RERA project · Residential/Group Housing
Mahaveer Highlands
by REDDY STRUCTURES PRIVATE LIMITED · 312 homes · 2.72 acres · 4 towers · Bengaluru South
Upcoming Under construction, due Mar 2027. 92% built with 90% of the time used. 83% of homes booked.
At a glance
Due 31 Mar 2027. 90% of the time from RERA approval to the deadline has passed.
259 of 312 homes, as the builder reported for Q2 2026-27.
Similar projects within 3 km: 91 per acre. 51% of the land is left open.
Complaints to RERA about this project. 101 more about the builder's other projects.
No litigation on the land or the project, as the builder declares it to RERA.
Of its 27 RERA projects in Bengaluru Urban: 0 delivered on time, 8 late (after the date first promised), 16 past due with no completion filed, 3 under way.
These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.
When will it be ready?
- Work started1 Aug 2022
- Approved by RERA22 Sep 2022
- Today24 Oct 2026
90% of the time to the deadline has passed.
- Deadline31 Mar 2027
The date it must be complete by.
- If it slips like a typical project31 Dec 2027
35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.
How much is built, each quarter
Built, as the builder reports itTime used by then
When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.
By tower, Q2 2026-27
CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.
How much is sold?
Still available: 2 × 1 BHK, 34 × 2 BHK, 17 × 3 BHK.
Booked, by type
Booked, each quarter
Booked means sold or reserved, as the builder reports it. It says nothing about prices.
CaveatFrom the builder's quarterly updates to RERA Karnataka.
What's being built?
Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.
Towers
Block-A: 78 homes, 35 m tall, 2 basements · Block-B: 78 homes, 35 m tall, 2 basements · Block-C: 78 homes, 35 m tall, 2 basements · Block-D: 78 homes, 35 m tall, 2 basements
Amenities
- Electricity
- CCTV Surveillance
- Club House 466 m²
- Community Hall
- Indoor Sports facility
- Swimming Pool
- Gym
- Parks
- Power Backup
- Water and Sanitation
CaveatAs registered by the builder on RERA Karnataka.
How crowded is it?
Homes per acre
Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.
Land left open
The share of the land not built on, which includes roads.
- Land
- 2.72 acres
- Ground covered by buildings
- 49% of the land
- Floor-area ratio
- 2.75
- Parking
- 0.96 per home
- Built-up area, all floors
- 5,35,665 sq ft
11,027 m²
5,400 m²
Floors built per unit of land: 2.75 m² of floors for each m² of land.
258 covered, 43 open
49,765 m²
CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.
Who is building it?
All 27 RERA projects of Mahaveer Group on the map
Complaints to RERA about its other projects
101 complaints across 6 projects. The most complained about:
- MAHAVEER PALATIUM 76 complaints
- MAHAVEER TRIDENT 14 complaints
- MAHAVEER PROMENADE 6 complaints
- MAHAVEER TURQUOISE 3 complaints
- Mahaveer Palatium Sy No 41 1 complaint
Show all 6 projects
- MAHAVEER WILLET 1 complaint
The company
- Registered as
- REDDY STRUCTURES PRIVATE LIMITED
- Type
- Company
- Company number
- U07010KA2002PTC031181
- PAN
- AACCR6953L
- GSTIN
- 29AACCR6953L1ZQ
- Website
- www.mahaveergroup.in
CIN or LLPIN, from the Registrar of Companies.
Its other registrations on RERA Karnataka
10 registrations under this company
- MAHAVEER CREST PRM/KA/RERA/1251/446/PR/170726/008823 · approved 17 Jul 2026
- Mahaveer Camelia PRM/KA/RERA/1251/446/PR/041122/005406 · approved 4 Nov 2022
- Mahaveer Rarus PRM/KA/RERA/1251/310/PR/220817/005160 · approved 17 Aug 2022
- Mahaveer Palatium Sy No 41 PRM/KA/RERA/1251/308/PR/220221/004719 · approved 21 Feb 2022
- MAHAVEER TRIDENT PRM/KA/RERA/1251/310/PR/190219/002385 · approved 19 Feb 2019
- MAHAVEER WILLET PRM/KA/RERA/1251/446/PR/171015/000828 · approved 15 Oct 2017
- MAHAVEER PALATIUM PRM/KA/RERA/1251/308/PR/171015/000357 · approved 15 Oct 2017
- MAHAVEER MERIDIAN PRM/KA/RERA/1251/310/PR/171015/000467 · approved 15 Oct 2017
- MAHAVEER PROMENADE PRM/KA/RERA/1251/446/PR/171015/000455 · approved 15 Oct 2017
- MAHAVEER TURQUOISE PRM/KA/RERA/1251/310/PR/171014/000777 · approved 14 Oct 2017
The land is owned together with others (a joint development).
CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.
Paperwork and legal
- Registered with RERAPRM/KA/RERA/1251/310/PR/220922/005266 · Approved
- Building plan approvedLocal Planing Authority · BMICAPA/NAYO-3/Building Sanction/7/2016-17/1496 · 7 Aug 2019
- Litigation on the landNone declared
- Litigation on the projectNone declared in the Q2 2026-27 update
- Water sourceBoreWell,BWSSB
Complaints to RERA about this project
- EOI Amount Refund 4 Jul 2023 · Disposed Authority Bench6
Documents
140 files on the RERA page: Approved plan ↗, Commencement certificate ↗, Brochure ↗.
CaveatAs filed on RERA Karnataka. Complaints are listed without the names of the people who filed them.
Project cost
Money from buyers, each quarter
| Quarter | Collected from buyers | Withdrawn from the project account |
|---|---|---|
| Q3 2025-26 | ₹14.9 cr | ₹0.0 lakh |
| Q4 2025-26 | ₹4.3 cr | ₹0.0 lakh |
| Q1 2026-27 | ₹13.3 cr | ₹0.0 lakh |
| Q2 2026-27 | ₹7.7 cr | ₹0.0 lakh |
Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.
CaveatCost as certified by the builder's chartered accountant at registration.
What's around it?
Open the full location report on the map
Metro, rail, bus, airport
- Nearest operational metro station1.95 kmReliable
- Nearest railway station1.47 kmReliable
- Bus stops within 500 m2Caveat
Parks, shops, daily needs
- Supermarkets within 1 km0Caveat
- Parks within 1 km2Caveat
- Nearest lake / water body (≥2 ha)0.79 kmCaveat
Hospitals
- Nearest hospital1.23 kmCaveat
Schools
- Schools in pincode 560060 (UDISE+ census)105Caveat
Police and crime
- Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
- Police station jurisdictionKengeri PSReliable
Flood and waterlogging
- BBMP-listed flood / low-lying spots within 1 km0Caveat
Water availability
- Groundwater stage (CGWB block assessment)Over ExploitedCaveat
Power reliability
- Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
- Un/partially-electrified layouts within 1 km0Caveat
Landfills, sewage plants, industry, aircraft
- Nearest named landfill / dump site (≥2 ha)16.86 kmReliable
- Nearest sewage treatment plant1.5 kmCaveat
- Industrial zones within 1 km1Caveat
- Nearest airfield runway (any, incl. military)19.87 kmCaveat
- Nearest commercial-airport runway37.58 kmReliable
- Distance to runway approach-path proxy31.88 kmCaveat
Upcoming infrastructure
- Under-construction projects within 3 km (verified)0Reliable
- Earlier-stage projects within 3 km (sanctioned/tendered/observed)0Caveat
ReliableFrom our location report at the builder-entered pin (12.92506, 77.47249), 2026-10-24. Each figure's source and caveat are in the full report.