Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

MAHINDRA EDEN PHASE-1

by MAHINDRA LIFESPACE DEVELOPERS LIMITED · 277 homes · 3.12 acres · 2 towers · Bengaluru South

Delivered on time Completed: the builder filed for completion on 3 Jun 2026, by the date it promised.

Location report

At a glance

Was it on time?Delivered on time
Completed

The builder filed for completion on 3 Jun 2026, by the date it promised.

How much is sold?0 left
100% booked

277 of 277 homes, as the builder reported for Q4 2025-26.

How crowded is it?More crowded
89 homes per acre

Similar projects within 3 km: 75 per acre. 88% of the land is left open.

Any complaints?See the list
2 complaints

Complaints to RERA about this project. 2 more about the builder's other projects.

Any legal cases?Litigation
Declared

The builder declares litigation on the land or the project.

What is the builder's record?4 due so far
50% on time

Of its 8 RERA projects in Bengaluru Urban: 2 delivered on time, 2 late (after the date first promised), 4 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

Was it delivered on time?

  1. Approved by RERA30 Mar 2022
  2. Work started1 Apr 2022
  3. Completion filed3 Jun 2026

    The builder told RERA the project is complete. Ask for the occupancy certificate before moving in.

How much is built, each quarter

Q3 2025-2699%
Q4 2025-26100%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q4 2025-26

Wing-A100%
Wing-B100%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

277 booked0 leftQ4 2025-26

Booked, by type

1 BHK57 of 57
3 BHK164 of 164
2 BHK56 of 56

Booked, each quarter

Q3 2025-26277 of 277
Q4 2025-26277 of 277

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3 BHK
  • 1,062 sq ft58 homes98.7 m²
  • 1,290 sq ft54 homes119.8 m²
  • 1,135 sq ft52 homes105.4 m²
Typically 56 m² land share · 16 m² balcony/terrace · 1 parking space
164 homes · 59% of the project
1 BHK
  • 400 sq ft55 homes37.2 m²
  • 672 sq ft1 home62.4 m²
  • 778 sq ft1 home72.3 m²
Typically 19 m² land share · 4 m² balcony/terrace · 0 parking spaces
57 homes · 21% of the project
2 BHK
  • 778 sq ft55 homes72.3 m²
  • 590 sq ft1 home54.8 m²
Typically 38 m² land share · 10 m² balcony/terrace · 1 parking space
56 homes · 20% of the project

Carpet areas from the builder's flat-by-flat list on RERA, each size as listed with how many homes have it. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Wing-A26 floors
Wing-B28 floors

Wing-A: 107 homes, 82 m tall, 2 basements · Wing-B: 170 homes, 88 m tall, 2 basements

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project89
Typical within 3 km (57)75
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project88%
Typical within 3 km (57)63%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
3.12 acres

12,621 m²

Ground covered by buildings
12% of the land

1,471 m²

Floor-area ratio
2.24

Floors built per unit of land: 2.24 m² of floors for each m² of land.

Parking
0.91 per home

251 covered, 0 open

Built-up area, all floors
3,87,780 sq ft

36,026 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 8 RERA projects of Mahindra Lifespaces on the map

Complaints to RERA about its other projects

The company

Registered as
MAHINDRA LIFESPACE DEVELOPERS LIMITED
Type
Company
Company number
L45200MH1999PLC118949

CIN or LLPIN, from the Registrar of Companies.

PAN
AAACG8904C
GSTIN
29AAACG8904C1ZR
Website
www.mahindralifespaces.com

Its other registrations on RERA Karnataka

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹40.0 crBuilding and development ₹168.9 crTotal ₹208.9 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹1.2 cr₹11.0 cr
Q4 2025-26₹14.7 cr₹39.7 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station0.58 kmReliable
  • Nearest railway station8.35 kmReliable
  • Bus stops within 500 m2Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km3Caveat
  • Parks within 1 km9Caveat
  • Nearest lake / water body (≥2 ha)1.27 kmCaveat

Hospitals

  • Nearest hospital1.08 kmCaveat

Schools

  • Schools in pincode 560062 (UDISE+ census)66Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km11Caveat
  • Median pupil-teacher ratio, schools within 1 km18.1 :1Caveat
  • Schools with library + playground + ICT lab (1 km)7Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionThalaghattapura PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km1Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • Groundwater depth at nearest CGWB well8.2 m below groundCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km1Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)7.01 kmReliable
  • Nearest sewage treatment plant4.47 kmCaveat
  • Industrial zones within 1 km3Caveat
  • Nearest airfield runway (any, incl. military)14.93 kmCaveat
  • Nearest commercial-airport runway38.88 kmReliable
  • Distance to runway approach-path proxy34.94 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)0Caveat

ReliableFrom our location report at the builder-entered pin (12.86888, 77.54312), 2026-10-24. Each figure's source and caveat are in the full report.