RERA project · Mixed Development

MAHINDRA BLOSSOM

by MAHINDRA LIFESPACE DEVELOPERS LIMITED · 735 homes · 9.37 acres · 7 towers · Bengaluru East

Upcoming Under construction, due Oct 2030. 1% built with 17% of the time used. 66% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
1% built

Due 31 Oct 2030. 17% of the time from RERA approval to the deadline has passed.

Built1%
Time used17%
How much is sold?251 left
66% booked

484 of 735 homes, as the builder reported for Q4 2025-26.

How crowded is it?About the same
78 homes per acre

Similar projects within 3 km: 78 per acre. 72% of the land is left open.

Any complaints?See the list
1 complaint

Complaints to RERA about this project. 3 more about the builder's other projects.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?4 due so far
50% on time

Of its 8 RERA projects in Bengaluru Urban: 2 delivered on time, 2 late (after the date first promised), 4 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Approved by RERA17 Dec 2025
  2. Work started1 Jan 2026
  3. Today24 Oct 2026

    17% of the time to the deadline has passed.

  4. If it slips like a typical project2 Aug 2031

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-260%
Q4 2025-261%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q4 2025-26

Wing A1%
Wing B1%
Wing C1%
Wing D1%
Wing E1%
Wing F1%
Retail1%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

484 booked251 leftQ4 2025-26

Still available: 8 × 2 BHK+S, 16 × 3 BHK, 66 × 3 BHK+S, 114 × 4 BHK, 1 × 2 BHK, 4 × 2BHK+S, 42 × 3BHK+S.

Booked, by type

1 BHK68 of 68
2 BHK+S2 of 10
3 BHK193 of 209
3 BHK+S37 of 103
4 BHK38 of 152
2 BHK134 of 135
2BHK+S0 of 4
3BHK+S10 of 52
COMMERCIAL2 of 2

Booked, each quarter

Q3 2025-260 of 631
Q4 2025-26484 of 735

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3 BHK
1,063 sq ft
99 m² carpet · sizes 1,063–1,308 sq ft (78 at this size)
33 m² land share · 16 m² balcony/terrace · 1 parking space
207 homes · 28% of the project
4 BHK
1,488 sq ft
138 m² carpet · sizes 1,488–1,516 sq ft (101 at this size)
42 m² land share · 19 m² balcony/terrace · 1 parking space
150 homes · 21% of the project
2 BHK
776 sq ft
72 m² carpet · sizes 749–1,063 sq ft (54 at this size)
22 m² land share · 9 m² balcony/terrace · 1 parking space
135 homes · 18% of the project
3 BHK+S
1,297 sq ft
120 m² carpet · sizes 1,297–1,316 sq ft (52 at this size)
38 m² land share · 19 m² balcony/terrace · 1 parking space
103 homes · 14% of the project
1 BHK
400 sq ft
37 m² carpet · sizes 400–586 sq ft (52 at this size)
11 m² land share · 3 m² balcony/terrace · 1 parking space
67 homes · 9% of the project
3BHK+S
1,297 sq ft
120 m² carpet
38 m² land share · 19 m² balcony/terrace · 1 parking space
52 homes · 7% of the project
2 BHK+S
1,100 sq ft
102 m² carpet · sizes 845–1,135 sq ft (4 at this size)
33 m² land share · 18 m² balcony/terrace · 1 parking space
10 homes · 1% of the project
2BHK+S
1,100 sq ft
102 m² carpet
33 m² land share · 19 m² balcony/terrace · 1 parking space
4 homes · 1% of the project
COMMERCIAL
6,522 sq ft
606 m² carpet
865 m² land share · 266 m² balcony/terrace
2 homes · 0% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Wing A29 floors
Wing B29 floors
Wing C29 floors
Wing D28 floors
Wing E28 floors
Wing F27 floors
Retail1 floor

Wing A: 112 homes, 87 m tall · Wing B: 163 homes, 87 m tall · Wing C: 110 homes, 87 m tall, 1 basement · Wing D: 108 homes, 87 m tall, 1 basement · Wing E: 133 homes, 87 m tall, 1 basement · Wing F: 107 homes, 84 m tall, 1 basement · Retail: 2 homes, 8 m tall

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project78
Typical within 3 km (7)78
Typical in the city (114)79

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project72%
Typical within 3 km (7)72%
Typical in the city (118)62%

The share of the land not built on, which includes roads.

Land
9.37 acres

37,911 m²

Ground covered by buildings
28% of the land

10,507 m²

Floor-area ratio
2.88

Floors built per unit of land: 2.88 m² of floors for each m² of land.

Parking
1.51 per home

1,110 covered, 0 open

Built-up area, all floors
16,48,739 sq ft

1,53,173 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active mixed development projects with a land area on RERA; the comparison is ours.

Who is building it?

All 8 RERA projects of Mahindra Lifespaces on the map

Complaints to RERA about its other projects

The company

Registered as
MAHINDRA LIFESPACE DEVELOPERS LIMITED
Type
Company
Company number
L45200MH1999PLC118949

CIN or LLPIN, from the Registrar of Companies.

PAN
AAACG8904C
GSTIN
29AAACG8904C1ZR
Website
www.mahindralifespaces.com

Its other registrations on RERA Karnataka

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹386.7 crBuilding and development ₹819.3 crTotal ₹1206.0 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹0.0 lakh₹0.0 lakh
Q4 2025-26₹96.4 cr₹0.0 lakh

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station0.17 kmReliable
  • Nearest railway station1.46 kmReliable
  • Bus stops within 500 m10Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km3Caveat
  • Parks within 1 km8Caveat
  • Nearest lake / water body (≥2 ha)1.34 kmCaveat

Hospitals

  • Nearest hospital0.65 kmCaveat

Schools

  • Schools in pincode 560066 (UDISE+ census)44Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km4Caveat
  • Schools with library + playground + ICT lab (1 km)2Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionKadugodi PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • In an IISc groundwater-critical ward (2025 outlook)yesCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km6Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)10.83 kmReliable
  • Nearest sewage treatment plant1.79 kmCaveat
  • Industrial zones within 1 km8Caveat
  • Nearest airfield runway (any, incl. military)6.07 kmCaveat
  • Nearest commercial-airport runway22.61 kmReliable
  • Distance to runway approach-path proxy21.37 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)2Caveat

ReliableFrom our location report at the builder-entered pin (12.98641, 77.75259), 2026-10-24. Each figure's source and caveat are in the full report.