable
  • Nearest railway station6.56 kmReliable
  • Bus stops within 500 m1Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km2Caveat
  • Nearest lake / water body (≥2 ha)0.7 kmCaveat

Hospitals

  • Nearest hospital6.46 kmCaveat

Schools

  • Schools in pincode 561203 (UDISE+ census)12Caveat
  • Median pupil-teacher ratio, schools within 1 km22.1 :1Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionRajanukunte PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)12.28 kmReliable
  • Nearest sewage treatment plant12.18 kmCaveat
  • Industrial zones within 1 km0Caveat
  • Nearest airfield runway (any, incl. military)11.63 kmCaveat
  • Nearest commercial-airport runway15.13 kmReliable
  • Distance to runway approach-path proxy6.99 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)0Caveat

ReliableFrom our location report at the builder-entered pin (13.23161, 77.54885), 2026-10-24. Each figure's source and caveat are in the full report.