Delivered on time Completed: the builder filed for completion on 3 Feb 2026, by the date it promised.
At a glance
The builder filed for completion on 3 Feb 2026, by the date it promised.
61 of 176 homes, as the builder reported for Q3 2025-26.
Similar projects within 3 km: 75 per acre. 76% of the land is left open.
Complaints to RERA about this project. 1 more about the builder's other projects.
No litigation on the land or the project, as the builder declares it to RERA.
Of its 2 RERA projects in Bengaluru Urban: 1 delivered on time, 1 late (after the date first promised).
These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.
Was it delivered on time?
- Work started1 May 2022
- Approved by RERA22 Jul 2022
- Completion filed3 Feb 2026
The builder told RERA the project is complete. Ask for the occupancy certificate before moving in.
How much is built, each quarter
Built, as the builder reports itTime used by then
When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.
CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.
How much is sold?
Still available: 54 × 2 BHK, 58 × 3 BHK, 1 × 3 BHK + Study, 2 × 4 BHK + Study.
Booked, by type
Booked means sold or reserved, as the builder reports it. It says nothing about prices.
CaveatFrom the builder's quarterly updates to RERA Karnataka.
What's being built?
Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.
Towers
Tower 1: 176 homes, 2 basements
Amenities
- Electricity
- CCTV Surveillance
- Club House
- Outdoor Sports facility
- Indoor Sports facility
- Swimming Pool
- Gym
- Water and Sanitation
CaveatAs registered by the builder on RERA Karnataka.
How crowded is it?
Homes per acre
Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.
Land left open
The share of the land not built on, which includes roads.
- Land
- 2.28 acres
- Ground covered by buildings
- 24% of the land
- Floor-area ratio
- 2.25
- Parking
- 1.37 per home
- Built-up area, all floors
- 3,67,254 sq ft
9,233 m²
2,206 m²
Floors built per unit of land: 2.25 m² of floors for each m² of land.
241 covered, 0 open
34,119 m²
CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.
Who is building it?
All 2 RERA projects of Mars Builders on the map
Complaints to RERA about its other projects
- MARS MOUNT 1 complaint
The company
- Registered as
- M/S MARS BUILDERS
- Type
- Partnership Firm
- PAN
- AAPFM1596A
- GSTIN
- 29AAPFM1596A1Z2
Its other registrations on RERA Karnataka
- MARS MOUNT PRM/KA/RERA/1251/310/PR/170922/000583 · approved 22 Sep 2017
CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.
Paperwork and legal
- Registered with RERAPRM/KA/RERA/1251/310/PR/220722/005096 · Approved
- Building plan approvedBBMP - Bruhat Bengaluru Mahanagara Palike · BBMP/ADDL.DIR/JDSOUTH/LP0090/17-18 · 31 May 2019
- Litigation on the landNone declared
- Litigation on the projectNone declared in the Q3 2025-26 update
- Water sourceBWSSB
Complaints to RERA about this project
None on RERA Karnataka.
Documents
171 files on the RERA page: Commencement certificate ↗, Brochure ↗.
CaveatAs filed on RERA Karnataka. Complaints are listed without the names of the people who filed them.
Project cost
Money from buyers, each quarter
| Quarter | Collected from buyers | Withdrawn from the project account |
|---|---|---|
| Q3 2025-26 | ₹8.3 cr | ₹5.8 cr |
Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.
CaveatCost as certified by the builder's chartered accountant at registration.
What's around it?
Open the full location report on the map
Metro, rail, bus, airport
- Nearest operational metro station2.51 kmReliable
- Nearest railway station2.76 kmReliable
- Bus stops within 500 m1Caveat
Parks, shops, daily needs
- Supermarkets within 1 km0Caveat
- Parks within 1 km3Caveat
- Nearest lake / water body (≥2 ha)0.59 kmCaveat
Hospitals
- Nearest hospital1.04 kmCaveat
Schools
- Schools in pincode 560085 (UDISE+ census)64Caveat
- Private (classes 1–10 or 1–12), government and central schools within 1 km14Caveat
- Median pupil-teacher ratio, schools within 1 km22 :1Caveat
- Schools with library + playground + ICT lab (1 km)5Caveat
Police and crime
- Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
- Police station jurisdictionGirinagar PSReliable
Air quality
- PM2.5, recent 24 h avg (nearest CPCB station)11 µg/m³Caveat
Flood and waterlogging
- BBMP-listed flood / low-lying spots within 1 km3Caveat
Water availability
- Groundwater stage (CGWB block assessment)Over ExploitedCaveat
- In an IISc groundwater-critical ward (2025 outlook)noCaveat
Power reliability
- Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
- Un/partially-electrified layouts within 1 km2Caveat
Landfills, sewage plants, industry, aircraft
- Nearest named landfill / dump site (≥2 ha)12.13 kmReliable
- Nearest sewage treatment plant1.29 kmCaveat
- Industrial zones within 1 km0Caveat
- Nearest airfield runway (any, incl. military)12.99 kmCaveat
- Nearest commercial-airport runway33.89 kmReliable
- Distance to runway approach-path proxy29.41 kmCaveat
Upcoming infrastructure
- Under-construction projects within 3 km (verified)0Reliable
- Earlier-stage projects within 3 km (sanctioned/tendered/observed)2Caveat
ReliableFrom our location report at the builder-entered pin (12.92211, 77.53751), 2026-10-24. Each figure's source and caveat are in the full report.