Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

MEDA EAST WINDS

by MEDA PROJECTS · 542 homes · 8.36 acres · 11 towers · Bengaluru East

Upcoming Under construction, due Dec 2028. 53% built with 46% of the time used. 46% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
53% built

Due 30 Dec 2028. 46% of the time from RERA approval to the deadline has passed.

Built53%
Time used46%
How much is sold?295 left
46% booked

247 of 542 homes, as the builder reported for Q2 2026-27.

How crowded is it?Less crowded
65 homes per acre

Similar projects within 3 km: 80 per acre. 73% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?No other record
Only this project

It is the only RERA project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started3 Apr 2024
  2. Approved by RERA26 Dec 2024
  3. Today24 Oct 2026

    46% of the time to the deadline has passed.

  4. If it slips like a typical project1 Oct 2029

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2634%
Q4 2025-2637%
Q1 2026-2744%
Q2 2026-2753%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

Tower 150%
Tower 255%
Tower 355%
Tower 455%
Tower 555%
Tower 665%
Tower 765%
Tower 865%
Tower 965%
Tower 1065%
Tower 1175%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

247 booked295 leftQ2 2026-27

Still available: 43 × 3.5 BHK, 107 × 3 BHK, 80 × 2 BHK, 26 × 1 BHK, 39 × 4 BHK.

Booked, by type

3.5 BHK1 of 44
3 BHK131 of 238
2 BHK76 of 156
1 BHK34 of 60
4 BHK5 of 44

Booked, each quarter

Q3 2025-26149 of 542
Q4 2025-26208 of 542
Q1 2026-27241 of 542
Q2 2026-27247 of 542

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3 BHK
1,061 sq ft
99 m² carpet · sizes 906–1,061 sq ft (86 at this size)
64 m² land share · 1 parking space
238 homes · 44% of the project
2 BHK
827 sq ft
77 m² carpet · sizes 692–828 sq ft (126 at this size)
50 m² land share · 1 parking space
156 homes · 29% of the project
1 BHK
397 sq ft
37 m² carpet
24 m² land share · 1 parking space
60 homes · 11% of the project
3.5 BHK
1,194 sq ft
111 m² carpet · sizes 1,158–1,194 sq ft (22 at this size)
74 m² land share · 1 parking space
44 homes · 8% of the project
4 BHK
1,516 sq ft
141 m² carpet · sizes 1,516–1,580 sq ft (22 at this size)
93 m² land share · 1 parking space
44 homes · 8% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Tower 111 floors
Tower 211 floors
Tower 311 floors
Tower 411 floors
Tower 511 floors
Tower 610 floors
Tower 710 floors
Tower 810 floors
Tower 911 floors
Tower 1011 floors
Tower 1111 floors

Tower 1: 44 homes, 35 m tall, 1 basement · Tower 2: 44 homes, 35 m tall, 1 basement · Tower 3: 44 homes, 35 m tall, 1 basement · Tower 4: 44 homes, 35 m tall, 1 basement · Tower 5: 44 homes, 35 m tall, 1 basement · Tower 6: 50 homes, 32 m tall, 1 basement · Tower 7: 70 homes, 32 m tall, 1 basement · Tower 8: 70 homes, 32 m tall, 1 basement · Tower 9: 44 homes, 35 m tall, 1 basement · Tower 10: 44 homes, 35 m tall, 1 basement · Tower 11: 44 homes, 35 m tall, 1 basement

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project65
Typical within 3 km (124)80
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project73%
Typical within 3 km (124)74%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
8.36 acres

33,841 m²

Ground covered by buildings
27% of the land

9,144 m²

Floor-area ratio
2.25

Floors built per unit of land: 2.25 m² of floors for each m² of land.

Parking
1.39 per home

754 covered, 0 open

Built-up area, all floors
11,87,054 sq ft

1,10,281 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

This is the only project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

The company

Registered as
MEDA PROJECTS
Type
Proprietorship
PAN
ABRFM9235F
GSTIN
29ABRFM9235F1ZO

The land is owned together with others (a joint development), including MEDA PROJECTS REP. bY ITS PARTNER Mr. Meda Sai Krishna Reddy.

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹103.2 crBuilding and development ₹401.8 crTotal ₹504.9 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹40.1 cr₹41.0 cr
Q4 2025-26₹56.9 cr₹59.5 cr
Q1 2026-27₹38.8 cr₹40.4 cr
Q2 2026-27₹30.5 cr₹30.7 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station4.6 kmReliable
  • Nearest railway station3.24 kmReliable
  • Bus stops within 500 m1Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km2Caveat
  • Parks within 1 km4Caveat
  • Nearest lake / water body (≥2 ha)0.69 kmCaveat

Hospitals

  • Nearest hospital0.69 kmCaveat

Schools

  • Schools in pincode 560103 (UDISE+ census)22Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km3Caveat
  • Schools with library + playground + ICT lab (1 km)2Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionVarthur PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km1Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • Groundwater depth at nearest CGWB well4.5 m below groundCaveat
  • In an IISc groundwater-critical ward (2025 outlook)noCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)8.11 kmReliable
  • Nearest sewage treatment plant0.76 kmCaveat
  • Industrial zones within 1 km1Caveat
  • Nearest airfield runway (any, incl. military)3.35 kmCaveat
  • Nearest commercial-airport runway28 kmReliable
  • Distance to runway approach-path proxy27.47 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)1Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)5Caveat

ReliableFrom our location report at the builder-entered pin (12.93624, 77.71105), 2026-10-24. Each figure's source and caveat are in the full report.